B09_ATTACHMENT_F_DOCK__3_AS_BUILTS_0003.pdf
PDF 868 KB Posted
- Attached to
- INSTALL BOAT DOCK COVERS AT WILLOW BEACH MARINA 3 Federal contract opportunity
- Solicitation number
- 140P8125B0005
About this file
These are architectural and engineering design documents for the Willow Beach Marina dock project located at Lake Mohave, Arizona. The plans, prepared by MDI Marine Development, Inc. from Eufaula, Oklahoma, include detailed site plans, dock layout schematics, shore end elevation, dock side elevation, and float attachment specifications. The drawings are dated 8/21/20 and show a comprehensive design for Dock 3, featuring precise measurements, structural details, and engineering specifications for the marina infrastructure, including dock finger ends, horizontal braces, column reinforcing, and float attachment mechanisms. The site plan reveals the marina's layout, parking areas, and geographical context, situated against a rocky landscape near a water body.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8125B0005_Amd_0003.pdf | ||
| B09_Q_A_5-29-25_0003.pdf | ||
| B09_ATTACHMENT_A_SOW_Amended_5-29-25_0003.pdf | ||
| Sol_140P8125B0005_Amd_0002.pdf | ||
| Sol_140P8125B0005_Amd_0001.pdf | ||
| B08_ATTACHMENT_D_Site_Visit.pdf | ||
| Sol_140P8125B0005.pdf | ||
| B08_ATTACHMENT_B_DB_WD.pdf | ||
| B08_ATTACHMENT_E_Limitation_on_Subcontracting.xlsx | XLSX spreadsheet | |
| B08_ATTACHMENT_A_SOW.pdf | ||
| B08_ATTACHMENT_C_Construction_Contract_Administration.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .