Hawks Rest Bridge Replacement Project on the Bridger-Teton National Forest
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1202NV20R0002
- Agency
-
Region 4 - Intermountain Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- WY 83013 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks installation services for a bridge replacement project located on the Bridger-Teton National Forest. The Forest Service is procuring transportation and installation of a prefabricated 170 foot steel truss trail bridge and two precast concrete grade beams, which have already been procured. The contractor must install the bridge and grade beams per the contract documents, and remove the existing bridge structure. All work must comply with Wilderness Act regulations as the bridge is located entirely within designated wilderness. Questions are due by June 9, 2020, with proposals due by June 17, 2020. Evaluation will be based on technical qualifications and price.
The opportunity is set aside for total small business. The primary NAICS code is 237990, and the PSC code covers bridge construction. The incumbent contractor is unspecified. The project value is estimated between $500,000 to $1,000,000. The bridge and grade beams must be installed by August 15, 2021 in Moran, Wyoming.
Notice text
5 versions
Update #5 · Latest ·
*** AMENDMENT 04 ***
EFFECTIVE 6/9/2020
AMENDMENT 04 RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION. THE DUE DATE AND TIME FOR RECEIPT OF PROPOSALS IS NOT EXTENDED.
EMAIL PROPOSALS TO KELLIE SHAW AT KELLIE.SHAW@USDA.GOV.
*** AMENDMENT 03 ***
EFFECTIVE 6/8/2020
AMENDMENT 03 PROVIDES ADDITIONAL ATTACHMENTS AND INFORMATION REFERENCED IN AMENDMENT 02
*** AMENDMENT 02 ***
EFFECTIVE 6/4/2020
AMENDMENT 02 RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION AND QUESITONS THAT WERE ADDRESSED DURING THE PRE-PROPOSAL MEETING HELD ON JUNE 2, 2020.
**AMENDMENT 01 ***
EFFECTIVE 5/21/2020
AMENDMENT 01 ADDRESSES CHANGES TO BONDING REQUIREMENTS AND RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION. AMENDMENT PROVIDES DETAILS REGARDING PRE-PROPOSAL MEETING SCHEDULED FOR JUNE 2, 2020.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
This project consists of delivering and installing a 170 foot span prefabricated steel truss trail bridge and 2 precast concrete grade beams. The bridge and grade beams have already been procured and are located at the Blackrock Ranger Station, 8 miles East of Moran Junction on Highway 26/287. The contract does not include the purchase of the bridge or grade beams.
All work shall be in compliance with the contract documents. Work includes, but is not limited to, transportation and installation of a new pedestrian/stock bridge and grade beams as per the attached plans, and the removal of the existing bridge structure and components.
This bridge is located completely within the designated Wilderness. All Wilderness Act regulations and requirements will apply unless otherwise noted in the contract documents. The COR and the Contracting Officer (CO) will identify a staging/laydown/assembly area at the construction site.
Update #4 ·
*** AMENDMENT 03 ***
EFFECTIVE 6/8/2020
AMENDMENT 03 PROVIDES ADDITIONAL ATTACHMENTS AND INFORMATION REFERENCED IN AMENDMENT 02
*** AMENDMENT 02 ***
EFFECTIVE 6/4/2020
AMENDMENT 02 RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION AND QUESITONS THAT WERE ADDRESSED DURING THE PRE-PROPOSAL MEETING HELD ON JUNE 2, 2020.
**AMENDMENT 01 ***
EFFECTIVE 5/21/2020
AMENDMENT 01 ADDRESSES CHANGES TO BONDING REQUIREMENTS AND RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION. AMENDMENT PROVIDES DETAILS REGARDING PRE-PROPOSAL MEETING SCHEDULED FOR JUNE 2, 2020.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
This project consists of delivering and installing a 170 foot span prefabricated steel truss trail bridge and 2 precast concrete grade beams. The bridge and grade beams have already been procured and are located at the Blackrock Ranger Station, 8 miles East of Moran Junction on Highway 26/287. The contract does not include the purchase of the bridge or grade beams.
