B6 RFI 10_VM Utilities.pdf

PDF 191 KB Posted

Attached to
LTUY202005 Construct Vehicle Operations Covered Parking
Solicitation number
W50S8K26QA002
Issued by

About this file

This is a site utility map illustrating the infrastructure in the vicinity of Building 41 and proposed covered parking structures. The map identifies critical utility locations including an 8-inch water line positioned approximately 32 to 34 feet from Building 41, and a 60-inch reinforced concrete pipe (RCP) storm sewer system. Additional utilities depicted include natural gas lines, communication systems (131 CF COMM and AT&T fiber), water valves and meters, hydrants, utility poles, exterior lighting, and various access points such as manholes, inlets, and comm pullboxes. The color-coded legend identifies overhead electrical lines in red, storm sewers in green, water infrastructure in blue, and natural gas lines in yellow. The map designates Building 50 and marks the building footprint in yellow. This utility documentation appears designed to support site planning and construction coordination for the proposed covered parking structures by clearly delineating existing infrastructure that must be avoided or considered during project development.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8” Water line approx.

32’ – 34’ from bldg 41

60” RCP Storm Sewer

UTILITIES IN VICINITY OF

BLDG 41 AND

PROPOSED COVERED

PARKING STRUCTURES