4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Open Solicitation Posted

Solicitation number
1240LT26Q0109
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Mc Kinnon, Wyoming 82935, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service seeks construction improvements to the Buckboard Marina Water System in Ashley National Forest, Wyoming, with quotes due November 17, 2026. This is a 100% small business set-aside (NAICS 237110, size standard $45 million) under a General Authorities Act (GAOA) funded project.

Place of performance is McKinnon, Wyoming. The project encompasses design-build water infrastructure reconstruction including raw water intake system upgrades, cofferdam construction with mandatory sheet-pile design to withstand up to 20 feet of water depth, submersible pump and intake pumphouse installation, raw water pipeline to treatment plant, raw water storage tank, irrigation booster pump and pipeline, overhead power supply, SCADA system with remote operability via laptop/desktop/smartphone and alarm notifications via text/email/cellular, electrical systems coordinated with Rocky Mountain Power, communications infrastructure coordinated with Union Wireless utilizing point-to-point wireless communication, and comprehensive native-surface and asphalt roadway improvements. Base contract duration is 120 calendar days from November 2026 start; contractor must commence work within 10 calendar days of notice to proceed and complete all work within 240 calendar days including final cleanup. Optional work packages include underground storage tanks (30 days), looped water distribution system with fire hydrants (30 days), water meter installation, treatment plant upgrade to 40 GPM capacity (30 days), and waterline extension for future dock location (15 days). Contract magnitude is estimated between $1,000,000 and $5,000,000. Firm Fixed Price award is anticipated. Evaluation follows lowest price technically acceptable criteria, weighing technical approach (capability, work sequencing, subcontractors, resources), past performance (three similar projects completed within three years), and price. Performance and payment bonds and 20% bid guarantee required. Davis-Bacon prevailing wages apply per determination WY20260044 (July 30, 2026). Insurance requirements: workers compensation with $100,000 employer's liability minimum, general liability $500,000 per occurrence, property damage $1,000,000 per occurrence, automobile liability $200,000 per person/$500,000 per occurrence. Three amendments extended the deadline and posted revised SOW, specifications, measurement/payment criteria, schedule of items, RFI Q&A, and options supplement. Requests for Information due October 1, 2026.

Notice text

4 versions

Update #4 · Latest ·

On October 21, 2026, amendment 0003 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following:

1. Extends the due date for quotes from 11/04/2026 to 11/17/2026.
2. Post RFI Q&A labeled "C04a RFI QA 1240LT26Q0109 102026."
3. Post revised SOW labeled "C04b New SOW 1240LT26Q0109 102026."
4. Post revised Specs labeled "C04c New Specs 1240LT26Q0109 102026."
5. Post measurement and payment supplement labeled "C04d Measurement PYMT Sup 1240LT26Q0109 102026."
6. Post measurement and payment specs labeled "C04e Measurement PYMT Spec 1240LT26Q0109 102026."
7. Post revised SOI labeled "C04f New SOI 1240LT26Q0109 102026."

8. Post options supplement labeled "C04g Options Supplement 1240LT26Q0109 102026."

This amendment must be acknowledged and submitted with your quote.

*********************************************************************************************************************************

On October 16, 2026, amendment 0002 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following:

1. Extends the due date for quotes from 10/27/2026 to 11/04/2026.
2. Post the site visit attendance sheet labeled "C05a Site Visit 1240LT26Q0109."

This amendment must be acknowledged and submitted with your quote.

**********************************************************************************************************************

On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following:

1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.This amendment must be acknowledged and submitted with your quote.

*************************************************************************************************************************

Buckboard Marina Water System Improvements

Update #3 ·

On October 16, 2026, amendment 0002 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following:

1. Extends the due date for quotes from 10/27/2026 to 11/04/2026.
2. Post the site visit attendance sheet labeled "C05a Site Visit 1240LT26Q0109."

This amendment must be acknowledged and submitted with your quote.

**********************************************************************************************************************

On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following:

1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.

This amendment must be acknowledged and submitted with your quote.

*************************************************************************************************************************

Buckboard Marina Water System Improvements

Update #2 ·

On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following:

1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.

This amendment must be acknowledged and submitted with your quote.

*************************************************************************************************************************

Buckboard Marina Water System Improvements

Update #1 ·

Buckboard Marina Water System Improvements

Files

Show all 18

Similar open opportunities

Opportunity Agency Set-aside Responses due
Ross Springs Waterline Replacement Utah 84078, United States · NAICS 237110 Forest Service Total Small Business
Nelson Drive Fuel Tank Removal Jackson, Wyoming, United States · NAICS 237120 Forest Service Total Small Business
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest Garden City, Utah, United States · NAICS 237990 Forest Service Total Small Business
GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest Kamiah, Idaho, United States · NAICS 236118 Forest Service Total Small Business
Gaoa rawlins barracks replacement, WY 906 West Davis Street Rawlins, Wyoming, United States · NAICS 236220 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors