HH7.jpg

JPG image 9 MB Posted

Attached to
Gray Eagle D/82 Fiber Optics Solicitation
Solicitation number
PANMCC24P0000017356
Issued by

About this file

This document is a Combined Synopsis/Solicitation notice for the Gray Eagle D/82 Fiber Optics requirement. The solicitation is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command. The requirement includes a Performance Work Statement, Fiber Cable Layout with distances, pictures of manholes and junction boxes, and a question and answer document from a pre-solicitation site survey. Responses to the solicitation are due by 1700 Eastern Standard Time on 20 September 2024. All questions must be submitted by 1600 Eastern Standard Time on 17 September 2024, with answers to be published on 18 September 2024. The solicitation does not indicate any set-asides or incumbent contractors.

View the file

Other files

File Type Posted
Amended Combined Synopsis Fiber Optic Cable.docx DOCX document
Mackall Fiber Asbuilt Final.pdf PDF
Solicitation Questions and Answers.docx DOCX document
MH2.jpg JPG image
PWS Fiber Optic Final.docx DOCX document
Combined Synopsis Fiber Optic Cable.docx DOCX document
Presolicit Site Survey Questions Answered.docx DOCX document
GCS 4.jpg JPG image
GCS 2.jpg JPG image
HH6.jpg JPG image
HH1.jpg JPG image
GDT-1.jpg JPG image
SGDT.jpg JPG image
Mackall Fiber Asbuilt.pdf PDF
GCS 3.jpg JPG image
GCS-1.jpg JPG image
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .