This document is a Unique Instrument Interface Document (UIID) that allocates resources from the GeoXO Spacecraft to the GeoXO Imager (GXI) instrument. It specifies requirements for the command and data handling interface, power allocation, mass properties, volume, and mechanical, disturbance, and thermal interfaces. The document establishes performance requirements for the GXI including maximum data rates of 150 Mbps for science data and 1 kbps for telemetry data. It allocates a maximum of 255 Application Process Identifiers and limits the GXI to transmitting no more than 400 Reliable Data Delivery Protocol packets per second. Power requirements include average operational power of 614 Watts, maximum operational power of 985 Watts, average survival power of 400 Watts, and maximum survival power of 600 Watts. Mass is limited to less than 330 kilograms. Volume and field of view allocations are also specified. Disturbance and mounting requirements establish limits on angular momentum, accelerations, and predicted interface forces and torques. The document identifies applicable and reference documents and provides requirements for design verification.

View the file

Other files for this federal contract opportunity

Other files attached to GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement, newest first.
File Type Posted
GeoXO Spacecraft DRFP Questions and Answers Set 3and Clarificationsdocx.pdf PDF
GeoXO Spacecraft Question and Answer Set 2.pdf PDF
GeoXO SC Question and Answer EXCEL Sheet.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment F-6 418-XO-PTRUIID-0141_V_0_12_DRAFT.pdf PDF
ADDENDUM 1.pdf PDF
Enclosure 1 GeoXO SC Draft PEP June 2023F.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Exhibit 7 Sm Buisness Subcontracting Plan Goals.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_3_final.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V_1_0.pdf PDF
8.16.23 Final Draft GeoXO Spacecraft Implementation Phase B Procurement.pdf PDF
Exhibit 7C Total Subcontracting Goals.pdf PDF
Attachment D- 418-XO-GIRD-0041_V_2_4_Draft.pdf PDF
Attachment E- 418-XO-PRAD-0037_V_1_4_DRAFT.pdf PDF
Attachment K-418-XO-RPT-0045 FPGA final v1.0 08112022.pdf PDF
Attachment M RESERVED.pdf PDF
Attachment O-GeoXO SC Engineering Units Prototype Units and Risks_MPR.pdf PDF
Attachment P_TAM Table.pdf PDF
Attachment Q MEL.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment Z IT Security Applicable Documents List.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Attachment AC-List of Government Furnished Property.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
DRFP GeoXO Spacecraft Cost Exhibits 1-7 July 2023.pdf PDF
Exhibit 7B Sub Goals Option Periods.pdf PDF
Attachment B- 418-XO-SCCDRL-0053_V_0_1_DRAFT.pdf PDF
Attachment G-2 418-XO-IRD-0043 C3SIRD V1_2.pdf PDF
Attachment L-GeoXO_ConOps_v1-0-final.pdf PDF
Attachment S - OCI Plan DRD.pdf PDF
GeoXO Spacecraft DRFP Cover Letter F .pdf PDF
Draft Exhibit 8 - PPQ_8.9.23_MPR.pdf PDF
Attachment A- 418-XO-SCSOW-0122_Draft Final.pdf PDF
Attachment F-2 418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment F-3 418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-5 418-XO-ACXUIID-0072_V_1_5.pdf PDF
Attachment F-6 418-XO-PPXUIID-0141_V_0_2_DRAFT.pdf PDF
Attachment G-1 418-XO-IRD-0044 DCSIRD V1_3.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2.pdf PDF
Attachment J-418-XO-RPT-0039-V-1-0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 7-13.pdf PDF
Attachment R-Link Budget with Formulas and Instructions_rev4_full.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Show all 50

GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: March 23, 2023 418-XO-GXIUIID-0023 Responsible Organization: GeoXO Flight Project/Code 418 Version 2.4

To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.

Geostationary eXtended Observations (GeoXO) Flight Project

Imager (GXI) Unique Instrument Interface Document (GXIUIID)

Signature page

Prepared by:

Electronically approved by: 05/03/2021

Jemma Kline Date GeoXO Flight Project, Instrument Systems Engineer NASA GSFC, Code 418

Reviewed by:

Electronically approved by: 05/11/2021

Alexander Krimchansky Date GeoXO Flight Project, Mission Systems Engineer NASA GSFC, Code 599

Approved by:

Electronically approved by: 05/13/2021

Jason H. Hair Date GeoXO Flight Project, Project Manager NASA GSFC, Code 418

/GeoXO Flight Project Imager

GXIUIID

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

Version: 2.4 Printed by: rkhoover Printed on: Thursday, August 10, 2023

No filter applied.

No sort applied.

Generated from DOORS 9.7.2.4

Contents

1 1Scope

1.1 1Document Overview

1.2 1Requirements Terminology

1.3 2Order of Precedence

2 3Documents (CCR-X00072)

2.1 3Applicable Documents (CCR-X00072)

2.2 3Reference Documents (CCR-X00072)

3 4Allocations

3.1 4Command and Data Handling

3.1.1 4Instrument-to-Spacecraft Science Rate

3.1.2 4Telemetry Data Rate

3.1.3 4Application Process Identifiers

3.1.4 4GeoXO Reliable Data Delivery Protocol Packet Rate (CCR-X00072)

3.2 4Power

3.2.1 4Average Operational Power

3.2.2 4Maximum Operational Power

3.2.3 4Average Survival Power

3.2.4 4Maximum Survival Power

3.3 5Mechanical

3.3.1 5Mass Properties

3.3.2 5Cabling Between Units

3.3.3 5Volume

3.3.4 5Optical Port Field-of-View

3.3.5 6Radiator Field-of-View (CCR-X00011)

3.3.6 6Field-of-View in the +X direction (CCR-X00039A)

3.3.7 6Mounting

3.4 6Mechanical Disturbances (CCR-X00039A)

3.4.1 6Integrated Angular Momentum

3.4.2 7Angular Momentum Limits

3.4.3 7Instrument Translation Acceleration Limits

3.4.4 9Predicted Interface Force and Torque (PIFT) Responses

3.4.5 10Spacecraft Mounting Stiffness

3.4.6 10External Sourced Translation Acceleration Limits

Project: GeoXO Flight Project Imager Module: GXIUIID Baseline Version: 2.4

Contents ii

3.4.7 12Instrument Torque Limit (CCR-X00039A)

3.5 12Thermal

3.6 12Reserved (CCR-X00167)

4 13Constraints

5 14GIRD Deviations

6 15Design Verification Requirements

6.1 15Reserved (CCR-X00167)

6.2 15Radiated Emissions in DCS Receiver Bands

7 17Acronyms

Contents iii

Page 1 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID1

GXIUIID2

GXIUIID3

GXIUIID4

GXIUIID5

GXIUIID6

GXIUIID7

GXIUIID8

GXIUIID9

GXIUIID10

GXIUIID11

GXIUIID12

Object Number

1.0-1

1.0-2

1.0-3

1.0-4

1.0-5

1.0-6

1.1

1.1.0-1

1.2

1.2.0-1

1.2.0-2

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

1 Scope

The purpose of this Unique Instrument Interface Document (UIID) is two-fold. The first is to allocate GeoXO Series Spacecraft resources to the GXI. The second is to serve as a core building block on which the GXI-spacecraft interface can be designed. The spacecraft integrating contractor and the GXI contractor shall meet each of their respective interface requirements as defined in this document. (CCR- X00072)

The Government will be the system integrator until a system performance contractor or spacecraft contractor with that responsibility is selected. Until that time, the Government will be responsible for accommodation trades, resource allocation (weight, power, space, bandwidth, etc.), and resolving interface issues. This UIID will govern the development of an Interface Control Document (ICD) which will be a joint activity of the GXI and spacecraft contractors. (CCR-X00072)

The GXI ICD establishes the details of the electrical, communications, mechanical, thermal, integration and test, and command and data handling (C&DH) interfaces between the GXI instrument and the GeoXO Spacecraft. After the ICD is signed and approved by all parties, the spacecraft contractor shall maintain the ICD. (CCR- X00072)

The GXI is a radiometer designed to provide variable area imagery and radiometric information of the Earth's surface, atmosphere and cloud cover. The instruments collect data on a three-axis body-stabilized satellite in geosynchronous orbit. (CCR-

X00072) (CCR-X00114)

Data availability, radiometric quality, simultaneous data collection, coverage rates, scan flexibility, and minimizing data loss due to the sun are prime requirements of the system. The instrument requires primary power and command input data from the spacecraft. Instrument output data to the spacecraft contains instrument information, instrument telemetry and ancillary data.

