Supplemental Docs_Bricker_CD_95.pdf
PDF 4 MB Posted
- Attached to
- GC Services for the Bricker USBC Backfill Project Federal contract opportunity
- Solicitation number
- 47PF0022R0038
About this file
This document provides design development details for fire protection and life safety systems for the Bricker USBC Backfill Project. The project involves renovations to an existing seven-story Type 1B government building. Key details include evaluating egress capacity for new occupant loads, modifying the existing fire sprinkler and alarm systems, and addressing options for enclosing one of the building's open stairwells. Fire protection responsibilities, applicable codes and standards, occupancy classifications, means of egress requirements, and other general design requirements are outlined. The related federal contract opportunity is solicitation number 47PF0022R0038 for general construction services supporting the Bricker USBC Backfill Project, to be awarded by the General Services Administration Public Buildings Service Region 5.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bricker USCH: Design Development
CHAPTER 7: FIRE PROTECTION AND LIFE SAFETY JENSEN HUGHES
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-1
CHAPTER 7: FIRE PROTECTION & LIFE
SAFETY
7.1 Goals and Objectives
As the Fire Protection Engineer (FPE) on this project, Jensen Hughes will provide fire protection and life safety related code consulting to the project team. Additionally, we will serve as the Engineer of Record in the design of fire suppression, fire alarm and notification systems. In this role, JENSEN HUGHES will act as an advisor to the design team on internationally recognized codes and standards as well as pertinent GSA specific code requirements.
We have developed the following project code compliance approach:
● Establish fire and life safety objectives that are acceptable to the GSA and tenant agencies and are consistent with international design practices for similar buildings.
● Based on the established fire and life safety objectives, prepare a fire protection and life safety program that identifies the building features and systems to be incorporated into the design.
● Identify and resolve fire protection and life safety related code compliance issues by discussion with the GSA and coordination with the design team.
7.1.1 Responsibilities
As the FPE on the project team, we are required to be a full participant of the design team for each phase of the project from concept through design, construction, and occupancy. The FPE will perform the following.
Analysis of:
● Building construction (Existing)
● Occupancy classification
● Means of egress
● Fire alarm system
● Water-based fire extinguishing system(s)
Calculations for:
● Egress (Modifications to existing infrastructure)
● Water supply (Existing)
Design of all fire protection and life safety systems, including, but not limited to:
● Fire alarm system
● Water-based fire extinguishing system(s)
We will also establish and maintain a dialog with the GSA regional fire protection engineer to address fire
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-2 protection and life safety issues throughout each phase of the project.
7.2 References - Applicable Codes and Standards
The following codes and standards will be used as the basis of fire and life safety design criteria on this project:
1. PBS-P100 – Facilities Standards for the Public Buildings Service, July 2018
2. International Building Code (IBC) 2021
3. International Fire Code (IFC) 2021
4. NFPA 101-2021, Life Safety Code (LSC) [for technical egress only]
5. NFPA 13-2019, Installation of Sprinkler Systems
6. NFPA 14-2019, Installation of Standpipe and Hose Systems
7. NFPA 20-2019, Installation of Stationary Pumps for Fire Protection
8. NFPA 25-2020, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
9. NFPA 70-2020, National Electrical Code
10. NFPA 72-2019, National Fire Alarm and Signaling Code
If a conflict exists between GSA requirements and the GSA-adopted codes or standards, the GSA requirements take precedence. All such conflicts will be brought to the attention of the GSA project manager as appropriate for resolution.
7.3 General Design Requirements
The Bricker U.S. Building (USCH) is an existing 7 story building with a basement. The work included on this project will not change or impact the existing building construction type, height, area, allowable occupancy types, or primary egress infrastructure. These items are deemed existing to remain and compliant. The design requirements for this project consist of evaluating the new build out design for compliance with overall floor occupant loading in comparison to the available egress capacity, new work egress compliance, existing fire sprinkler system modifications, and existing fire alarm system modifications.
7.3.1 Building Construction
The existing seven-story Bricker USCH is reportedly at least a type 1B construction with a compliant overall building height and area. The new spaces will not changes the allowable occupancy types within the building. Upon completion of this project, Bricker USCH will remain a fully sprinkler protected building.
7.3.2 Occupancy Classifications
The following are the occupancy classifications in the Bricker Building:
● Group B Business – Includes Office Areas
● Group A-3 Assembly – Includes courtrooms, jury commission, library, and large lounges
● Group S-1 Moderate Hazard Storage – Includes storage rooms; secondary use group separated
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-3 from the main use groups
● Group S-2 Low Hazard Storage – Includes underground parking area; secondary use group separated from the main use groups
Bricker Type IB Construction
Use Allowable Height Allowable Stories Allowable Area (w/o Frontage)
A-3 180’ 12 UL
B 180’ 12 UL
S-1 180’ 12 144,000
S-2 180’ 12 237,000
7.3.3 Occupancy Separations
The building is identified as non-separated mixed use building.
7.3.4 Shaft Enclosures
Shafts enclosures having a 2-hour fire resistance rating are required where floor openings connect four or more stories and may have a 1-hour fire resistance rating when connecting less than four stories.
Per IBC Section 712.1.12 and 1009.3 exception 4, unenclosed stairs connecting not more than 4 stories are permitted when the floor opening between stories does not exceed twice the horizontal projected area of the stairway and the opening is protected by a draft curtain and closely spaced sprinklers per NFPA 13.
One of the two exit stairways in the existing Bricker USCH includes an open stairway interconnecting the 1st through 4th floors. At a minimum, two enclosed exits should be provided for each story of this building. If this is a historic feature of the building, options other than a fire rated enclosure may be acceptable to the GSA.
Outstanding Item: Review options for enclosure of the open stairway in the Bricker USCH and options to remain unenclosed.
7.3.5 Special Separations
Elevator lobbies are existing and to be maintained as smoke resistive.
7.4 Means of Egress
The means of egress for the building will be designed to Chapter 7 of NFPA 101-2021 edition.
Below is a summary table of the applicable requirements where the building is protected throughout with
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-4 an automatic sprinkler system.
Egress Component Requirement
Stairs (inches per occupant) 0.30
Doors, Ramps, Corridors (inches per occupant) 0.20
Travel Distance (feet) Assembly Business Institutional Storage
Dead End Corridor (feet) Assembly Business
Common Path of Travel (feet) Assembly (>50p) Assembly (<50p) Business
The required minimum number of exits according to occupant load:
● 50 - 500 = 2 exits
● 501 - 1000 = 3 exits
● More than 1000 = 4 exits
Single Exit permitted if compliance with the common path of travel distance limits are met for all occupancies other than assembly. (NFPA 101 7.4.1.1, 7.4.1.2)
In sprinklered buildings, exits and exit access doors must be separated by a distance not less than 1/3 of the maximum overall diagonal dimension of the building or area served (7.5.1.3.3).
NFPA 101 Section 22.2.6.2 specifies that for detention and correctional facilities, the travel distance between any room door required as exit access and an exit can’t exceed 150 feet.
7.4.1 Occupant Load Factors
The following occupant load factors will be used to determine the number of calculated occupants in each area of building. The factors below are a combination of PBS-P100 and NFPA 101 factors.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-5
MEANS OF EGRESS NFPA 101-2021
Occupant Load Table 7.3.1.2
Business (other than concentrated) 150 gsf/p
Business (concentrated) 50 gsf/p
Assembly Areas
Collaboration Room/Space (< 450 ft2) 30 gsf/p
Collaboration Room/Space (> 450 ft2) 15 nsf/p
Break Room (< 450 ft2) 30 gsf/p
Break Room (> 450 ft2) 15 nsf/p
Pantry Area (< 450 ft2) 30 gsf/p
Pantry Area (> 450 ft2) 15 nsf/p
Conference Room (any size) 15 nsf/p
Meeting Room (any size) 15 nsf/p
Training Room (any size) 15 nsf/p
Bench Seating 1p/18 linear in.
Concentrated (chairs only, not fixed) 7 nsf/p
Unconcentrated, (tables and chairs) 15 nsf/p
Exercise areas w/o equipment 15 gsf/p
Exercise areas w/equipment 50 gsf/p
Locker rooms (excl. lockers) Bench-type seating:
1p/18 linear inch
Stages and Platforms 15 nsf/p
Kitchen areas 100 gsf/p
Parking garages 500 gsf/p
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-6
Detention Areas 120 gsf/p
Mercantile
Basements and first floor 30 gsf/p
Sales area on two or more street floors 40 gsf/p
Other floors 60 gsf/p
Storage, stock, shipping areas 500 gsf/p
Currently, adequate number and capacity of exits is provided from each floor of Bricker Building. On the court’s floors, the areas outside the courtroom are being treated as non-simultaneous use with the courtrooms themselves.
7.4.2 Minimum Widths
Exit Doors 32 in. min clear width (7.2.1.2.3.2)
Doors serving rooms less than 70 ft² and not required to be accessible to persons with mobility impairments must be not less than 24 in.
(7.2.1.2.3.2)
Stairs Total occupant load of all stories served by the stair:
<50 persons: (36 in.) minimum <2000 persons: (44 in.) minimum
≥2000 persons: (56 in.) minimum
(7.2.2.2.1.2)
Corridors 36 in. minimum (7.3.4.1)
Assembly/Hotel/Business:
Min width must be determined as specified 'Exit Capacity' but must not be less than 44 inches more than 50 occupants. (12.2.3.8/28.2.3.3/38.2.3.2)
Landings The width of the landing must match the width of the stairway with a minimum dimension equal to the width of the stairwell in the direction of travel. Such dimension does not need to exceed 48 in. where stairway has a straight run. (7.2.2.3.2)
Minimum Headroom Minimum 7'-6". At least 6'-8" above the finished floor for projections from the ceiling. (7.1.5.1)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Page 07-7
On Stairs: Minimum 6'-8", measured vertically above a plane parallel to and tangent with the most forward projection of the stair tread. (7.1.5.3)
Rooms/Spaces: 7'-6" to be maintained for at least two-thirds of the ceiling area of any room or space.
The remaining ceiling area requires to have a ceiling height of not less than 6'-8". (7.1.5.2)
Door Swing and Encroachment All doors serving 50 or more persons, or in an exit enclosure, or serving a high hazard contents area to swing in the direction of egress travel. (7.2.1.4.2)
Doors opening onto path of egress or landings must not reduce the required width to less than one-half at any time and must not project more than 7 in. into the required width when fully open. (7.2.1.4.3)
Panic Hardware Requirements When panic hardware is required per occupancy type it must follow Section 7.2.1.7.
Panic hardware required when assembly space serving 100 or more is provided with a latch or lock.
(12.2.2.2.3)
Stair Tread and Riser Dimensions Max. Riser = 7 inches Min. Riser=4 inches Min. Tread = 11 inches (7.2.2.2.1)
Scissor Stairs Interlocking or new scissor stairs must be permitted to consider only as a single exit. (7.5.1.4)
Height Between Landings 12-feet (Table 7.2.2.2.1.1(a))
7.4.3 Exit Discharge
Final Exit Discharge Exits must terminate directly at a public way or at an exterior exit discharge. See exception below 'Exiting Through a Lobby'.
(7.7.1)
Exit discharge components are existing approved components and will be maintained by this project.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-8
Exiting Through a Lobby Not more than 50% of the required number and capacity of exits are permitted to discharge through areas on the level of exit discharge, provided that:
- A free and unobstructed way is readily visible and identifiable from the point of discharge from the exit;
- The entire area on the level of discharge must be separated from areas below by construction having a fire resistance rating not less than that required for the exit enclosure, except the atrium complying with 8.6.7;
- The level of discharge is fully sprinklered, or the portion of the level of discharge used for discharge is sprinklered and is separated from the non-sprinklered portion by a fire resistance rating meeting the exit enclosure requirements. Discharge through a vestibule or foyer complying with 7.7.2 (4) is exempted from this requirement.
(7.7.2)
Access to a Public Way Exits must terminate directly at a public way or at an exterior exit discharge with direct access to a public way. (7.7.1)
Separation of Stairs Leading to
Above Grade Floors from Stairs
Leading to Basements
Stairs that continue more than one-half story beyond the level of exit discharge must be interrupted at the level of exit discharge by partitions, doors, or other effective means.
(7.7.3)
7.4.4 Areas of Refuge
Areas of refuge in stairwells are not required in stairways of fully sprinkler protected buildings (7.2.12.1).
However, a two-way voice system is required to be provided at passenger elevators on landings above and below the level of exit discharge. This will not be provided for the existing stairwells and elevator lobbies as part of this project.
7.4.5 Exit Lighting and Signage
Exit Lighting Means of egress, including exit discharge must be illuminated continuously during the time the conditions of occupancy require it. (7.8.1.3)
Illumination level must not be less than 1 foot-candle (10 Lux) at the floor level
(7.8.1.3 (2)) and not less than 10 foot-candles for stairs. (7.8.1.3 (1))
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-9
Exit Signs Exit and exit access doors must be marked by an approved exit sign readily visible from any direction of egress travel.
(7.10.1.2.1)
Tactile exit signs required adjacent to each door to an egress stairway.
(7.10.1.3)
Horizontal components of the egress path within an exit enclosure must be marked where the continuation of the egress path is not obvious. (7.10.1.2.2)
Exit signs must be energy efficient and environmentally friendly products (e.g., light emitting diodes (LED type), photoluminescent type. Tritium exit signs shall not be installed.
Emergency
Lighting/Illumination
In the event of power supply failure, an emergency electrical system must automatically illuminate the means of egress for the following locations for a duration of not less than 90 minutes:
(1) Exits;
(2) Designated stairs, aisles, corridors, ramps, escalators, and passageways leading to an exit;
(3) Designated stairs, ramps, aisles, walkways, and escalators leading to a public way.
(7.9.1.1, 7.9.1.2, 7.9.2.1,7.2.2.5.5.10)
Provide initial illumination of not less than an average of 1 ft-candle (10.8 Lux) and minimum 0.1 ft-candle (1.1 Lux) at any point, measured along the path of egress at floor level. At the end of 90 minutes, provide not less than an average of 0.6 ft-candle (6.5 Lux) and not less than 0.06 ft-candle (0.65 Lux) at any point. The maximum-to-minimum illumination uniformity ratio cannot exceed 40 to 1.
(7.9.2.1)
7.5 Interior Finishes
Per IBC Table 803.9, interior finishes permitted for the subject building are as follows:
Group Exit Enclosures and Exit Passageways
Corridors Rooms and Enclosed Spaces
A-2 and A-
A or B A or B A, B, or C
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-10
B A or B A, B, or C A, B, or C
S A, B, or C A, B, or C A, B, or C
Where:
Class Flame Spread Index
Smoke Developed
Index
A 0-25 0-450
B 26-75 0-450
C 76-200 0-450
See Section 603.1 of the IBC for more details regarding the use of combustible materials in building of Type I construction.
7.6 Fire Alarm and Emergency Communication
Systems
The building has an existing Siemens single hardwired, addressable fire alarm and emergency communication system to serve the Bricker Building. The installed fire alarm system present within the Bricker Building is no longer supported by the manufacturer and equipment and the system has reached the end of its useful life and the technology is changing. Fire alarm systems main components for the existing system are typically required to be second hand or aftermarket parts due to the systems age and parts are no longer manufactured for this model of system. We are aware of another GSA project that is scoped to upgrade the fire alarm system to meet the updated codes and GSA standards. It is our understanding that the existing fire alarm system, in its current state, is not able to be modified to incorporate the extensive changes needed for this project. This project shall either anticipated the upgrade of the existing fire alarm system being completed prior to the start of construction for this project as a baseline for our design documents or the fire alarm upgrade shall be incorporated into the first phase of this project. The system will be modified, designed, and installed in accordance with the requirements in NFPA 72, the IBC, GSA PBS P-100, and the GSA fire alarm system specification Section 283101 requirements for new systems. The fire alarm and emergency communication systems is a self-contained, standalone system that functions independently of other building systems. The emergency communication system will provide an automatic voice message in response to the receipt of a signal indicative of a fire emergency. Manual control with the capability of making live voice announcements will also be furnished to provide occupants notification on either a selective or all-call basis. A firefighters emergency communications system is installed in the building and will be modified as needed for this project to maintain its current level of operation. The fire alarm, emergency communication system, and
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-11 firefighter’s emergency communication system control equipment is located on the first floor of the building within the separated control room in the first-floor lobby space. All new fire alarm and emergency communication system power supplies will be supplied with power provided by conditioned power from the emergency power circuits. Secondary power supplies (batteries) will be rated at 150% of the requirements specified by the NFPA 72.
Drawings delineating areas to be classified as Preservation zones with historic finishes will be referenced when coordinating pathways, fire alarm appliances and devices.
All fire alarm signals (i.e., alarm, supervisory, and trouble signals) are automatically transmitted to a supervising station. The communication methods used to transmit signals to the supervising station meet the GSA’s requirements for existing systems. All new fire alarm wiring will be solid copper and installed in conduit. Conduit systems will be rigid metal or electrical metallic tubing, with a minimum inside diameter of 19 mm (3/4 inch) that utilizes compression type fittings and couplings.
The existing fire alarm system in the building will remain fully operational while areas are being renovated. The old fire alarm equipment in renovation areas will be supported and remain operational.
The new fire alarm equipment will be installed and tested but be tagged “NOT IN SERVICE” until the new fire alarm equipment is accepted by the government, then the tags on the new equipment will be removed and tags will be placed on the old fire alarm equipment and will be removed.
7.6.1 Manual Fire Alarm Boxes
Manual fire alarm boxes will be installed in accordance with the requirements in NFPA 72 and the IBC.
7.6.2 Waterflow Switches
Waterflow switches will be installed on each floor and each fire area protected by sprinkler systems. Each waterflow switch will be separately annunciated at the main fire alarm control unit and all required annunciators. Waterflow switches will be installed in accordance with the requirements in NFPA 13, NFPA 72, the IBC, and the manufacturer’s requirements. Zero-time delay water flow switches without time-delay capabilities will be installed where required.
7.6.3 Smoke Detectors
Multi-Criteria Technology Smoke Detectors will be installed in accordance with the requirements in NFPA 72 and the IBC. Smoke detectors will be installed where required to serve fire safety functions such as elevator recall, and door closures for fire/smoke barriers. Area smoke detectors will not be installed in any of the following rooms: mechanical equipment rooms, electrical closets, telephone closets, and emergency generator rooms. Area smoke detectors will be installed specifically for the protection of the fire control unit(s), notification appliance circuit power extenders, and supervising station transmitting equipment. Smoke detection appropriate for the application will be installed in each of the following:
uninterruptible power service rooms, electrical switch gear rooms, transformer vaults, telephone exchanges, and information technology equipment rooms. When smoke detection is installed in rooms having high voltage equipment, the smoke detection will not be installed directly above the high voltage equipment. Duct smoke detectors will be installed to meet the requirements in NFPA 90A. Operation of a duct smoke detector will not activate the fire alarm evacuation signals and will initiate a supervisory signal.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-12
7.6.4 Audible Notification Appliances
Performance, location, and mounting of audible notification appliances will be installed in accordance with the requirements in NFPA 72. The performance of the audible notification appliances will meet the voice intelligibility requirements in each designated acoustically distinguishable space (ADS). The design for achieving the required minimum dBA levels will take into consideration all building construction materials such as carpeting, hard surfaces, walls, doors, etc., and any other materials that can cause sound level attenuation and/or clarity problems in the placement and location of all audible notification appliances.
Fire alarm speakers will be installed in each elevator car and exit stairways; however, they must only be activated to broadcast live voice messages (e.g., manual announcements). The automatic voice messages must be broadcast through the fire alarm speakers on the appropriate floors, but not in stairs or elevator cars. Audible notification appliances located in the vicinity of the systems manual microphone shall be installed and controlled by a separate initiation circuit so that it can be disabled through the systems programming while a live voice announcement is being made to avoid audio system feedback and clear voice transmissions.
7.6.5 Visible Notification Appliances
Placement and spacing of visible notification appliances will be in accordance with the requirements in NFPA 72. Visible notification appliances will be installed only in public and common areas. Public and common areas include public restrooms, reception areas, building core areas, conference rooms, open office areas, and so on. Visible notification appliances are not required to be installed in individual offices.
Visible notification appliances will not be installed in exit enclosures (e.g., exit stairs) or elevator cars. All new visible notification appliance will be labeled with the word “ALERT” in a contrasting factory labeled red or white lettering.
7.6.6 Occupant Notification
Transmission of an alarm signal from any fire alarm system initiation device to notify the occupants throughout the building will be accordance with the requirements in NFPA 72 and the IBC. All alarm signals transmitted from any fire alarm system initiation device will activate the respective building audible and visible notification appliances to notify the occupants. Duct smoke detectors will not activate the fire alarm system notification appliances.
7.6.7 Fire Alarm Notification Strategies for the Building
The fire alarm and emergency communication system modifications will be designed to be able to maintain the systems operation for selective evacuation. Fire alarms in the building will perform a complete evacuation of the building with the “fire evacuation message”. The visible alarm notification appliance circuits will be activated on all floors. L.E.D. visual notification appliances will be specified for the project and high-fidelity audible notification appliances will be specified for the project in all acoustically distinguishable spaces requiring intelligibility levels of 0.7 Sound Transmission Index (STI) or higher.
7.6.8 Survivability
The fire alarm and emergency communication system will be designed to meet the survivability requirements in NFPA 72 where the system is modified. All new circuits, including speaker/audio, SLC, network, and power necessary for the operation of the notification appliances will be protected until they enter the evacuation signaling zone they serve will be protected to meet the requirements of NFPA 72
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-13 pathway survivability Level 3. Two distinct fire alarm audible notification appliance circuits and two distinct visible notification appliance circuits will be provided on each floor of each building. Two Class B Signaling Line Circuits (SLC) will be provided for each floor of each building. The floor SLC’s will be isolated from the SLC risers and networks. The system will be designed and installed so that a single wire to wire short or any other single Class B impairment on an SLC does not affect more than one half of the area of the floor in each building.
7.6.9 Fire Command Center
The buildings fire command center on the first floor in the building will not be affected by the construction during this project.
A new U.S. Marshals Service Command and Control Center will be added to the facility as part of this project. The fire alarm and emergency communication system control equipment that is installed in U.S.
Courthouses must include redundant functionality installed within the U.S. Marshals Service (USMS) Command and Control Center. The redundant controls must have the same capabilities and operation as the main fire alarm and emergency communication system control unit, including annunciation, except there must be no capability to initiate “Signal Silence” (turning notification appliances off), “Acknowledge” (of any signal), and “Reset” (resetting the system to normal) operations. In addition, the control unit’s alarm, supervisory, and trouble audible signals must be capable of being silenced. Subsequent alarm, supervisory, and trouble conditions must cause the local audible signal to resound. The master microphone located at the main fire alarm and emergency communication system control unit must be arranged to take priority over the redundant microphone located in the USMS Command and Control Center.
7.6.10 Annunciator
The fire alarm systems annunciator in the building will not be affected by the construction during this project.
7.7 Water Supply for Fire Protection
The existing water supply into the building will not be affected by the construction during this project.
7.7.1 Fire Pump
It is not anticipated that the fire pump in the building will be affected by the construction during this project provided the existing fire pump can provide water supply needs for this project. Preliminary calculations will be conducted to confirm the fire pump requirements.
7.7.2 Pressure Maintenance Pump (Jockey Pump)
The pressure maintenance pump in the building will not be affected by the construction during this
7.7.3 Fire Hydrants
No new fire hydrants will be required for the building. The existing fire hydrants will not be affected by the construction during this project.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy documents when no longer needed
Page 07-14
7.7.4 Post Indicator Valve
No exterior post indicator valves will be provided as part of this project.
7.8 Automatic Sprinkler and Standpipe Systems
In areas that are documented as historically significant spaces, sprinklers will be carefully placed to minimize damage to ornamental materials. Detailed drawings will be developed for architecturally sensitive areas, showing precise sprinkler locations, and finishing notes as necessary to guide proper installation. When possible, sprinklers will be centered and placed symmetrically in relation to ornamental patterns and architectural features defining the space.
