Sol_140P8125B0005_Amd_0001.pdf

PDF 152 KB Posted

Attached to
INSTALL BOAT DOCK COVERS AT WILLOW BEACH MARINA 3 Federal contract opportunity
Solicitation number
140P8125B0005
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for solicitation 140P8125B0005, issued by the National Park Service (NPS) for the Willow Beach Marina Dock Cover project. Amendment 00001 includes questions and answers from a site visit and the associated site visit sign-in sheet. The amendment provides clarification on two key points: (1) private vessels will be moved to another dock before construction begins, and (2) dock repairs due to a recent storm will be completed by the Concessioner before the contractor is required to mobilize.

The contract covers installing dock slip covers for 26 slips on Dock 3 at the Willow Beach Marina in Lake Mead National Recreation Area. The period of performance is from 07/01/2025 to 10/01/2025. The site visit occurred on May 7, 2025, at 9:00 AM local time, with representatives from Desert Bakers present. Contractors are advised to coordinate with the NPS and provide a 3-day notification for any marina dock shutdowns, as specified in the scope of work.

View the file

Other files for this federal contract opportunity

Other files attached to INSTALL BOAT DOCK COVERS AT WILLOW BEACH MARINA 3, newest first.
File Type Posted
Sol_140P8125B0005_Amd_0003.pdf PDF
B09_Q_A_5-29-25_0003.pdf PDF
B09_ATTACHMENT_F_DOCK__3_AS_BUILTS_0003.pdf PDF
B09_ATTACHMENT_A_SOW_Amended_5-29-25_0003.pdf PDF
Sol_140P8125B0005_Amd_0002.pdf PDF
B08_ATTACHMENT_D_Site_Visit.pdf PDF
Sol_140P8125B0005.pdf PDF
B08_ATTACHMENT_B_DB_WD.pdf PDF
B08_ATTACHMENT_E_Limitation_on_Subcontracting.xlsx XLSX spreadsheet
B08_ATTACHMENT_A_SOW.pdf PDF
B08_ATTACHMENT_C_Construction_Contract_Administration.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8125B0005 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAKE MABO

05/03/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/03/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMENDMENT 00001 - Questions & Answers from site visit, along with site visit sign in sheet, posted.

Period of Performance: 07/01/2025 to 10/01/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Caroline Bachelier

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P8125B0005 Site Visit Q&A 5-7-25

Question: Do contractors need to work around private vessels in slips?

Answer: No. Private vessels will be moved to another dock before on site construction begins. See scope of work, page 5:

Question: Will dock repairs due to the current storm be complete before contractor is required to mobilize?

Answer: Yes. The Concessioner will have repairs to the dock complete.

File details come from the government source that posted it. Updated .