The sensor units contain the optical system, scanner, detectors and their cooling systems and directly related electronics. The electronics unit contains the power supply module, command, control, and data processing circuitry. If required, an auxiliary electronics unit may be used for active detector cooling.

1.1 Document Overview

Together, the General Interface Requirements Document (GIRD) and the GXI UIID establish the GXI-spacecraft interface requirements. The GIRD applies to all GeoXO instruments while the GXI UIID is specific to the GXI. Section 1 explains the use of this document. Section 2 lists reference documents. Section 3 allocates spacecraft resources, such as mass, power, and data rate, to the GXI instrument. Section 4 contains government-accepted operation constraints. Section 5 contains government-accepted deviations from the GIRD. Section 6 contains Design Verification Requirements. Section 7 contains a list of acronyms used within this document. (CCR-X00072)

1.2 Requirements Terminology

The following requirements terminology is used throughout this document:

The use of "shall" designates a requirement that must be met. (CCR-X00072)

Page 2 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID13

GXIUIID14

GXIUIID15

GXIUIID18

GXIUIID22

GXIUIID23

Object Number

1.2.0-3

1.2.0-4

1.2.0-5

1.2.0-6

1.3

1.3.0-1

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

The use of "will" designates a statement of fact or intention of the government.

(CCR-X00072)

The use of "may" designates that permission has been granted by the government.

(CCR-X00072)

The term "(TBD)" means, "to be determined" and is used when no value is available with subsequent study needed to obtain it. (CCR-X00072)

The term "(TBR)" means "to be refined/reviewed" for a value that is subject to review for appropriateness and is subject to revision. The vendor is liable for compliance with the information marked "TBR" as if the "TBR" notation did not exist.

(CCR-X00072)

1.3 Order of Precedence

The order of precedence of interface requirements documents is the UIID at the highest level, followed in order by the GIRD, ICD, and Instrument Description Document (IDD).

Page 3 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID24

GXIUIID25

GXIUIID134

GXIUIID133

GXIUIID135

Object Number

2.1

2.1.0-1

2.2

2.2.0-1

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

2 Documents (CCR-X00072)

2.1 Applicable Documents (CCR-X00072)

The following documents form a part of this specification to the extent specified herein.

General Interface Requirements Document, NASA-GSFC, 418-XO-GIRD-0041

MIL-STD-461G – Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment, 11 December 2015

(CCR-X00072)

2.2 Reference Documents (CCR-X00072)

The following documents provide reference material for part of this document.

CCSDS 133.0-B-2 - Space Packet Protocol, Blue Book, Issue 2, June 2020

CCSDS 301.0-B-4 - Time Code Formats. Blue Book. Issue 4, November 2010

418-XO-RPT-0039 - GOES Reliable Data Delivery Protocol (GRDDP)

(CCR-X00072)

Page 4 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID26

GXIUIID27

GXIUIID28

GXIUIID29

GXIUIID30

GXIUIID31

GXIUIID32

GXIUIID33

GXIUIID34

GXIUIID35

GXIUIID36

GXIUIID37

GXIUIID38

GXIUIID39

GXIUIID40

GXIUIID41

GXIUIID42

GXIUIID43

GXIUIID44

Object Number

3.0-1

3.1

3.1.1

3.1.1.0-1

3.1.2

3.1.2.0-1

3.1.3

3.1.3.0-1

3.1.4

3.1.4.0-1

3.2

3.2.1

3.2.1.0-1

3.2.2

3.2.2.0-1

3.2.3

3.2.3.0-1

3.2.4

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

3 Allocations

The GeoXO Spacecraft provides communications, power and a platform for the GXI instrument. The following paragraphs allocate these resources to GXI. (CCR- X00072)

3.1 Command and Data Handling

3.1.1 Instrument-to-Spacecraft Science Rate

The instrument science and engineering data rate, including all overhead associated with Consultative Committee for Space Data Systems (CCSDS) packetization by the instrument, at the spacecraft interface shall not exceed 150 million (106) bits per second when averaged over any 5 second period. (CCR-X00011) (CCR-X00072)

3.1.2 Telemetry Data Rate

Housekeeping telemetry data rate, including all overhead associated with CCSDS packetization by the instrument, at the spacecraft interface shall not exceed 1024 bits per second when averaged over any 5 second period.

3.1.3 Application Process Identifiers

The GXI shall use no more than 255 consecutive Application Process Identifiers (APIDs) for science, telemetry, and command packets. (CCR-X00072)

3.1.4 GeoXO Reliable Data Delivery Protocol Packet Rate

(CCR-X00072)

The GXI shall transmit to the spacecraft no more than 400 GOES Reliable Data Delivery Protocol (GRDDP) Packets per second. (CCR-X00039A) (CCR-X00072)

3.2 Power

3.2.1 Average Operational Power

The GXI shall draw operational average power, inclusive of heaters, of no more than 614 Watts from up to eight total feeds including primary and redundant feeds.

Operational average power is the total power into an instrument averaged over any 5 minute period. (CCR-X00011) (CCR-X00017) (CCR-X00039A) (CCR-X00072)

3.2.2 Maximum Operational Power

The GXI shall draw operational maximum power of no more than 985 Watts.

Operational maximum power is the total power into an instrument averaged over any 20 ms period. (CCR-X00011) (CCR-X00017) (CCR-X00072)

3.2.3 Average Survival Power

The GXI shall draw average survival power of no more than 400 Watts. Average survival power is the total power into an instrument averaged over any 72 minute period. (CCR-X00017) (CCR-X00072)

3.2.4 Maximum Survival Power

Page 5 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID45

GXIUIID46

GXIUIID47

GXIUIID48

GXIUIID49

GXIUIID50

GXIUIID51

GXIUIID52

GXIUIID53

GXIUIID54

GXIUIID126

GXIUIID55

Object Number

3.2.4.0-1

3.3

3.3.0-1

3.3.1

3.3.1.0-1

3.3.2

3.3.2.0-1

3.3.2.0-2

3.3.3

3.3.3.0-1

3.3.3.0-2

3.3.4

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

The GXI shall draw maximum survival power of no more than 600 Watts. Maximum survival power is the total power into an instrument averaged over any 20 ms period. (CCR-X00017) (CCR-X00072)

3.3 Mechanical

The requirements in this section apply to the structural and mechanical components of the instrument flight units (sensor unit, electronics unit and, if applicable, auxiliary electronics unit).

3.3.1 Mass Properties

The GXI, including all units and cabling between units, shall have mass less than 330 kilograms. (CCR-X00079)

3.3.2 Cabling Between Units

If there are external units mounted directly to the spacecraft, the GXI shall accommodate any cable length between the units up to but not exceeding the lengths of 4 meters. (CCR-X00072)

Cables between GXI units will be the responsibility of the GXI contractor. (CCR- X00072)

3.3.3 Volume

The GXI Sensor Unit operational (deployed) configurations, including mounts, thermal blankets and connectors, shall have dimensions that do not exceed the limits provided below.

Height: 1620 millimeters

Length: 1360 millimeters

Width: 1750 millimeters

Height is along the instrument frame Z axis. Length is along the instrument frame Y axis. Width is along the instrument frame X axis. The instrument frame is defined in

GIRD64.

(CCR-X00017) (CCR-X00072)

The GXI Sensor Unit stowed configurations, including mounts, thermal blankets and connectors, shall have dimensions that do not exceed the limits provided below.

Height: 1500 millimeters

Length: 1200 millimeters

Width: 1750 millimeters

Height is along the instrument frame Z axis. Length is along the instrument frame Y axis. Width is along the instrument frame X axis. The instrument frame is defined in

GIRD64.

(CCR-X00017) (CCR-X00072)

3.3.4 Optical Port Field-of-View

Page 7 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID67

GXIUIID69

GXIUIID70

GXIUIID72

GXIUIID74

Object Number

3.4.1.0-1

3.4.2

3.4.2.0-1

3.4.2.0-2

3.4.3

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

The absolute value of the high pass filtered angular momentum integrated with respect to time shall not exceed the values listed in Filtered Integrated Angular Momentum Limits table. The filter is a second order Butterworth filter with a -3 dB cutoff frequency at 0.01 Hz. The satellite center of mass will be within 2 meters of the centroid of the sensor unit mounts.

Filtered Integrated Angular Momentum Limits

Limit Axis (N-m-s2)

Roll 0.50

Pitch 0.35 Yaw 0.50

(CCR-X00017)

3.4.2 Angular Momentum Limits

The absolute value of the high pass filtered angular momentum produced by the sensor unit referenced at the satellite center of mass shall not exceed the values listed in the Angular Momentum Limits table. The high pass filter is a second order Butterworth filter with a -3 dB cutoff frequency at 0.01 Hz. The satellite center of mass will be within 2 meters of the centroid of the sensor unit mounts.

Angular Momentum Limits

Limit Axis (N-m-s)

Roll 0.10

Pitch 0.05 Yaw 0.10

(CCR-X00017)

The absolute value of the band-pass-filtered instrument angular momentum in each orthogonal axis shall not exceed the values listed in the One-Sixth Octave Band Filtered Angular Momentum Limits table. The bandpass filters for this requirement are defined as a series of eighth-order Butterworth bandpass filters with -3 dB bandwidth of one sixth of an octave. The first filter in the series has its center frequency at 0.015625 Hz, and the center frequencies for the series are spaced at one-twelfth octave up to 10 Hz. The Bandpass-Filtered Angular Momentum Limits apply to filters with center frequency greater than f1 and less than or equal to f2.

One-Sixth Octave Band Filtered Angular Momentum Limits f1 (Hz) f2 (Hz)

Limit (N-m-s)

0.01 0.25 0.050

0.25 1.0 0.020

1.0 10.0 0.015

(CCR-X00039A)

3.4.3 Instrument Translation Acceleration Limits

Page 10 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID90

GXIUIID91

GXIUIID92

GXIUIID127

GXIUIID94

Object Number

3.4.4.0-11

3.4.5

3.4.5.0-1

3.4.5.0-2

3.4.6

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

The GXI shall send to the spacecraft predicted torque data with an accuracy of +/-

0.03 N-m. (CCR-X00072)

3.4.5 Spacecraft Mounting Stiffness

The instrument shall meet its performance requirements while the sensor unit is mounted to a rigid plate supported at three flexible points with a first mode of 20 +/- 5 Hz and with the 6th mode less than 50 Hz. (CCR-X00017) (CCR-X00039A)

The instrument shall meet its performance requirements when the diagonal modal viscous damping factors associated with the three flexible points are 0.1%. (CCR-

X00017) (CCR-X00039A)

3.4.6 External Sourced Translation Acceleration Limits

Page 13 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID104

GXIUIID105

GXIUIID106

Object Number

4.0-1

4.0-2

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

4 Constraints

In order to ensure proper instrument performance or to prevent possible instrument damage, the following Government-approved constraints are imposed by the instrument developer on spacecraft integration and test activities, including launch, activation and operations.

No constraints have been identified at this time.

Page 14 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID107

GXIUIID108

Object Number

5.0-1

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

5 GIRD Deviations

This section identifies GIRD requirements that the Government has deviated from for this instrument. Where appropriate, corresponding GIRD paragraph titles and numbers are identified in parentheses.

Page 15 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID109

GXIUIID110

GXIUIID111

GXIUIID112

GXIUIID114

GXIUIID115

GXIUIID116

GXIUIID117

GXIUIID118

GXIUIID119

GXIUIID120

Object Number

6.0-1

6.1

6.1.0-1

6.1.0-2

6.2

6.2.0-1

6.2.0-2

6.2.0-3

6.2.0-4

6.2.0-5

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

6 Design Verification Requirements

The following requirements represents only a portion of the overall system verification ( i.e., contractor derived requirements are not described) that must be integrated into the total system program which verifies that the system will meet the mission requirements. A system performance verification program documenting the overall verification plan, implementation, and results is required which will provide traceability from mission specification requirements to launch and initial on-orbit capability. This will also provide the baseline for tracking on-orbit performance versus pre-launch capability.

6.1 Reserved (CCR-X00167)

Reserved (CCR-X00039A) (CCR-X00167)

Reserved (CCR-X00167)

6.2 Radiated Emissions in DCS Receiver Bands

Radiated emission measurements in the DCS receiver bands shall be made in accordance with MIL-STD-461, RE102 with the EMI meter replaced by a spectrum analyzer preceded by a low noise pre-amplifier such that the test system noise figure is equal to or less than 3 dB, e.g., an HP-8566 spectrum analyzer preceded by a MITEQ AU-2A-0550 pre-amplifier or equivalent.

The spectrum analyzer levels and the difference in the levels shall be recorded for both white noise and spurious signals before and after power is applied to the instrument clock and control signals.

The test antenna shall be tuned to the center of the frequency band specified in DCS EMC Test Parameters Table (GXIUIID121).

Prior to making the actual measurements, the test antenna shall be de-mated and the cable terminated with 50 ohms for self calibration.

The noise floor of the measuring equipment shall be verified to be lower than the specified maximum signal level in a 100 Hz resolution bandwidth.

Page 17 of 17 Printed Thursday, August 10, 2023

ID

GXIUIID123

GXIUIID124

Object Number

7.0-1

418-XO-GXIUIID-0023, RM Version, GeoXO Imager (GXI) Unique Instrument Interface Document (UIID)

7 Acronyms

APID Application Process Identifier C&DH Command and Data Handling CCSDS Consultative Committee for Space Data Systems GIRD General Interface Requirements Document GOES Geostationary Operational Environmental Satellite GSFC Goddard Space Flight Center

GXI GEO-XO GXI

Hz Hertz ICD Interface Control Document IDD Instrument Description Document kg kilogram m meter Mbps million bits per second NASA National Aeronautics and Space Administration PORD Performance and Operational Requirements Document SRS Shock Response Spectra TBD to be determined TBR to be refined/reviewed UIID Unique Instrument Interface Document

(CCR-X00072)

Effective Date: March 23, 2023 418-XO-GXIUIID-0023

To verify the correct version of this document, please contact the GeoXO Series Configuration Management

Document Change Record (DCR)

CCR GeoXO-X00003 Rev: Title: GeoXO – GXIUIID Document Baseline Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 11/02/2020 Doc Version: 1.0 Contract Mod#: N/A DOORs Version: 1.0 Doc Change Date: Nov. 02, 2020 DOORs ID #: N/A

CCR GeoXO-X00011 Rev: Title: GXIUIID: Updates for Phase A Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 04/20/2021 Doc Version: 1.1 Contract Mod#: N/A DOORs Version: 1.1 Doc Change Date: Apr. 20, 2020 DOORs ID #: Modify: GXIUIID30 (3.1.1.0-1), 39 (3.2.1.0-1), 41 (3.2.2.0-1), 58 (3.3.5), 75

(3.4.3.0-1), 77 (3.4.3.0-2), 95 (3.4.6.0-1), 97 (3.4.6.0-2) Add: GXIUIID125 (3.3.5.0-2)

CCR GeoXO-X00017 Rev: Title: GXIUIID: More updates for Phase A Contract # GXI- 80GSFC21C0061 GeoXO S/C: GeoXO Effectivity: Instruments

GXI - 80GSFC21C0062

CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 05/13/2021 Doc Version: 2.0 Contract Mod#: 1 DOORs Version: 2.0 Doc Change Date: May 13, 2021 DOORs ID #: Modify: GXIUIID39 (3.2.1.-1), 41 (3.2.2.0-1), 43 (3.2.3.0-1), 45 (3.2.4.0-1), 54 (3.3.3.0-1), 59 (3.3.5.0-1), 67 (3.4.1.0-1), 70 (3.4.2.0-1), 92 (3.4.5.0-1), 125 (3.3.5.0-2) Add: GXIUIID126 (3.3.3.0-2), 127 (3.4.5.0-2)

CM Note: GXI Instrument is awarded, contract numbers are added, and signature page is updated to version 2.0.

CCR GeoXO#-X00039 Rev: A Title: GXIUIID: Midway update for Phase A Contract # GXI- 80GSFC21C0061 GeoXO S/C: GeoXO Effectivity: Instruments

GXI - 80GSFC21C0062

CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 01/18/2022 Doc Version: 2.1 Contract Mod#: P0006 DOORs Version: 2.1 Doc Change Date: Jan. 27, 2022 DOORs ID #: Modify: GXIUIID36 (3.1.4.0-1), 39 (3.2.1.0-1), 64 (3.4), 72 (3.4.2.0-3), 75

(3.4.3.0-1), 77 (3.4.3.0-3), 92 (3.4.5.0-1), 95 (3.4.6.0-1), 97 (3.4.6.0-3), 112 (6.1.0-1), 121 (6.2.0-6), 127 (3.4.5.0-2), 45 (3.2.4.0-1), 54 (3.3.3.0-1), 59 (3.3.5.0-1), 67 (3.4.1.0-1), 70 (3.4.2.0-1), 92 (3.4.5.0-1), 125 (3.3.5.0-2)

Add: GXIUIID128 (3.4.7), 132 (3.4.7.0-1), 129 (3.3.6), 130 (3.3.6.0-1), 131 (3.3.6.0-2)

CCR GeoXO#-X00072 Rev: A Title: GXIUIID: Update for Implementation Phase Contract # GXI- Phase B GeoXO S/C: GeoXO Effectivity: None CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 5/20/2022 Doc Version: 2.2 Contract Mod#: N/A DOORs Version: 2.2 Doc Change Date: June 01, 2022 DOORs ID #: Modify: GXIUIID2 (1.0-1), 4 (1.0-3), 9 (1.1.0-1), 12 (1.2.0-2), 13 (1.2.0-2), 14 (1.2.0-2), 15 (1.2.0-5), 18 (1.2.0-6), 24 (2.), 25 (2.1), 27 (3.0-1), 30 (3.1.1.0-1), 35 (3.1.4), 36 (3.1.4.0-1), 54 (3.3.3.0-1), 121 (6.2.0-6), 124 (7.0-1), 126 (3.3.3.0-2)

Delete: GXIUIID16, 17, 19, 20, 21, Add: GXIUIID133 (2.2), 134 (2.1.0-1), 135 (2.2.0-1), CMO Note: CCR-X0072 changes is for Phase B - implementation; bypassed the "Contract Negotiation'. Phase A is completed, these changes are for phase B;

CCR GeoXO#-X00079 Rev: Title: GXIUIID: Remove TBRs for Implementation Phase Contract # GXI- Phase B GeoXO S/C: GeoXO Effectivity: None CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 06/01/2022 Doc Version: 2.2 Contract Mod#: N/A DOORs Version: 2.2 Doc Change Date: June 01, 2022 DOORs ID #: Modify: GXIUIID49 (3.3.1.0-1), 59 (3.3.5.0-1)

CMO Note: CCR0079 changes is for Phase B - implementation; bypassed the "Contract Negotiation'. Phase A is completed, these changes are for phase B;

Effective Date: March 23, 2023 418-XO-GXIUIID-0023

To verify the correct version of this document, please contact the GeoXO Series Configuration Management

CCR GeoXO-X00114 Rev: Title: GXIUIID: Updates from draft RFP comments Contract # GXI- Phase B GeoXO S/C: GeoXO Effectivity: None CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 08/11/2022 Doc Version: 2.3 Contract Mod#: N/A DOORs Version: 2.3 Doc Change Date: Aug. 11, 2022 DOORs ID #: Modify: GXIUIID5 (1.0-4), 75 (3.4.3.0-1), 77 (3.4.3.0-2)

CCR GeoXO-X00167 Rev: Title: GXIUIID: Updates for Start of Implementation Phase Contract # GXI- Phase B GeoXO S/C: GeoXO Effectivity: None CCB Status: Approved Doc #: 418-XO-GXIUIID-0023 CCB Date: 04/12/2023 Doc Version: 2.4 Contract Mod#: GXI: 2; SC: 10, 11 DOORs Version: 2.4 Doc Change Date: July 31, 2023 DOORs ID #: Modify: GXIUIID121 (6.2.0-6) Modify: GXIUIID101 (3.6), 102 (3.6.0-1), 103 (3.6.0-2), 111 (6.1), 112 (6.1.0-1), 114 (6.1.0-2) [replaced original text with “Reserved”; DI retained for potential future use];