About this file

This addendum updates attachments and Section J.1 of the solicitation for the GeoXO Spacecraft DRAFT Request for Proposal Phase B Implementation Procurement issued by the National Aeronautics and Space Administration Goddard Space Center. Specifically, the addendum provides revised versions of Attachments F-4, F-6, and H, and updates contract Section J.1 to reflect the technical changes in the attachments. The solicitation otherwise remains unchanged and seeks proposals for implementation of the Phase B development of the GeoXO spacecraft program.

View the file

Other files for this federal contract opportunity

Other files attached to GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement, newest first.
File Type Posted
GeoXO SC Question and Answer EXCEL Sheet.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
Addendum 2.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V1_1_DRAFT.pdf PDF
Updated J.1.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment F-6 418-XO-PTRUIID-0141_V_0_12_DRAFT.pdf PDF
GeoXO Spacecraft DRFP Cover Letter F .pdf PDF
Draft Exhibit 8 - PPQ_8.9.23_MPR.pdf PDF
Attachment A- 418-XO-SCSOW-0122_Draft Final.pdf PDF
Attachment F-2 418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment F-3 418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-5 418-XO-ACXUIID-0072_V_1_5.pdf PDF
Attachment F-6 418-XO-PPXUIID-0141_V_0_2_DRAFT.pdf PDF
Attachment G-1 418-XO-IRD-0044 DCSIRD V1_3.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2.pdf PDF
Attachment J-418-XO-RPT-0039-V-1-0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 7-13.pdf PDF
Attachment R-Link Budget with Formulas and Instructions_rev4_full.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
Enclosure 1 GeoXO SC Draft PEP June 2023F.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Exhibit 7 Sm Buisness Subcontracting Plan Goals.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_3_final.pdf PDF
Attachment F-1 418-XO-GXIUIID-0023_V_2_4.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V_1_0.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
DRFP GeoXO Spacecraft Cost Exhibits 1-7 July 2023.pdf PDF
Exhibit 7B Sub Goals Option Periods.pdf PDF
Attachment B- 418-XO-SCCDRL-0053_V_0_1_DRAFT.pdf PDF
Attachment G-2 418-XO-IRD-0043 C3SIRD V1_2.pdf PDF
Attachment L-GeoXO_ConOps_v1-0-final.pdf PDF
Attachment S - OCI Plan DRD.pdf PDF
8.16.23 Final Draft GeoXO Spacecraft Implementation Phase B Procurement.pdf PDF
Exhibit 7C Total Subcontracting Goals.pdf PDF
Attachment D- 418-XO-GIRD-0041_V_2_4_Draft.pdf PDF
Attachment E- 418-XO-PRAD-0037_V_1_4_DRAFT.pdf PDF
Attachment K-418-XO-RPT-0045 FPGA final v1.0 08112022.pdf PDF
Attachment M RESERVED.pdf PDF
Attachment O-GeoXO SC Engineering Units Prototype Units and Risks_MPR.pdf PDF
Attachment P_TAM Table.pdf PDF
Attachment Q MEL.pdf PDF
Show all 50

GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 1

The following Attachments have been updated and uploaded to this posting.

• Attachment F-4 418-XO-OCXUIID-0062_V_1.6

• Attachment F-6 418-XO-PTRUIID-0141_V_0.12 DRAFT

(Previously PPXUIID)

• Attachment H- 418-XO-SCMAR-0083_V 1.1 DRAFT

As a result of the above updated technical documents, and other typos, contract section J.1 has been updated and is uploaded to this addendum posting.

All other documents remain unchanged.

File details come from the government source that posted it. Updated .