Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains clarifications and answers to questions pertaining to solicitation number 80GSFC23R0010, the GeoXO Spacecraft DRAFT Request for Proposal for Phase B Implementation Procurement issued by the National Aeronautics and Space Administration Goddard Space Center. The clarifications relate to requirements in attachments C, H, and C of the solicitation. Specifically, clarification number one relates to requirement SCFPS161 in attachment C regarding maintaining and monitoring battery health when the spacecraft cannot be powered. Clarification number two relates to requirement SCMAR42 in attachment H concerning the inherited risk assessment process for EEE parts. Clarification number three relates to requirement SCFPS282 in attachment C requiring positive indication of stowed mechanism position on orbit and during ground testing due to the Class B risk classification of the GeoXO project. The answers reduce the minimum threshold for relevant past performance from $250 million to $150 million, clarify the definition figures in attachment C, and confirm provisions in GEVS section 2.4.1.4.1.d.1 may be followed to demonstrate compliance for metal-metal and metal-nonmetal bonds.

View the file

Other files for this federal contract opportunity

Other files attached to GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement, newest first.
File Type Posted
GeoXO Spacecraft Question and Answer Set 2.pdf PDF
GeoXO SC Question and Answer EXCEL Sheet.pdf PDF
GPR 7120.4D Adm Ext_010623.pdf PDF
Addendum 2.pdf PDF
GPR 7120.7B Admin Ext 08.09.2023.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment F-6 418-XO-PTRUIID-0141_V_0_12_DRAFT.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V1_1_DRAFT.pdf PDF
Updated J.1.pdf PDF
8.16.23 Final Draft GeoXO Spacecraft Implementation Phase B Procurement.pdf PDF
Exhibit 7C Total Subcontracting Goals.pdf PDF
Attachment D- 418-XO-GIRD-0041_V_2_4_Draft.pdf PDF
Attachment E- 418-XO-PRAD-0037_V_1_4_DRAFT.pdf PDF
Attachment K-418-XO-RPT-0045 FPGA final v1.0 08112022.pdf PDF
Attachment M RESERVED.pdf PDF
Attachment O-GeoXO SC Engineering Units Prototype Units and Risks_MPR.pdf PDF
Attachment P_TAM Table.pdf PDF
Attachment Q MEL.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment Z IT Security Applicable Documents List.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Attachment AC-List of Government Furnished Property.pdf PDF
Enclosure 1 GeoXO SC Draft PEP June 2023F.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Exhibit 7 Sm Buisness Subcontracting Plan Goals.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_3_final.pdf PDF
Attachment F-1 418-XO-GXIUIID-0023_V_2_4.pdf PDF
Attachment F-4 418-XO-OCXUIID-0062_V_1_6.pdf PDF
Attachment H- 418-XO-SCMAR-0083_V_1_0.pdf PDF
GeoXO Spacecraft DRFP Cover Letter F .pdf PDF
Draft Exhibit 8 - PPQ_8.9.23_MPR.pdf PDF
Attachment A- 418-XO-SCSOW-0122_Draft Final.pdf PDF
Attachment F-2 418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment F-3 418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-5 418-XO-ACXUIID-0072_V_1_5.pdf PDF
Attachment F-6 418-XO-PPXUIID-0141_V_0_2_DRAFT.pdf PDF
Attachment G-1 418-XO-IRD-0044 DCSIRD V1_3.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2.pdf PDF
Attachment J-418-XO-RPT-0039-V-1-0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 7-13.pdf PDF
Attachment R-Link Budget with Formulas and Instructions_rev4_full.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
DRFP GeoXO Spacecraft Cost Exhibits 1-7 July 2023.pdf PDF
Exhibit 7B Sub Goals Option Periods.pdf PDF
Show all 50

GeoXO Spacecraft DRAFT Request for Proposal (DRFP) Phase B Implementation Procurement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GeoXO Spacecraft DRFP Questions and Answers Set #3 and Clarifications

Question #1-Pertaining to Solicitation Section L.14

Paragraph states relevant past performance is for efforts with a “minimum annual cost/fee incurred of $250,000,000”

Can “annual” be removed as a qualifier? This would make it consistent with Section M.5

Can minimum threshold be reduced to $50,000,000?

Answer #1-

The clause at L.14, GSFC 52.215-230 PAST PERFORMANCE VOLUME (MAR 2020) was the incorrect clause. This will be corrected in the final RFP. The correct clause does not contain the word “annual”.

The minimum threshold cannot be reduced to $50,000,000 however, the Government will lower the minimum threshold to $150,000,000.

Question #2-Pertaining to Solicitation Section M.5

Paragraph states relevant past performance is for efforts with that will meet/exceed a “total cost/fee of $250,000,000”

Can minimum threshold be reduced to $50,000,000

Answer #2-

See Answer #1

Question #3- Pertaining to Attachment C -SCFPS712

Can the previous Figure SCFPS712 that was in the Phase A documentation remain a valid reference figure to correspond to the definitions provided in SCFPS714 & SCFPS715

Answer #3-

No – utilize the current figure in SCFPS712. The SCFPS is in process of being updated to add a requirement that corresponds to the “Qualification (prototype)” testing shown in the figure. Definitions for protoflight, prototype and qualification are in the Spacecraft Statement of

Work (SOW). The GeoI1 and GeoS1 spacecraft are required to be protoflight units.

Question #4-Pertaining to: Attachment C-SCFPS665-Primary and secondary structures fabricated from nonmetallic composites, beryllium, or containing bonded joints or bonded inserts shall be proof tested in accordance with Section 2.4.1.4.1 of GSFC-STD-7000B [20].

Seeking to verify that NASA will allow for the utilization of GEVS GSFC-STD-7000B, section

2.4.1.4.1.d.1 as a path to compliance for metal-metal & metal-nonmetal bonds?

From GEVS 2.4.1.4.1.d.1:

“... As a minimum, at least one of each type of bonded joint in the flight article shall be tested to

1.25 times the maximum predicted limit load for that joint type. The remainder of the bonded joints may then be considered to be qualified by similarity.”

Answer #4-

As stated per GEVs, the preferred approach is proof test each joint. However, in cases where proof testing individual joints is not necessary, provisions in 2.4.1.4.1.d.1 may be followed. Provisions #2 and #3 must also be followed. It is the responsibility of the Contractor to demonstrate to the Government why it is not necessary to test each individual joint.

Clarifications

#1-Clarifying requirement SCFPS161 in Attachment C

This requirement allows for maintaining and monitoring battery health when the spacecraft is in a condition where it cannot be powered (e.g. working an issue with other spacecraft hardware.)

Please note that the Government considers the battery to be discharging even when the spacecraft is powered off.

#2- Clarifying requirement SCMAR42 in Attachment H

EEE parts for components, assemblies and/or subsystems that are accepted by the Government for the Inherited Items Risk Assessment Process do NOT need to go through the EPCB approval process unless a risk for a EEE part has been identified.

The Government reserves the right to accept or reject components, assemblies and/or subsystems for the Inherited Risk Assessment Process based on the extent of the heritage, need date of the risk assessments and government resources available to perform the assessments.

#3-Clarifiying requirement SCFPS282 in Attachment C.

Due to the Class B risk classification, the GeoXO project requires positive indication of mechanism stowed /caged position on orbit as well as during ground testing.

File details come from the government source that posted it. Updated .