GC Services for the Bricker USBC Backfill Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
47PF0022R0038
Agency
Region 5 Public Buildings Service, General Services Administration
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
Columbus, Ohio 43215, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Contract Opportunity involves the amendment of a solicitation or modification of a contract. The contractor is required to acknowledge receipt of the amendment and may change an offer already submitted by letter or electronic communication. The amendment incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date. The due date for proposals remains July 21, 2023.

Services to be provided by the contractor:

  1. Acknowledge receipt of the amendment.
  2. Possibly change an offer already submitted.
  3. Complete items 8 and 15.
  4. Return copies of the document to the issuing office.
  5. Submit proposals by the due date.

Notice text

7 versions

Update #7 · Latest ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Amendment 0001 - This Amendment is issued on 6/29/2023; it incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date.

Amendment 0002 - This amendment hereby extends the due date for proposals to August 09, 2023, no later than 4:00pm Eastern Time.

Amendment 0003 - This amendment hereby incorporates a portion of the received RFIs to date, as well as extends the due date for RFIs to Wednesday, July 19, 2023, no later than 4:00pm Eastern Time. This amendment also incorporates FAR 52.204-27 Prohibiliton on a ByteDance Covered Application. 

Amendment 0004 - This amendment hereby extends the due date for RFIs  to Wednesday, July 26, 2023, no later than 4:00pm Eastern Time. 

Amendment 0005 - This amendment hereby incorporates a portion of answered RFIs received as of 7/26/2023. The remaining RFIs will be incorporated via a later amendment. This amendment also incoproates as REVISED Supplemental 1442 pricing sheet, as well as the 2006 environmental building assessment. 

Amendment 0006 - This amendment hereby incorporates the final balance of RFIs received. This also incorporates a revised Supplemental 1442 Pricing Sheet which increases the Allowance 2 amount, and removes the “1h Environmental - ACM” line item mistakenly left on the previously revised Supplemental 1442 Pricing Sheet.

Update #6 ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Amendment 0001 - This Amendment is issued on 6/29/2023; it incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date.

Amendment 0002 - This amendment hereby extends the due date for proposals to August 09, 2023, no later than 4:00pm Eastern Time.

Amendment 0003 - This amendment hereby incorporates a portion of the received RFIs to date, as well as extends the due date for RFIs to Wednesday, July 19, 2023, no later than 4:00pm Eastern Time. This amendment also incorporates FAR 52.204-27 Prohibiliton on a ByteDance Covered Application. 

Amendment 0004 - This amendment hereby extends the due date for RFIs  to Wednesday, July 26, 2023, no later than 4:00pm Eastern Time. 

Amendment 0005 - This amendment hereby incorporates a portion of answered RFIs received as of 7/26/2023. The remaining RFIs will be incorporated via a later amendment. This amendment also incoproates as REVISED Supplemental 1442 pricing sheet, as well as the 2006 environmental building assessment. 

Update #5 ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Amendment 0001 - This Amendment is issued on 6/29/2023; it incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date.

Amendment 0002 - This amendment hereby extends the due date for proposals to August 09, 2023, no later than 4:00pm Eastern Time.

Amendment 0003 - This amendment hereby incorporates a portion of the received RFIs to date, as well as extends the due date for RFIs to Wednesday, July 19, 2023, no later than 4:00pm Eastern Time. This amendment also incorporates FAR 52.204-27 Prohibiliton on a ByteDance Covered Application. 

Amendment 0004 - This hereby extends the due date for RFIs  to Wednesday, July 26, 2023, no later than 4:00pm Eastern Time. 

Update #4 ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Amendment 0001 - This Amendment is issued on 6/29/2023; it incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date.

Amendment 0002 - This amendment hereby extends the due date for proposals to August 09, 2023, no later than 4:00pm Eastern Time.

Amendment 0003 - This amendment hereby incorporates a portion of the received RFIs to date, as well as extends the due date for RFIs to Wednesday, July 19, 2023, no later than 4:00pm Eastern Time. This amendment also incorporates FAR 52.204-27 Prohibiliton on a ByteDance Covered Application. 

Update #3 ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Amendment 0001 - This Amendment is issued on 6/29/2023; it incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date.

Amendment 0002 - This amendment hereby extends the due date for proposals to August 09, 2023, no later than 4:00pm Eastern Time.

Update #2 ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Amendment 0001 - This Amendment is issued on 6/29/2023; it incorporates the PreProposal Conference Agenda and Sign-In Sheet, as well as the RFIs received to date.

Update #1 ·

The General Services Administration, Great Lakes Region 5, announces an opportunity to provide General Construction Services for the Bricker USBC Backfill project at the John W. Bricker Federal Building in Columbus, OH.

The General Construction Contractor (GC) will be solicited for full and open competition, competitively chosen using source selection (FAR 15.3) procedures. The objective of the source selection process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and total evaluated price. For this procurement, the technical factors will be more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing General Construction Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; and Past Performance in providing General Construction Services on similar projects.

The Government reserves the right to make an award on initial offers, but discussions may be held if appropriate. The estimated total construction costs for the project falls within the approximate range of $10,000,000.00 to $20,000,000.00. The award of the contract is anticipated to be made, approximately, in December 2023. The Notice to Proceed for Construction is anticipated to be issued in February 2024, with a performance period of approximately 533 calendar days for the project.

The General Services Administration (GSA) intends to award a firm fixed-price construction contract to consolidate the Judiciary's U.S. Bankruptcy Court (USBC) and the Department of Justice-U.S. Marshals Service (USMS) from over 51,000 usable square feet (USF) of leased space to approximately 26,000 USF in the John W. Bricker Federal Building (Bricker FB). The project will meet the long-term housing needs of the USBC, decrease the Federal Government’s reliance on leased space, reduce federally owned vacant space, and improve space utilization in the Bricker FB. The project will create two USBC courtrooms, three chambers, clerk space, support spaces, and a new USMS Court Security Office. 

The construction of this consolidation on each identified floor will be occurring in an occupied building which must maintain full functionality, which includes typical office work, but also includes services for the general public. This presents several challenges which will have to be addressed by the AE and GC teams.

  • All work in functional (i.e. occupied) public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. 
  • Work must be performed in such a way that space conditioning and all utility are maintained throughout construction. Temporary / contingency HVAC/R, electrical, life safety and water systems may be required. Any shutdown of a building system will need to be completed after business hours or on the weekends and put back into service prior to the next business day. This will be the responsibility of the GC.
  • Egress and access to the Bricker must be maintained for the employees and visitors during the course of the consolidation. 

The NAICS code for this procurement is 236220. 

The GC shall be a member of the project team throughout construction. The GC selected for this project shall work along with the GSA and GSA’s selected Architect and Engineer (A/E) firm and Construction Manager as Advisor/Commissioning Agent (CMa/CxA). The GC shall furnish all labor, materials and other related services necessary to perform interior construction; demolition/hazardous materials abatement; heating, ventilation, air conditioning (HVAC) upgrades, electrical upgrades, and plumbing upgrades in accordance with the complete design documents.

Join Ventures: Join venture or firm/consultant arrangements will be considered and must submit an acceptable joint venture agreement.

The solicitation package will be available on 6/21/2023. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the System for Award management site, www.sam.gov, and for monitoring possible amendments and/or additional information.

A pre-proposal conference and site visit will be held in Columbus, OH on Thursday, June 29, 2023 at 1:00pm Eastern Time.  A link to the Pre-Proposal registration form will be included in the solicitation posting, and anyone interested in attending the pre-proposal conference shall complete the form and submit it no later than 12:00pm Eastern Time on Wednesday, June 28, 2023. Please note, the number of people attending will be limited to four individuals per company/team. We consider attendance at this conference vital to the preparation of a competitive and  cost effective proposal and to understand the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. The offers will be due on 7/21/2023, no later than 4:00pm Eastern Time.

All responsible sources may submit a bid/proposals which shall be considered by the agency. In order to be eligible for award, offerors are required to provide electronic representations and certifications in the System for Award Management (SAM), which can be accessed at: https://www.sam.gov. An award is anticipated on or about December 20, 2023. 

Any questions regarding this notification should be directed to the Contracting Officer Anna Vanko at anna.vanko@gsa.gov.

Attachments

Files attached to this notice, newest first
File Type Posted
Amend 0006 RFP47PF0022R0038 SF30.pdf PDF
Amend 0006 47PF0022R0038 RFIs.pdf PDF
REVISED_Bricker Supplemental 1442 8 2 2023.pdf PDF
OH0208CL - Bricker FB - Phase I Environmental Site Assessment 2006.pdf PDF
Amend 0005 RFP47PF0022R0038 SF30.pdf PDF
Amend 0005 47PF0022R0038 RFIs.pdf PDF
REVISED_Bricker Supplemental 1442 Pricing Sheet.pdf PDF
Amend 0003 RFP47PF0022R0038 SF30.pdf PDF
Amend 0003 47PF0022R0038 RFIs.pdf PDF
Amend 0004 RFP47PF0022R0038 SF30.pdf PDF
Amend 0003 RFP47PF0022R0038 SF30.pdf PDF
Amend 0003 47PF0022R0038 RFIs.pdf PDF
Amend 0002 RFP47PF0022R0038 SF30.pdf PDF
Amend 0001 RFP47PF0022R0038 RFIs.pdf PDF
47PF0022R0038 PreProposal sign In Sheet.pdf PDF
Bricker USBC GC PreProposal Agenda.pdf PDF
Amend 0001 RFP47PF0022R0038 SF30.pdf PDF
Spec_Bricker_CD_95.pdf PDF
RFP47PF0022R0038 SF1442.pdf PDF
SF24-16e (4).pdf PDF
47PF0022R0038 GC_Solicitation_March_2023 (2).pdf PDF
47PF0022R0038 GC Reps and Certs March 2023 (1).pdf PDF
Supplemental Pricing Sheet.pdf PDF
Individual Model_Subk_Plan - Jan 2023 - Final_508.docx DOCX document
OH0000CL_Bricker Federal Building Parking Facility Asbestos Notification Letter.pdf PDF
Compiled_Bricker_CD_95.pdf PDF
GSA527-21.pdf PDF
Past Performance Questionnaire.docx DOCX document
Bricker Supplemental 1442 Pricing Sheet.pdf PDF
Bricker Backfill - GSA Pricing Guidance Table Rev05 w.CT edits.comments V3.xlsx XLSX spreadsheet
PreProposal Conference Registration.pdf PDF
OH20230078 04 14 2023.pdf PDF
Supplemental Docs_Bricker_CD_95.pdf PDF
47PF0022R0038 GC_Agreement_March_2023 (1).pdf PDF
Show all 34

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GC Services for the Bricker USBC Backfill Project Award Award Notice
GC Services for the Bricker USBC Backfill Project This notice · Latest solicitation Solicitation
GC Services for the Bricker USBC Backfill Project Pre-Solicitation
GC Services for the Bricker Backfill Project Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity