GCS 2.jpg
JPG image 150 KB Posted
- Attached to
- Gray Eagle D/82 Fiber Optics Solicitation
- Solicitation number
- PANMCC24P0000017356
About this file
This document is a Combined Synopsis/Solicitation notice for the Gray Eagle D/82 Fiber Optics requirement. The solicitation is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command. The solicitation includes a Performance Work Statement, Fiber Cable Layout with distances, pictures of manholes and junction boxes, and questions with answers from a presolicitation site survey. There will not be another site survey. All questions and quotes must be submitted via email to the Points of Contact by the due dates provided: questions by 1600 EST on 17 September 2024, and quotes by 1700 EST on 20 September 2024. Answers to questions will be published on 18 September 2024 at 1300 EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Solicitation Questions and Answers.docx | DOCX document | |
| Mackall Fiber Asbuilt Final.pdf | ||
| Presolicit Site Survey Questions Answered.docx | DOCX document | |
| GCS 4.jpg | JPG image | |
| HH6.jpg | JPG image | |
| HH1.jpg | JPG image | |
| GCS 3.jpg | JPG image | |
| GCS-1.jpg | JPG image | |
| MH2.jpg | JPG image | |
| HH7.jpg | JPG image | |
| PWS Fiber Optic Final.docx | DOCX document | |
| Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| GDT-1.jpg | JPG image | |
| SGDT.jpg | JPG image | |
| Mackall Fiber Asbuilt.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .