GCS-1.jpg
JPG image 389 KB Posted
- Attached to
- Gray Eagle D/82 Fiber Optics Solicitation
- Solicitation number
- PANMCC24P0000017356
About this file
This document is a Combined Synopsis/Solicitation notice for the Gray Eagle D/82 Fiber Optics requirement. The solicitation is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command. The attached documents include the Combined Synopsis/Solicitation, Performance Work Statement, Fiber Cable Layout with distances, pictures of manholes and junction boxes, and Q&A from the pre-solicitation site survey. There will not be another site survey for this requirement. All questions are due by 1600 EST on 17 September 2024, with answers to be published on 18 September 2024. Quotes are due by 1700 EST on 20 September 2024. This solicitation does not contain any set-aside requirements or information about incumbent contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Mackall Fiber Asbuilt Final.pdf | ||
| Solicitation Questions and Answers.docx | DOCX document | |
| GDT-1.jpg | JPG image | |
| SGDT.jpg | JPG image | |
| Mackall Fiber Asbuilt.pdf | ||
| Presolicit Site Survey Questions Answered.docx | DOCX document | |
| GCS 4.jpg | JPG image | |
| GCS 2.jpg | JPG image | |
| HH6.jpg | JPG image | |
| HH1.jpg | JPG image | |
| MH2.jpg | JPG image | |
| HH7.jpg | JPG image | |
| PWS Fiber Optic Final.docx | DOCX document | |
| Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| GCS 3.jpg | JPG image |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .