Solicitation Amendment W50S8K26QA0020002 SF 30.pdf

PDF 4 MB Posted

Attached to
LTUY202005 Construct Vehicle Operations Covered Parking
Solicitation number
W50S8K26QA002
Issued by

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract, Amendment Number 0002, issued by the W70J U.S. Property and Facilities Operations Activity MOANG 131, Kansas City, Missouri, with an effective date of July 31, 2026.

The amendment extends the response due date from August 5, 2026 to August 11, 2026 at 10:00 AM local time for solicitation W50S8K26QA002. The primary modification involves CLIN 0001 for the Base Project for LTUY202005 to Construct Vehicle Operations Covered Parking. The scope requires the contractor to provide all labor, materials, plant, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to construct new covered parking structures. The project includes 24 bollards (two per column on entrance sides of each structure) at the base project price, with exact bollard locations to be determined post-award. The amendment updates the specification reference from "drawings and specifications dated 2 July 2024" to "attached drawings and specifications" to reflect the inclusion of new revision documents dated July 24, 2026. Four new contract documents have been added: Amendment 2 Cover Sheet, Amendment 2 Enlarged Architectural Site Plan, Amendment 2 Electrical Sheets (E001-E101-E201), and Amendment 2 Specification 09 90 00 (Paints and Coatings). All previous terms and conditions remain unchanged and in full force and effect. Offerors must acknowledge receipt of this amendment prior to the new August 11, 2026 deadline through one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or submitting a separate written communication referencing the solicitation and amendment numbers.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date

05 Aug 2026 11 Aug 2026

Continuation of Supplies or Services and Prices/Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description BASE PROJECT FOR LTUY202005

CONSTRUCT VEHICLE

OPERATIONS COVERED

PARKING

Non-personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to construct new covered parking structures in accordance with the drawings and specifications dated 2 July 2024.

Include 24 bollards (two each per column on entrance sides of each structure) in base project price.

Exact location of bollards to be determined after award.

BASE PROJECT FOR LTUY202005

CONSTRUCT VEHICLE

OPERATIONS COVERED

PARKING

Non-personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to construct new covered parking structures in accordance with the attached drawings and specifications. Include 24 bollards (two each per column on entrance sides of each structure) in base project price. Exact location of bollards to be determined after award.

List of Contract Documents, Exhibits, or Attachments

W50S8K26QA0020002

The attachments table has changed from:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 A3 Covered Parking Drawings 20240702

Drawings 02 Jul 2024 Attach ment

No

0002 A3 Covered Parking Specifications 20240702

Specification 02 Jul 2024 Attach ment

No

0003 A3 Revision 1 20240827

Supporting Technical Documentation

27 Aug

Attach ment

No

0004 A3 Revision 1 A600 -

BUILDING

SECTIONS -

R1_SS

Drawings 27 Aug

Attach ment

No

0005 B4 WD_MO202

60089_Mod 0_20260102

Wage Determination 18 May

Attach ment

No

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 A3 Covered Parking Drawings 20240702

Drawings 02 Jul 2024 Attach ment

No

0002 A3 Covered Parking Specifications 20240702

Specification 02 Jul 2024 Attach ment

No

0003 A3 Revision 1 20240827

Supporting Technical Documentation

27 Aug

Attach ment

No

0004 A3 Revision 1 A600 -

BUILDING

Drawings 27 Aug

Attach ment

No

SECTIONS -

R1_SS

0005 B4 WD_MO202

60089_Mod 0_20260102

Wage Determination 18 May

Attach ment

No

0006 A3 Amendment 2_A000 -

COVER

SHEET -

R2_20260724

Drawings 24 Jul 2026 Attach ment

No

0007 A3 Amendment 2_A120 -

ENLARGED A

RCHITECTUR

AL SITE PLAN

- R2_20260724

Drawings 24 Jul 2026 Attach ment

No

0008 A3 Amendment 2_E001-E101- E201_2026072

Drawings 24 Jul 2026 Attach ment

No

0009 A3 Amendment 2_Spec 09 90 00_20260724

Specification 24 Jul 2026 Attach ment

No

The following contract documents were added:

A3 Amendment 2_A000 - COVER SHEET - R2_20260724 A3 Amendment 2_A120 - ENLARGED ARCHITECTURAL SITE PLAN - R2_20260724 A3 Amendment 2_E001-E101-E201_20260724 A3 Amendment 2_Spec 09 90 00_20260724

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

A3 Amendment 2_A000 - COVER SHEET - R2_20260724 none

IDCode: J
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 31 JUL 2026
ReqNo:
ProjNo:
IssCode: W50S8K
AdmCode:
IssuedBy: W7NJ USPFO ACTIVITY MOANG 131

KO FOR MOANG DO NOT DELETE, 29 SHERMAN AVENUE

SAINT LOUIS, MO 63125-4117

UNITED STATES

JOSEPH BERNIER, EMAIL: JOSEPH.BERNIER.1@US.AF.MIL TELEPHONE: (314) 527-8033

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W50S8K26QA002
SolDate: 16 JUN 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to extend the due date to 11 August 2026 at 10:00 AM local time and add the following Revision 2 Addendum dated 24 July 2026 drawing & specification documents:

A. A000 Cover Sheet B. A120 Enlarged Architectural Site Plan C. E001, E101, and E201 Electrical Sheets D. Specification 09 90 00 Paints and Coatings

ContNameTitle:
CoNameTitle: JOSEPH BERNIER
ContDate:
CODate: 31 JUL 2026

File details come from the government source that posted it. Updated .