Gray Eagle D/82 Fiber Optics Solicitation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- PANMCC24P0000017356
- Agency
-
Mission and Installation Contracting Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- DE01 IT and Telecom - End User: Help Desk; Tier 1-2, Workspace, Print, Output, Productivity Tools (Labor)
- Place of performance
- Hoffman, North Carolina 28347, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command is seeking competitive quotes for the installation and repair of fiber optic cables at the Gray Eagle D/82 site in Hoffman, North Carolina. The requirement involves removing and disposing of failed fiber cables, replacing them with new outdoor-rated fiber cables, splicing connections, and terminating with TFOCA connectors. The contractor must provide test documentation to validate the new fiber supports the full rated bandwidth, and complete the work within 45 days of contract award. Quotes will be evaluated using a Lowest Priced Technically Acceptable (LPTA) approach, considering the offeror's technical capabilities and past performance.
This is a total small business set-aside under NAICS code 238210, with a $19 million small business size standard. The government has not provided any information about incumbent contractors or award values in the documentation. The solicitation indicates the requirement involves approximately 5,600 feet of new fiber optic cable installation, with 48 strands total. Questions are due by September 17, 2024 and quotes are due by September 20, 2024.
Notice text
3 versions
Update #3 · Latest ·
***Amended Solicitation FAR 52.212-2(a) Evaluation-Commercial Products and Commercial Services. Please see amended solicitation for details. Extended submission date to no later than 1700 Eastern Standard Time, 23 September 2024. *****
***Questions and Answers have been published please read below and see attached for submissions. ******
This is the Combined Synopsis/Solicitation notice from the presoliciation site survey for Gray Eagle D/82 Fiber Optics published 08AUG24.
Attached documents include Combined Synopsis/Solicitation, PWS, Fiber Cable Layout with distances, picture of manholes and junction boxes, and questions with answers from presolicitation site survery.
There will not be another site survery for this requirement.
All questions and quotes must be submitted via email to the POCs listed below.
Questions for this notice are due no later than 1600 Eastern Standard Time, 17 September 2024.
Answers will be published 1300 Eastern Standard Time, 18 September 2024.
Quotes for this notice are due no later than 1700 Eastern Standard Time, 20 September 2024.
Update #2 ·
***Questions and Answers have been published please read below and see attached for submissions. ******
This is the Combined Synopsis/Solicitation notice from the presoliciation site survey for Gray Eagle D/82 Fiber Optics published 08AUG24.
Attached documents include Combined Synopsis/Solicitation, PWS, Fiber Cable Layout with distances, picture of manholes and junction boxes, and questions with answers from presolicitation site survery.
There will not be another site survery for this requirement.
All questions and quotes must be submitted via email to the POCs listed below.
Questions for this notice are due no later than 1600 Eastern Standard Time, 17 September 2024.
Answers will be published 1300 Eastern Standard Time, 18 September 2024.
Quotes for this notice are due no later than 1700 Eastern Standard Time, 20 September 2024.
Update #1 ·
This is the Combined Synopsis/Solicitation notice from the presoliciation site survey for Gray Eagle D/82 Fiber Optics published 08AUG24.
Attached documents include Combined Synopsis/Solicitation, PWS, Fiber Cable Layout with distances, picture of manholes and junction boxes, and questions with answers from presolicitation site survery.
There will not be another site survery for this requirement.
All questions and quotes must be submitted via email to the POCs listed below.
Questions for this notice are due no later than 1600 Eastern Standard Time, 17 September 2024.
Answers will be published 1300 Eastern Standard Time, 18 September 2024.
Quotes for this notice are due no later than 1700 Eastern Standard Time, 20 September 2024.
Files
| File | Type | Posted |
|---|---|---|
| Amended Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Solicitation Questions and Answers.docx | DOCX document | |
| Mackall Fiber Asbuilt Final.pdf | ||
| MH2.jpg | JPG image | |
| HH7.jpg | JPG image | |
| PWS Fiber Optic Final.docx | DOCX document | |
| Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Presolicit Site Survey Questions Answered.docx | DOCX document | |
| GCS 4.jpg | JPG image | |
| GCS 2.jpg | JPG image | |
| HH6.jpg | JPG image | |
| HH1.jpg | JPG image | |
| GCS 3.jpg | JPG image | |
| GCS-1.jpg | JPG image | |
| GDT-1.jpg | JPG image | |
| SGDT.jpg | JPG image | |
| Mackall Fiber Asbuilt.pdf |
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| Gray Eagle D/82 Fiber Optics Solicitation | Award Notice | |
| This notice | Solicitation | |
| Gray Eagle D/82 Fiber Optics | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 56 CS FOC to Flightline and Wx Equipment, Luke AFB | Air Education and Training Command | Woman-Owned Small Business | |
| Cable, fiber optic | Naval Supply Systems Command | No set-aside | |
| Cable, fiber optic | Naval Supply Systems Command | No set-aside | |
| Cable assembly, fibe | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity