HH7.jpg
JPG image 9 MB Posted
- Attached to
- Gray Eagle D/82 Fiber Optics Solicitation
- Solicitation number
- PANMCC24P0000017356
About this file
This document is a Combined Synopsis/Solicitation notice for the Gray Eagle D/82 Fiber Optics requirement. The solicitation is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command. The requirement includes a Performance Work Statement, Fiber Cable Layout with distances, pictures of manholes and junction boxes, and a question and answer document from a pre-solicitation site survey. Responses to the solicitation are due by 1700 Eastern Standard Time on 20 September 2024. All questions must be submitted by 1600 Eastern Standard Time on 17 September 2024, with answers to be published on 18 September 2024. The solicitation does not indicate any set-asides or incumbent contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Mackall Fiber Asbuilt Final.pdf | ||
| Solicitation Questions and Answers.docx | DOCX document | |
| MH2.jpg | JPG image | |
| PWS Fiber Optic Final.docx | DOCX document | |
| Combined Synopsis Fiber Optic Cable.docx | DOCX document | |
| Presolicit Site Survey Questions Answered.docx | DOCX document | |
| GCS 4.jpg | JPG image | |
| GCS 2.jpg | JPG image | |
| HH6.jpg | JPG image | |
| HH1.jpg | JPG image | |
| GDT-1.jpg | JPG image | |
| SGDT.jpg | JPG image | |
| Mackall Fiber Asbuilt.pdf | ||
| GCS 3.jpg | JPG image | |
| GCS-1.jpg | JPG image |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .