GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement

Closed Solicitation Posted

This opportunity was awarded. See its 2 award notices in the notice history.

Solicitation number
80GSFC23R0010
Agency
Goddard Space Center National Aeronautics and Space Administration
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336414 Guided Missile and Space Vehicle Manufacturing
PSC
1555 Space Vehicles
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center is soliciting proposals for the Geostationary Extended Observations (GeoXO) Spacecraft Implementation. The contract includes the design, development, fabrication, integration, testing, evaluation, and launch support of seven GeoXO spacecraft, along with the provision of Engineering Development Units (EDUs), Ground System Equipment (GSE), and simulators. The contract also covers mission operations support at the NOAA Satellite Operations Facility (NSOF) for a period of 15 years for each Flight Model (FM), with an anticipated contract award date in late May 2024.

Products and Services to be provided:

  1. Design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft.
  2. Provide Engineering Development Units (EDUs).
  3. Supply and maintain the Ground System Equipment (GSE) and simulators.
  4. Support the mission operations at the NOAA Satellite Operations Facility (NSOF).
  5. Support for 10 years of on-orbit operations and 5 years of on-orbit storage for each Flight Model (FM).

Notice text

8 versions

Update #8 · Latest ·

GeoXO Spacecraft DRFP Questions and Answers Set #3 and Clarifications


Question #1-Pertaining to Solicitation Section L.14
Paragraph states relevant past performance is for efforts with a “minimum annual cost/fee incurred of $250,000,000”
Can “annual” be removed as a qualifier? This would make it consistent with Section M.5
Can minimum threshold be reduced to $50,000,000?
Answer #1-
The clause at L.14, GSFC 52.215-230 PAST PERFORMANCE VOLUME (MAR 2020)
was the incorrect clause. This will be corrected in the final RFP. The correct clause does not contain the word “annual”.
The minimum threshold cannot be reduced to $50,000,000 however, the Government will lower the minimum threshold to $150,000,000.
Question #2-Pertaining to Solicitation Section M.5
Paragraph states relevant past performance is for efforts with that will meet/exceed a “total cost/fee of $250,000,000”
Can minimum threshold be reduced to $50,000,000
Answer #2-
See Answer #1
Question #3- Pertaining to Attachment C -SCFPS712
Can the previous Figure SCFPS712 that was in the Phase A documentation remain a valid reference figure to correspond to the definitions provided in SCFPS714 & SCFPS715
Answer #3-
No – utilize the current figure in SCFPS712. The SCFPS is in process of being updated to add a requirement that corresponds to the “Qualification (prototype)” testing shown in the figure. Definitions for protoflight, prototype and qualification are in the Spacecraft Statement of Work (SOW). The GeoI1 and GeoS1 spacecraft are required to be protoflight units.
Question #4-Pertaining to: Attachment C-SCFPS665-Primary and secondary structures fabricated from nonmetallic composites, beryllium, or containing bonded joints or bonded inserts shall be proof tested in accordance with Section 2.4.1.4.1 of GSFC-STD-7000B [20].
Seeking to verify that NASA will allow for the utilization of GEVS GSFC-STD-7000B, section 2.4.1.4.1.d.1 as a path to compliance for metal-metal & metal-nonmetal bonds?
From GEVS 2.4.1.4.1.d.1:
“... As a minimum, at least one of each type of bonded joint in the flight article shall be tested to 1.25 times the maximum predicted limit load for that joint type. The remainder of the bonded joints may then be considered to be qualified by similarity.”
Answer #4-
As stated per GEVs, the preferred approach is proof test each joint. However, in cases where proof testing individual joints is not necessary, provisions in 2.4.1.4.1.d.1 may be followed. Provisions #2 and #3 must also be followed. It is the responsibility of the Contractor to demonstrate to the Government why it is not necessary to test each individual joint.
Clarifications
#1-Clarifying requirement SCFPS161 in Attachment C
This requirement allows for maintaining and monitoring battery health when the spacecraft is in a condition where it cannot be powered (e.g. working an issue with other spacecraft hardware.)
Please note that the Government considers the battery to be discharging even when the spacecraft is powered off.
#2- Clarifying requirement SCMAR42 in Attachment H
EEE parts for components, assemblies and/or subsystems that are accepted by the Government for the Inherited Items Risk Assessment Process do NOT need to go through the EPCB approval process unless a risk for a EEE part has been identified.
The Government reserves the right to accept or reject components, assemblies and/or subsystems for the Inherited Risk Assessment Process based on the extent of the heritage, need date of the risk assessments and government resources available to perform the assessments.
#3-Clarifiying requirement SCFPS282 in Attachment C.
Due to the Class B risk classification, the GeoXO project requires positive indication of mechanism stowed /caged position on orbit as well as during ground testing.GeoXO Spacecraft DRFP Questions and Answers Set #3 and Clarifications
Question #1-Pertaining to Solicitation Section L.14
Paragraph states relevant past performance is for efforts with a “minimum annual cost/fee incurred of $250,000,000”
Can “annual” be removed as a qualifier? This would make it consistent with Section M.5
Can minimum threshold be reduced to $50,000,000?
 

GeoXO Draft RFP Questions and Answers Set #2

A PDF Version of Word has been uploaded to this DRFP Questions and Answer Set #2, provided by industry and subsequest answer(s) provided by the Government.  Please see the attachment section to view.

GeoXO Draft RFP Questions and Answer Set #1

A PDF Version of EXCEL has been uploaded to this DRFP with all questions/comments, provided by industry and subsequent answers/ respnses, provided by the Government.  Please see the attachment secton to obtain the spreadsheet.

CORRECTION

Two of the same GPRs were inadvertently uploaded.  This posting is to fix that erroneous upload.

ADDENDUM 2

GPR 7120.7B and GPR 7120.4D have been uploaded to this DRFP as additional information.

NOTICE 1

It is NASA’s policy to release PDF documents only.  We apologize for the inconvenience, but this is the only format that will be provided.  

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #7 ·

GeoXO Draft RFP Questions and Answers Set #2

A PDF Version of Word has been uploaded to this DRFP Questions and Answer Set #2, provided by industry and subsequest answer(s) provided by the Government.  Please see the attachment section to view.

GeoXO Draft RFP Questions and Answer Set #1

A PDF Version of EXCEL has been uploaded to this DRFP with all questions/comments, provided by industry and subsequent answers/ respnses, provided by the Government.  Please see the attachment secton to obtain the spreadsheet.

CORRECTION

Two of the same GPRs were inadvertently uploaded.  This posting is to fix that erroneous upload.

ADDENDUM 2

GPR 7120.7B and GPR 7120.4D have been uploaded to this DRFP as additional information.

NOTICE 1

It is NASA’s policy to release PDF documents only.  We apologize for the inconvenience, but this is the only format that will be provided.  

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #6 ·

GeoXO Draft RFP Questions and Answer Set #1

A PDF Version of EXCEL has been uploaded to this DRFP with all questions/comments, provided by industry and subsequent answers/ respnses, provided by the Government.  Please see the attachment secton to obtain the spreadsheet.

CORRECTION

Two of the same GPRs were inadvertently uploaded.  This posting is to fix that erroneous upload.

ADDENDUM 2

GPR 7120.7B and GPR 7120.4D have been uploaded to this DRFP as additional information.

NOTICE 1

It is NASA’s policy to release PDF documents only.  We apologize for the inconvenience, but this is the only format that will be provided.  

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #5 ·

CORRECTION

Two of the same GPRs were inadvertently uploaded.  This posting is to fix that erroneous upload.

ADDENDUM 2

GPR 7120.7B and GPR 7120.4D have been uploaded to this DRFP as additional information.

NOTICE 1

It is NASA’s policy to release PDF documents only.  We apologize for the inconvenience, but this is the only format that will be provided.  

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #4 ·

ADDENDUM 2

GPR 7120.7B and GPR 7120.4D have been uploaded to this DRFP as additional information.

NOTICE 1

It is NASA’s policy to release PDF documents only.  We apologize for the inconvenience, but this is the only format that will be provided.  

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #3 ·

NOTICE 1

It is NASA’s policy to release PDF documents only.  We apologize for the inconvenience, but this is the only format that will be provided.  

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #2 ·

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

  • Attachment F-4 418-XO-OCXUIID-0062_V_1.6
  • Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT (Previously PPXUIID)
  • Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

Previous versions of Attachments F-4, F-6 and H that were uploaded,  have been deleted to eliminate any confusion.

As a result of the above updated technical documents, and other inconsistencies, contract section J.1 has been updated and is uploaded to this addendum posting, as a seperate document. 

All other documents remain unchanged. 

(END ADDENDUM 1)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Update #1 ·

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft Implementation Draft solicitation.  The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).  Please see the attached cover letter and attachments for additiional information.

Attachments

Files attached to this notice, newest first
File Type Posted
GeoXO Spacecraft DRFP Questions and Answers Set 3and Clarificationsdocx.pdf PDF
GeoXO Spacecraft Question and Answer Set 2.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
Addendum 2.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V1_1_DRAFT.pdf PDF
Updated J.1.pdf PDF
ADDENDUM 1.pdf PDF
8.16.23 Final Draft GeoXO Spacecraft Implementation Phase B Procurement.pdf PDF
Exhibit 7C Total Subcontracting Goals.pdf PDF
Attachment D- 418-XO-GIRD-0041_V_2_4_Draft.pdf PDF
Attachment E- 418-XO-PRAD-0037_V_1_4_DRAFT.pdf PDF
Attachment K-418-XO-RPT-0045 FPGA final v1.0 08112022.pdf PDF
Attachment M RESERVED.pdf PDF
Attachment O-GeoXO SC Engineering Units Prototype Units and Risks_MPR.pdf PDF
Attachment P_TAM Table.pdf PDF
Attachment Q MEL.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment Z IT Security Applicable Documents List.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Attachment AC-List of Government Furnished Property.pdf PDF
GeoXO Spacecraft DRFP Cover Letter F .pdf PDF
Draft Exhibit 8 - PPQ_8.9.23_MPR.pdf PDF
Attachment A- 418-XO-SCSOW-0122_Draft Final.pdf PDF
Attachment F-2 418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment F-3 418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-5 418-XO-ACXUIID-0072_V_1_5.pdf PDF
Attachment F-6 418-XO-PPXUIID-0141_V_0_2_DRAFT.pdf PDF
Attachment G-1 418-XO-IRD-0044 DCSIRD V1_3.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2.pdf PDF
Attachment J-418-XO-RPT-0039-V-1-0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 7-13.pdf PDF
Attachment R-Link Budget with Formulas and Instructions_rev4_full.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
DRFP GeoXO Spacecraft Cost Exhibits 1-7 July 2023.pdf PDF
Exhibit 7B Sub Goals Option Periods.pdf PDF
Attachment B- 418-XO-SCCDRL-0053_V_0_1_DRAFT.pdf PDF
Attachment G-2 418-XO-IRD-0043 C3SIRD V1_2.pdf PDF
Attachment L-GeoXO_ConOps_v1-0-final.pdf PDF
Attachment S - OCI Plan DRD.pdf PDF
Enclosure 1 GeoXO SC Draft PEP June 2023F.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GeoXO Spacecraft Award Notice Latest Award Notice
Geostationary Extended Observations (GeoXO) Spacecraft (SC) Award Notice
Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP Latest solicitation Solicitation
GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement This notice Solicitation
Geostationary Extended Observations (GeoXO) Spacecraft (SC) Implementation Presolicitation Notice Pre-Solicitation
80GSFC22R0009 -Geostationary Extended Observations Spacecraft Solicitation Special Notice
80GSFC22R0009 -Geostationary Extended Observations Spacecraft Solicitation Solicitation
Geostationary Extended Observations Spacecraft Presolicitation Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity