Attachment N-Spacecraft Final RFP WBS dictionary 7-13.pdf

PDF 287 KB Posted

Attached to
GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement Federal contract opportunity
Solicitation number
80GSFC23R0010
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a Contractor Work Breakdown Structure (CWBS) and CWBS dictionary for the Geostationary eXtended Observations (GeoXO) Flight Project Spacecraft. The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance. It provides a logical subdivision of hardware, software, services, and facilities that contribute to the total project scope of effort. The CWBS dictionary provides narrative descriptions of the work tasks and effort to be performed in each CWBS element. The CWBS includes Level 1 through Level 4 elements, with Level 1 defining the total contract effort and Level 2 defining major contract activities such as Engineering, Spacecraft 1 through 4, Special Tasks, and Mission Operations. Level 3 and 4 elements further subdivide the work. The dictionary describes the work content of each CWBS element, such as program management, systems engineering, hardware, integration and testing, and long-term mission support.

This document also includes information about the GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement, with solicitation number 80GSFC23R0010 from the National Aeronautics and Space Administration Goddard Space Center. However, no further details are provided on products or services required, pricing terms, response dates, or other salient information.

View the file

Other files for this federal contract opportunity

Other files attached to GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement, newest first.
File Type Posted
GeoXO Spacecraft DRFP Questions and Answers Set 3and Clarificationsdocx.pdf PDF
GeoXO Spacecraft Question and Answer Set 2.pdf PDF
GeoXO SC Question and Answer EXCEL Sheet.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
Addendum 2.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment F-6 418-XO-PTRUIID-0141_V_0_12_DRAFT.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V1_1_DRAFT.pdf PDF
Updated J.1.pdf PDF
Enclosure 1 GeoXO SC Draft PEP June 2023F.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Exhibit 7 Sm Buisness Subcontracting Plan Goals.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_3_final.pdf PDF
Attachment F-1 418-XO-GXIUIID-0023_V_2_4.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V_1_0.pdf PDF
8.16.23 Final Draft GeoXO Spacecraft Implementation Phase B Procurement.pdf PDF
Exhibit 7C Total Subcontracting Goals.pdf PDF
Attachment D- 418-XO-GIRD-0041_V_2_4_Draft.pdf PDF
Attachment E- 418-XO-PRAD-0037_V_1_4_DRAFT.pdf PDF
Attachment K-418-XO-RPT-0045 FPGA final v1.0 08112022.pdf PDF
Attachment M RESERVED.pdf PDF
Attachment O-GeoXO SC Engineering Units Prototype Units and Risks_MPR.pdf PDF
Attachment P_TAM Table.pdf PDF
Attachment Q MEL.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment Z IT Security Applicable Documents List.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Attachment AC-List of Government Furnished Property.pdf PDF
GeoXO Spacecraft DRFP Cover Letter F .pdf PDF
Draft Exhibit 8 - PPQ_8.9.23_MPR.pdf PDF
Attachment A- 418-XO-SCSOW-0122_Draft Final.pdf PDF
Attachment F-2 418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment F-3 418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-5 418-XO-ACXUIID-0072_V_1_5.pdf PDF
Attachment F-6 418-XO-PPXUIID-0141_V_0_2_DRAFT.pdf PDF
Attachment G-1 418-XO-IRD-0044 DCSIRD V1_3.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2.pdf PDF
Attachment J-418-XO-RPT-0039-V-1-0.pdf PDF
Attachment R-Link Budget with Formulas and Instructions_rev4_full.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
DRFP GeoXO Spacecraft Cost Exhibits 1-7 July 2023.pdf PDF
Exhibit 7B Sub Goals Option Periods.pdf PDF
Show all 50

GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Heather Matthews

Digitally signed by Heather Matthews Date: 2023.07.13 09:13:40 -04'00'

Candace Carlisle Carlisle Digitally signed by Candace

Date: 2023.07.13 14:01:51 -04'00'

Geostationary eXtended Observations (GeoXO) Flight Project

Spacecraft Contractor Work Breakdown Structure

(CWBS) and CWBS Dictionary July 13, 2023

Prepared by:

Heather Matthews GeoXO Flight Deputy Project Manager/Resources

Approved by:

Candace Carlisle GeoXO Flight Project Manager

Attachment N: Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary

1. DESCRIPTION / PURPOSE

The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, program visibility, and assignment of responsibilities. Additionally, the CWBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work. The CWBS dictionary provides a narrative description of the work tasks and effort to be performed in each CWBS element.

2. PREPARATION INFORMATION

Contents:

The CWBS and CWBS dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:

CWBS – A logical, hierarchical display of the subdivision of all project work to be completed.

The CWBS shall include the approved element title and element number.

CWBS dictionary – The CWBS dictionary shall briefly describe and document the work content of every CWBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).

The CWBS levels shall be governed by the Following. The actual letter and number designations can be adapted to meet the needs of the Contractor’s systems

Level 1 - Total contract effort

Level 2 Definitions: Major contract activity as described below

A. Engineering Unit / Non-Recurring Activities – All effort to plan and manage the design of the Spacecraft including detailed design activities, design reviews, risk reduction (engineering models, etc), software development, GSE development, verification planning, etc.

B. GeoI1 – All effort related to fabrication, assembly, test, launch operations and on-orbit testing of the satellite

C. GeoI2 D. GeoI3 E. GeoI4 F. GeoS1 G. GeoS2 H. GeoS3 I. Special Tasks – all un-issued special task funds remain in this level 2 WBS J. Mission Operations - Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission

Level 3 Definitions (Note: X denotes the Level 2 Contract Activity) – the work content as described is not necessarily all inclusive.

X.01 Program Management – Including program leadership, resource management, program planning (schedule), data management, configuration management, support for major design reviews

X.02 Systems Engineering - Including system engineering leadership, interface management, system specification definition and flow-down, verification planning, system level analysis and modeling

X.03 Mission Assurance - Including mission assurance leadership, quality engineering, subcontract surveillance, safety, reliability, parts and materials management

X.04 Hardware / Software – All subsystem hardware and software effort including parts and materials which should be accounted for in a separate line. Effort included in each level 2 WBS

X.05 Integration & Test – Spacecraft integration and environmental testing through shipment to the Cape

X.06 Ground Support Equipment (GSE) – design, fabrication, procurement assembly, test and maintenance of electrical, mechanical GSE and mission simulation and GSE software

X.07 Launch and Post Launch Testing– support for pre-launch planning, launch site support, support for mission unique or special launch services, launch-vehicle integration (spacecraft portion), and the first 6 months of post-launch testing prior to the handoff to NOAA.

X.08 Special Tasks – Actual and projected cost of special tasks issued for a specific level 2

WBS.

X.09 Long Term Support – Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission

Level 4 – The Contractor shall define WBS level within each level 3 and provide a brief description of the work content. For example, A.04.01 C&DH

File details come from the government source that posted it. Updated .