Solicitation Questions and Answers.docx
DOCX document 18 KB Posted
- Attached to
- Gray Eagle D/82 Fiber Optics Solicitation
- Solicitation number
- PANMCC24P0000017356
About this file
This document is a set of Questions and Answers (Q&A) related to a federal contract opportunity for Gray Eagle D/82 Fiber Optics. The Q&A provides clarification on the specific locations and quantities of TFOCA connectors required, the scope of work being limited to the run between two manholes (HH-2 and HH-7), and confirmation that certain cabling/fiber runs are out of scope. It also addresses questions about the fiber cable specifications, including the type of connectors and the length of the fiber runs. The related federal contract opportunity is a solicitation (PANMCC24P0000017356) issued by the Department of the Army Materiel Command Mission and Installation Contracting Command, with a description indicating this is a combined synopsis/solicitation for a fiber optics requirement. Key details include response due dates for questions (17 September 2024) and quotes (20 September 2024), as well as the publication date for answers (18 September 2024).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Mackall Fiber Asbuilt Final.pdf | ||
| Mackall Fiber Asbuilt.pdf | ||
| MH2.jpg | JPG image | |
| HH1.jpg | JPG image | |
| Presolicit Site Survey Questions Answered.docx | DOCX document | |
| HH6.jpg | JPG image | |
| PWS Fiber Optic Final.docx | DOCX document | |
| Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| GCS 4.jpg | JPG image | |
| GCS 2.jpg | JPG image | |
| HH7.jpg | JPG image | |
| GCS 3.jpg | JPG image | |
| GCS-1.jpg | JPG image | |
| GDT-1.jpg | JPG image | |
| SGDT.jpg | JPG image |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The response to Pre-solicitation RFI # 15 states that TFOCA connectors are being used at end points.
a. Please further define which end points require the TFOCA connectors?
· The TFOCA connectors are going to end points on the following locations below. Each location may need more than 1 TFOCA connector.
· GCS-1 TFOCA connectors x 2
· GCS-2 TFOCA connectors x 2
· GCS-3 TFOCA connector x 1
· GCS-4 TFOCA connector x 1
· GDT-1 TFOCA connector x 1
· GDT-2 TFOCA connector x 1
· GDT-3 TFOCA connector x 1
· GDT-4 TFOCA connector x 1
· SGDT – TFCOA connectors x 2
2. Please clarify the scope of work is limited to the run between HH-2 and HH-7
· The asbuilt has been highlighted to reflect where the scope of work is.
3. Please confirm that the cabling/fiber between HH-2 and GCS-1 through GCS-4 as well as between HH-7 and GDT-1 through GDT-4 as well as SGDT is out of scope.
· The asbuilt has been highlighted to reflect where the scope of work is.
4. Similarly, cabling/fiber between HH-1 and GBSAA room is out of scope.
· The asbuilt has been highlighted to reflect where the scope of work is.
5. Similarly, we understand cabling/fiber between Pump House and Tier 112 is out of scope.
· The asbuilt has been highlighted to reflect where the scope of work is.
6. Please explain the meaning / implications for this scope of the red single mode and multi mode notes in the As Built that read 12SM-3200’, 12MM-3200’, 6SM-2200’, 6MM-2200’
· It has been removed please disregard
7. Is it OM1, OM2, or OM3?
· Not specified in scope of work
8. What is the model number in the damaged fiber optic cable?
· Unknown at this time
9. Is the fiber 2 continues runs from point A to point B or are they split and run to different locations. The connectors call for Tactical Fiber Optic Cable Assembly (TFOCA) connectors (approximately 12). (e) and only 12 however the scope call for two 12 strand, what type of connector is on the other 36 strands
· The asbuilt has been updated to reflect the scope of work of two runs that have splitters at the end (HH-2 & HH-7). Regarding the strands question, the TFOCA connectors have been assigned to their boxes above.
File details come from the government source that posted it. Updated .