All work shall be in compliance with the contract documents. Work includes, but is not limited to, transportation and installation of a new pedestrian/stock bridge and grade beams as per the attached plans, and the removal of the existing bridge structure and components.
This bridge is located completely within the designated Wilderness. All Wilderness Act regulations and requirements will apply unless otherwise noted in the contract documents. The COR and the Contracting Officer (CO) will identify a staging/laydown/assembly area at the construction site.
Update #3 ·
*** AMENDMENT 02 ***
EFFECTIVE 6/4/2020
AMENDMENT 02 RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION AND QUESITONS THAT WERE ADDRESSED DURING THE PRE-PROPOSAL MEETING HELD ON JUNE 2, 2020.
**AMENDMENT 01 ***
EFFECTIVE 5/21/2020
AMENDMENT 01 ADDRESSES CHANGES TO BONDING REQUIREMENTS AND RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION. AMENDMENT PROVIDES DETAILS REGARDING PRE-PROPOSAL MEETING SCHEDULED FOR JUNE 2, 2020.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
This project consists of delivering and installing a 170 foot span prefabricated steel truss trail bridge and 2 precast concrete grade beams. The bridge and grade beams have already been procured and are located at the Blackrock Ranger Station, 8 miles East of Moran Junction on Highway 26/287. The contract does not include the purchase of the bridge or grade beams.
All work shall be in compliance with the contract documents. Work includes, but is not limited to, transportation and installation of a new pedestrian/stock bridge and grade beams as per the attached plans, and the removal of the existing bridge structure and components.
This bridge is located completely within the designated Wilderness. All Wilderness Act regulations and requirements will apply unless otherwise noted in the contract documents. The COR and the Contracting Officer (CO) will identify a staging/laydown/assembly area at the construction site.
Update #2 ·
**AMENDMENT 01 ***
EFFECTIVE 5/21/2020
AMENDMENT 01 ADDRESSES CHANGES TO BONDING REQUIREMENTS AND RESPONDS TO QUESTIONS THAT HAVE BEEN RECEIVED IN RESPONSE TO THE SOLICITATION. AMENDMENT PROVIDES DETAILS REGARDING PRE-PROPOSAL MEETING SCHEDULED FOR JUNE 2, 2020.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
This project consists of delivering and installing a 170 foot span prefabricated steel truss trail bridge and 2 precast concrete grade beams. The bridge and grade beams have already been procured and are located at the Blackrock Ranger Station, 8 miles East of Moran Junction on Highway 26/287. The contract does not include the purchase of the bridge or grade beams.
All work shall be in compliance with the contract documents. Work includes, but is not limited to, transportation and installation of a new pedestrian/stock bridge and grade beams as per the attached plans, and the removal of the existing bridge structure and components.
This bridge is located completely within the designated Wilderness. All Wilderness Act regulations and requirements will apply unless otherwise noted in the contract documents. The COR and the Contracting Officer (CO) will identify a staging/laydown/assembly area at the construction site.
Update #1 ·
This project consists of delivering and installing a 170 foot span prefabricated steel truss trail bridge and 2 precast concrete grade beams. The bridge and grade beams have already been procured and are located at the Blackrock Ranger Station, 8 miles East of Moran Junction on Highway 26/287. The contract does not include the purchase of the bridge or grade beams.
All work shall be in compliance with the contract documents. Work includes, but is not limited to, transportation and installation of a new pedestrian/stock bridge and grade beams as per the attached plans, and the removal of the existing bridge structure and components.
This bridge is located completely within the designated Wilderness. All Wilderness Act regulations and requirements will apply unless otherwise noted in the contract documents. The COR and the Contracting Officer (CO) will identify a staging/laydown/assembly area at the construction site.
Files
Show all 22
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hawks Rest Bridge Replacement Project on the Bridger-Teton National Forest | Award Notice | |
| This notice | Solicitation | |
| Hawks Rest Bridge Replacement Project on the Bridger-Teton National Forest | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside | |
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside | |
| 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity