GeoXO Spacecraft Question and Answer Set 2.pdf
PDF 72 KB Posted
- Attached to
- GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement Federal contract opportunity
- Solicitation number
- 80GSFC23R0010
About this file
This document contains questions and answers related to a draft request for proposal from the National Aeronautics and Space Administration Goddard Space Center. The questions concern providing block diagrams and dimensional diagrams for spacecraft subsystems and components as part of a proposal for the GeoXO Spacecraft Phase B Implementation Procurement. The agency will allow such diagrams to be included in an appendix that is excluded from the page limit of the Mission Suitability Volume. The appendix will also have its own page limit.
View the file
Other files for this federal contract opportunity
Show all 50
GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GeoXO Spacecraft Phase B, Implementation Procurement
Questions and Answers #2
Question:
The instructions require considerable block diagrams and schematic-like design drawings with our proposal. For example, in A.3 Spacecraft
Design: “The Offeror shall highlight, for each subsystem, any differences between the Geol and GeoS spacecraft designs. The Offeror shall provide a block diagram of all spacecraft subsystems and their components for
GeoI and GeoS.” And “The Offeror shall provide dimensioned diagrams of the proposed design.” However, these instructions, combined with the page limitations and font size requirements for graphics, negatively affects the ability to provide block diagrams and dimensioned diagrams required to effectively illustrate the systems and subsystems within the proposal volume. Would the Government consider excluding from page count the block diagrams and dimensional diagrams for the systems and subsystems required per the instructions, placing them in an appendix to the Mission Suitability Volume?”
Answer:
The final RFP will include instructions that the Offeror may include an appendix A to the Mission Suitability Volume to include diagrams.
There will be a page limit on the appendix.
File details come from the government source that posted it. Updated .