Solicitation Amendment W50S8K26QA0020002 SF 30.pdf
PDF 4 MB Posted
- Solicitation number
- W50S8K26QA002
About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract, Amendment Number 0002, issued by the W70J U.S. Property and Facilities Operations Activity MOANG 131, Kansas City, Missouri, with an effective date of July 31, 2026.
The amendment extends the response due date from August 5, 2026 to August 11, 2026 at 10:00 AM local time for solicitation W50S8K26QA002. The primary modification involves CLIN 0001 for the Base Project for LTUY202005 to Construct Vehicle Operations Covered Parking. The scope requires the contractor to provide all labor, materials, plant, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to construct new covered parking structures. The project includes 24 bollards (two per column on entrance sides of each structure) at the base project price, with exact bollard locations to be determined post-award. The amendment updates the specification reference from "drawings and specifications dated 2 July 2024" to "attached drawings and specifications" to reflect the inclusion of new revision documents dated July 24, 2026. Four new contract documents have been added: Amendment 2 Cover Sheet, Amendment 2 Enlarged Architectural Site Plan, Amendment 2 Electrical Sheets (E001-E101-E201), and Amendment 2 Specification 09 90 00 (Paints and Coatings). All previous terms and conditions remain unchanged and in full force and effect. Offerors must acknowledge receipt of this amendment prior to the new August 11, 2026 deadline through one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or submitting a separate written communication referencing the solicitation and amendment numbers.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
Response Due Date
05 Aug 2026 11 Aug 2026
Continuation of Supplies or Services and Prices/Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description BASE PROJECT FOR LTUY202005
CONSTRUCT VEHICLE
OPERATIONS COVERED
PARKING
Non-personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to construct new covered parking structures in accordance with the drawings and specifications dated 2 July 2024.
Include 24 bollards (two each per column on entrance sides of each structure) in base project price.
Exact location of bollards to be determined after award.
BASE PROJECT FOR LTUY202005
CONSTRUCT VEHICLE
OPERATIONS COVERED
PARKING
Non-personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to construct new covered parking structures in accordance with the attached drawings and specifications. Include 24 bollards (two each per column on entrance sides of each structure) in base project price. Exact location of bollards to be determined after award.
List of Contract Documents, Exhibits, or Attachments
W50S8K26QA0020002
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 A3 Covered Parking Drawings 20240702
Drawings 02 Jul 2024 Attach ment
No
0002 A3 Covered Parking Specifications 20240702
Specification 02 Jul 2024 Attach ment
No
0003 A3 Revision 1 20240827
Supporting Technical Documentation
27 Aug
Attach ment
No
0004 A3 Revision 1 A600 -
BUILDING
SECTIONS -
R1_SS
Drawings 27 Aug
Attach ment
No
0005 B4 WD_MO202
60089_Mod 0_20260102
Wage Determination 18 May
Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 A3 Covered Parking Drawings 20240702
Drawings 02 Jul 2024 Attach ment
No
0002 A3 Covered Parking Specifications 20240702
Specification 02 Jul 2024 Attach ment
No
0003 A3 Revision 1 20240827
Supporting Technical Documentation
27 Aug
Attach ment
No
0004 A3 Revision 1 A600 -
BUILDING
Drawings 27 Aug
Attach ment
No
SECTIONS -
R1_SS
0005 B4 WD_MO202
60089_Mod 0_20260102
Wage Determination 18 May
Attach ment
No
0006 A3 Amendment 2_A000 -
COVER
SHEET -
R2_20260724
Drawings 24 Jul 2026 Attach ment
No
0007 A3 Amendment 2_A120 -
ENLARGED A
RCHITECTUR
AL SITE PLAN
- R2_20260724
Drawings 24 Jul 2026 Attach ment
No
0008 A3 Amendment 2_E001-E101- E201_2026072
Drawings 24 Jul 2026 Attach ment
No
0009 A3 Amendment 2_Spec 09 90 00_20260724
Specification 24 Jul 2026 Attach ment
No
The following contract documents were added:
A3 Amendment 2_A000 - COVER SHEET - R2_20260724 A3 Amendment 2_A120 - ENLARGED ARCHITECTURAL SITE PLAN - R2_20260724 A3 Amendment 2_E001-E101-E201_20260724 A3 Amendment 2_Spec 09 90 00_20260724
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
A3 Amendment 2_A000 - COVER SHEET - R2_20260724 none
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0002 |
| EffDate: 31 JUL 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W50S8K |
| AdmCode: |
| IssuedBy: W7NJ USPFO ACTIVITY MOANG 131 |
KO FOR MOANG DO NOT DELETE, 29 SHERMAN AVENUE
SAINT LOUIS, MO 63125-4117
UNITED STATES
JOSEPH BERNIER, EMAIL: JOSEPH.BERNIER.1@US.AF.MIL TELEPHONE: (314) 527-8033
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W50S8K26QA002 |
| SolDate: 16 JUN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to extend the due date to 11 August 2026 at 10:00 AM local time and add the following Revision 2 Addendum dated 24 July 2026 drawing & specification documents: |
A. A000 Cover Sheet B. A120 Enlarged Architectural Site Plan C. E001, E101, and E201 Electrical Sheets D. Specification 09 90 00 Paints and Coatings
| ContNameTitle: |
| CoNameTitle: JOSEPH BERNIER |
| ContDate: |
| CODate: 31 JUL 2026 |