Install boat dock covers at willow beach marina 3
Closed Solicitation Posted
- Solicitation number
- 140P8125B0005
- Agency
- Pacific West Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
-
- Bradley Metler bradley_metler@nps.gov (360) 854-7219
Notice details come from SAM.gov. Updated .
About this opportunity
The National Park Service Pacific West Region is seeking a contractor to install dock slip covers for 26 boat slips at the Willow Beach Marina within Lake Mead National Recreation Area. The project requires purchasing and installing a comprehensive dock cover system with specific technical requirements, including a steel structural support system designed to withstand 10 pounds per square foot snow load and 115 miles per hour wind load. Contractors must provide all materials, equipment, and labor while adhering to strict environmental compliance protocols, such as desert tortoise awareness and equipment cleaning to prevent invasive species spread. The solicitation is a full and open competitive procurement with a mandatory site visit scheduled for May 7, 2025, and electronic bid submissions due by June 15, 2025, at 1:00 PM Pacific Time. Bidders must submit their entire bid package electronically as a single PDF and include a bid bond with their proposal.
The contract is classified under NAICS code 237990 for Commercial Construction with an estimated value between $250,000 and $500,000. The project will be located at 25804 N Willow Beach, Willow Beach, Arizona, and has a performance period from July 1, 2025, to October 1, 2025, with a 90-calendar day on-site construction timeline. No specific set-aside designations are in place, meaning the opportunity is open to all qualified contractors. The dock cover will be 82 feet wide by 244 feet long, with a 16-foot eve clearance, using 26-gauge MBCI Signature 200 Saddle Tan color roof decking over galvalume. Davis-Bacon wage rates will apply, with minimum wages established for various construction trades, and contractors must comply with federal wage requirements and subcontracting limitations.
Notice text
4 versions
Update #4 · Latest ·
Amendment 00003: Posted attachments are 1) B09_Q&A 5-29-25, 2) "B09_ATTACHMENT F DOCK #3 AS BUILTS", 3) "B09_ATTACHMENT A SOW Amended 5-29-25".
The closing date of this solicitation has been extended to 6-15-25 1300 Pacific Time. Bid opening will be held 24 hours after bid
closing. Public bid opening will be via Microsoft Teams meeting (Meeting ID: 287 001 203 089 9, Passcode: wW3MV3Rq). A call-in line is also available (+1 202-640-1187, passcode 240 528 320#. Should this information change, the updated meeting will be posted in an amendment.
---------------
Update #3 ·
Amendment 00002: Posted attachments are 1) B09_Q&A 5-29-25, 2) "B09_ATTACHMENT F DOCK #3 AS BUILTS", 3) "B09_ATTACHMENT A SOW Amended 5-29-25".
The closing date of this solicitation has been extended to 6-15-25 1300 Pacific Time. Bid opening will be held 24 hours after bid
closing. Public bid opening will be via Microsoft Teams meeting (Meeting ID: 287 001 203 089 9, Passcode: wW3MV3Rq). A call-in line is also available (+1 202-640-1187, passcode 240 528 320#. Should this information change, the updated meeting will be posted in an amendment.
---------------
Update #2 ·
Amendment 00001: Answers bidder questions and posts the site visit sign in sheet. No extension to closing date.
Update #1 ·
The Project location is the Lake Mead National Recreation Area. The site is located at the Willow Beach developed area marina. The Willow Beach Marina provides space to dock public user boats. The marina dock extension was installed in 2011. The adjacent dock slipcover was installed in 2020. Marina dock users will benefit from the covered slips from the harsh desert environmental conditions.
This project will install dock slip covers for the twenty-six slips on Dock 3.
Attachments
| File | Type | Posted |
|---|---|---|
| B09_ATTACHMENT_A_SOW_Amended_5-29-25_0003.pdf | ||
| B09_ATTACHMENT_F_DOCK__3_AS_BUILTS_0003.pdf | ||
| Sol_140P8125B0005_Amd_0003.pdf | ||
| B09_Q_A_5-29-25_0003.pdf | ||
| Sol_140P8125B0005_Amd_0002.pdf | ||
| Sol_140P8125B0005_Amd_0001.pdf | ||
| B08_ATTACHMENT_D_Site_Visit.pdf | ||
| B08_ATTACHMENT_A_SOW.pdf | ||
| B08_ATTACHMENT_C_Construction_Contract_Administration.pdf | ||
| Sol_140P8125B0005.pdf | ||
| B08_ATTACHMENT_B_DB_WD.pdf | ||
| B08_ATTACHMENT_E_Limitation_on_Subcontracting.xlsx | XLSX spreadsheet |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Install boat dock covers at willow beach marina 3 | Solicitation | |
| INSTALL BOAT DOCK COVERS AT WILLOW BEACH MARINA - Lake Mead National Recreation | Pre-Solicitation | |
| INSTALL BOAT DOCK COVERS AT WILLOW BEACH MARINA 3 - Lake Mead National Recreati | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity