GCS 3.jpg
JPG image 151 KB Posted
- Attached to
- Gray Eagle D/82 Fiber Optics Solicitation
- Solicitation number
- PANMCC24P0000017356
About this file
This document is a Combined Synopsis/Solicitation notice for the Gray Eagle D/82 Fiber Optics Requirement. The solicitation is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command. The key details are:
The solicitation is for fiber optic cable installation and associated services. Attached documents include the Performance Work Statement, a fiber cable layout with distances, photos of manholes and junction boxes, and questions and answers from a pre-solicitation site survey. There will not be another site survey for this requirement. All questions must be submitted by 17 September 2024, with answers published on 18 September 2024. Quotes are due by 20 September 2024. The agency is seeking competitive quotes for this requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Solicitation Questions and Answers.docx | DOCX document | |
| Mackall Fiber Asbuilt Final.pdf | ||
| Presolicit Site Survey Questions Answered.docx | DOCX document | |
| GCS 4.jpg | JPG image | |
| GCS 2.jpg | JPG image | |
| HH6.jpg | JPG image | |
| HH1.jpg | JPG image | |
| GCS-1.jpg | JPG image | |
| MH2.jpg | JPG image | |
| HH7.jpg | JPG image | |
| PWS Fiber Optic Final.docx | DOCX document | |
| Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| GDT-1.jpg | JPG image | |
| SGDT.jpg | JPG image | |
| Mackall Fiber Asbuilt.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .