This document is a cover letter for a draft request for proposal for the GeoXO Spacecraft Implementation procurement. The National Aeronautics and Space Administration Goddard Space Flight Center is seeking proposals to design, develop, integrate, test, evaluate, support launch, and provide engineering development units for seven GeoXO spacecraft over a period of performance of 15 years per spacecraft. The procurement will result in a cost-plus-award-fee contract for the development of three spacecraft initially and four optional additional spacecraft. The anticipated contract award date is late May 2024. Proposals are due approximately 45 days after release of the final RFP, planned for mid to late September 2023. Offerors should review the draft RFP and provide any comments on all aspects by August 30, 2023. The procurement has a NAICS code of 336414 and small business size standard of 1,300 employees.
View the file
Other files for this federal contract opportunity
Show all 50
GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.: 8/2020
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, MD 20771
Reply to Attn of: 172
TO: All Potential Offerors
SUBJECT: Draft Request for Proposal (DRFP), Solicitation No. 80GSFC23R0010, for
Geostationary Extended Observations (GeoXO) Spacecraft Implementation
You are invited to review and comment on the National Aeronautics and Space
Administration (NASA) Goddard Space Flight Center’s Geostationary Extended
Observations (GeoXO) Spacecraft Implementation solicitation. The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft.
The GeoXO spacecraft are three axis stabilized geostationary spacecraft that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the Ground System Equipment (GSE) and simulators; and support the mission operations at the NOAA Satellite Operations Facility (NSOF).
Please note, funding limitations may be stipulated within the Final RFP for Government fiscal years 24-26.
The spacecraft has a risk classification of Class B.
Potential offerors are encouraged to comment on all aspects of the draft solicitation, including the requirements, schedules, proposal instructions, and evaluation approaches, any perceived safety, occupational health, security (including information technology security), environmental, export control, and/or other programmatic risk issues associated with performance of the work.
This competitive acquisition will result in a Cost-Plus-Award-Fee (CPAF) hardware contract, for the development of three spacecraft, and four options for additional spacecraft. The anticipated period of performance for this contract includes support for 10 years of on-orbit operations and 5 years of on-orbit storage, for a total of 15 years for each Flight Model (FM).
The North American Industry Classification System (NAICS) code for this acquisition is
336414 and the small business size standard is 1,300 employees.
Section H.13, Special Task Support Requirements of the DRFP specifies that the
Government may order special study tasks under the resultant hardware contract for risk reduction and mitigation activities. The clause includes a plug number of $35,000,000 that each offeror can use for bidding purposes.
Potential offerors should ensure its company is listed in the online database(s) for the following:
(1) System for award management: https://www.sam.gov/SAM/
(2) U.S. Department of Labor Veterans’ Employment and Training Service, VETS-4212
Reports: https://vets4212.dol.gov/vets4212/
(3) Date Universal Numbering System (and the transition to the US Government’s unique entity identifier (UEI)): https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-information-kit/unique-entity-identifier-update
The successful offeror must pass an Equal Employment Opportunity (EEO) clearance before contract award (See FAR 22.805).
The current planned release date for the Final Request for Proposal (RFP) is on or about mid to late September 2023 with proposals being due approximately 45 calendar days after RFP release.
The anticipated contract award date and effective date is late May 2024. The contract will be performed offsite at the Contractor’s facilities, and onsite at GSFC and Kennedy Space
Center (KSC).
Proposals for this solicitation are required to be submitted through NASA’s Enterprise File
Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform. Potential offerors, especially those that have not previously submitted a proposal utilizing NASA’s
EFSS Box, are encouraged to review the solicitation instruction entitled “Electronic Proposal
Delivery - Proposal Marking and Delivery Through NASA’s EFSS Box” which provides instructions related to the submission of proposal via EFSS Box. Offerors are encouraged to check with their corporate IT staff to determine if there are firewall restrictions that would need to be addressed prior to the submission of proposal files through NASA’s EFSS Box.
In order to control and protect sensitive data owned by the Government and its Contractors, NASA policy requires all acquisition-related documents be released in Adobe Portable
Document Format (PDF).
Documents related to this acquisition, including this letter, the solicitation, attachments, exhibits, any amendments, and links to online reference/technical/bidders’ library will be attainable electronically from the World Wide Web through the Government-wide point of entry website at www.SAM.gov. Potential Offerors are requested to periodically monitor the websites for updates.
NASA FAR Supplement (NFS) clause 1852.215-84, OMBUDSMAN, is applicable. The
Ombudsman for this acquisition is Raymond “Ray” Rubilotta, Associate Director, raymond.j.rubilotta@nasa.gov, 301-286-5867.
This DRFP is not a solicitation and NASA is not requesting proposals. This DRFP does not commit NASA GSFC to pay any proposal preparation costs, nor does it obligate NASA
GSFC to procure or contract for this requirement. This request is not an authorization to proceed and does not authorize payment for any charges incurred by the offeror for performing any of the work called for in this solicitation.
Any comments regarding the DRFP should be submitted electronically in writing, to Lisa
Mullen, Contracting Officer at Lisa.A.Mullen@nasa.gov no later than August 30, 2023. If a respondent believes their comments contain confidential, proprietary, competition sensitive, or business information, those questions/comments shall be marked appropriately. However, questions that are marked as containing confidential, proprietary, competition sensitive or business information will not be provided a Government response. The Government will consider all comments received in preparation of the Final RFP. To the extent a comment leads the Government to revise the acquisition approach or requirements, the change will be reflected in the Final RFP. Some DRFP questions and comments may receive a posted response to the Government Point of Entry (GPE) if the Contracting Officer determines that a response would facilitate additional understanding of the solicitation. The Government may also respond via the GPE to comments and/or questions received following the issuance of the Final Request for Proposal (RFP).
Lisa Mullen
Contracting Officer
Enclosure to this Cover Letter:
Reference Chart
Acronym List
Draft RFP 80GSFC23R0010
ACRONYM LIST GEOXO SPACECRAFT DRFP
ACX GeoXO Atmospheric Composition Instrument BOL Beginning of Life
C3S Command, Control, and Communications Segment CBU Consolidated Back-Up
CDA Command and Data Acquisition
CDAS Command and Data Acquisition Stations (CDAS) CDR Critical Design Review
CDRL Contract Data Requirements List CIL Critical Items List COR Contracting Officer’s Representative
CPT Comprehensive Performance Test CSCI Computer Software Configuration Item
CUI Controlled unclassified information
CWBS Contract Work Breakdown Structure
DCPC DCS Platform Commanding
DCPR DCS Platform Relay
DCS Data Collection System
DID Data Item Description
DMR Design Modification Review
DOORS Dynamic Object Oriented Requirements System
EEE Electrical, Electronic, Electro-mechanical EEZ Exclusive Economic Zone
EGSE Electrical Ground Support Equipment EMC Electromagnetic Compatibility
EMI Electromagnetic Interference
EOMP End of Mission Plan
ESD Electrostatic Discharge
ETE End-to-End
EVM Earned Value Management F&PS Functional and Performance Specification
FM Flight Model FMEA/FMECA Failure Modes Effects and Criticality Analysis
FOD Foreign Object Debris
FOR Flight Operations Review
FPGA Field Programmable Gate Array
FRR Flight Readiness Review
FSDE Flight Software Development Environment FTA Fault Tree Analysis
GeoXO Geostationary eXtended Observations
GIRD General Interface Requirements Document GPA Ground Processing Algorithm
GPDS Ground Processing Demonstration System
GSE Ground Support Equipment GSFC Goddard Space Flight Center GSRT Goddard Systems Review Team
GXI GeoXO Imager GXS GeoXO Sounder HAR Hardware Acceptance Review
I&T Integration and Test IBR Integrated Baseline Review
ICD Interface Control Document IHS Instrument Hardware Simulator IMS Integrated Master Schedule
INR Image Navigation and Registration
IRR Instrument Receiving Review
ISAR Instrument Safety Assessment Report ISS Instrument Software Simulator IV&V Independent Verification and Validation
KSC Kennedy Space Center LMX GeoXO Lightning Mapper LOR Launch and Orbit Raising
LPD Launch Planning Date LPT Limited Performance Test LRR Launch Readiness Review
LSP Launch Services Program
MA Mission Assurance
MAID Master Action Item Database
MAT Mission Allowable Temperature
MCDR Mission Critical Design Review
MGSE Mechanical Ground Support Equipment MIUL Materials Identification and Usage List MOM Mission Operations Manager MOR Mission Operations Review
MOST Mission Operations Support Team
MPDR Mission Preliminary Design Review
MRB Material Review Board
MRR Manufacturing Readiness Review
MUA Materials Usage Agreement NASA National Aeronautics and Space Administration
NIST National Institute of Standards and Technology
NSOF NOAA Satellite Operational Facility
OCX GeoXO Ocean Color Instrument ODAR Orbital Debris Assessment Report ORR Operational Readiness Review
PCB Printed Circuit Board
PDR Preliminary Design Review
PER Pre-Environmental Review
PFM Proto-Flight Model
PLAR Post Launch Assessment Review
PLT Post-launch Test PMO Project Management Office
PMSR Project Management Status Review
PRAD Payload Resource Allocation Document PSR Pre-Storage/Ship Review
RFA Request for Action
S3 Satellite Software Simulator SCMAR Spacecraft Mission Assurance Requirements
SCTS Spacecraft Command and Telemetry Simulator SDR System Definition Review
SHS Spacecraft Hardware Simulator SIIS Spacecraft to Instrument Interface Simulator SIR System Integration Review
SMA Safety and Mission Assurance
SMS Simulator Matrix Switch
SOW Statement of Work
SPVP System Performance Verification Plan
SRR System Requirements Review SS Space Segment SWAR Software Acceptance Review
SWCDR Software Critical Design Review
SWPDR Software Preliminary Design Review SWTRR Software Test Readiness Review TB Thermal Balance
TDAS Test Data Analysis System
TDR Test Data Review
TIM Technical Interchange Meeting
TRL Technology Readiness Level TRR Test Readiness Review
UIID Unique Instrument Interface Document V&V Verification and Validation
| 2023-08-16T15:46:39-0400 | |
| Lisa Mullen |
File details come from the government source that posted it. Updated .