Sprinklers and escutcheons will match original architectural surfaces or hardware. Oxidized brass or bronze heads will be specified in deeply colored (unpainted) woodwork. In elaborately decorated ceilings, heads will be specified to be camouflaged by custom coating and omitting escutcheon plates where permissible. In such cases, we understand low-profile, quick-response sprinklers are preferred.
Preservation zone drawings delineating areas with historic finishes will be referenced when coordinating sprinklers.
New automatic sprinklers will be installed throughout the renovated spaces in accordance with the requirements in NFPA 13, the IBC, GSA PBS P-100, and the GSA sprinkler system specifications 213113. Locations that are specifically exempted from being provided with sprinklers by the GSA RFPE, NFPA 13, and the IBC will be separated from adjacent sprinklered rooms or areas by fire barriers having at least a two-hour fire-resistance rating. All sprinkler systems will be wet-pipe sprinkler systems, unless installed in areas subject to freezing. In areas subject to freezing, dry-pipe sprinkler systems, or dry pendent or sidewall sprinklers will be provided. The sprinkler system modifications will be designed using a minimum system design area of 1,500 sq. ft. with no area decreases permitted. Any floor openings are not classified as atriums and are enclosed on the upper level, with the enclosure opening effectively creating a high ceiling. All sprinkler system control valves will be located in accessible spaces and will not be located in above-ceiling spaces. The first floor control valves and water flow switches located above the ceiling in the elevator lobby will be relocated to an accessible location in the stairs that do not intrude into the height and area clearance requirements dedicated for egress. The dry pipe valve in the basement will be replaced when the dry pipe system for the loading dock is reconfigured for the new layouts for this project. No antifreeze sprinkler systems will be used in the buildings. No pre-action-type sprinkler systems will be installed. All new sprinklers will be provided with guards when the sprinklers are installed less than
2.1 m (7 ft.) above the floor, in elevator machine rooms, in elevator pits, in electrical closets, or in electrical equipment rooms. Any new or renovated electrical switchgear rooms or transformer vaults will be provided with separate supervised manual isolation valves and separate water flow switches located outside the protected space in an accessible location.
7.8.1 Types of Sprinklers
All sprinklers will be selected based on the design requirements for the specific hazards within the buildings to provide protection in accordance with the requirements in NFPA 13 and the IBC. Quick response sprinklers will be installed in all spaces except the elevator machine rooms. Extended coverage upright and pendent sprinklers will not be used. Flexible sprinkler fittings will not be used in these building.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Page 07-15
7.8.2 Sprinkler Piping
Sprinkler piping, fittings, control valves, check valves, and drain assemblies will be provided to meet the requirements in NFPA 13 and the “Buy American Act”. Black steel will be used for all sprinkler piping.
Galvanized sprinkler piping will not be installed in any wet sprinkler systems. Galvanized sprinkler piping will not be installed in any dry pipe sprinkler system except were listed for use as part of the dry-pipe sprinkler valve trim assembly. Sprinkler pipe sizes 2 inches and smaller will be Schedule 40 and will be threaded. Dry-pipe sprinkler piping will be Schedule 40, piping sized larger than 2 inches will be provided with cut grooves with flush seal gaskets. Wet-pipe sprinkler piping and standpipes sized larger than 2 inches will be permitted to be Schedule 10 and will be roll grooved. All steel piping will have a corrosion-resistant ratio of at least 1 or greater.
7.8.3 Automatic Sprinkler Systems for Remote or Isolated Facilities The facility is not classified as a remote or isolated facility.
7.8.4 Fire Department Connections
The fire department connections for the building will not be affected by the construction during this
7.8.5 Standpipes
The standpipes for the building will not be affected by the construction during this project.
7.8.6 Fire Department Hose Outlets
Fire department hose outlets for the building will not be affected by the construction during this project.
7.9 Non-Water-Based Fire Extinguishing Systems
7.9.1 Wet Chemical Extinguishing Systems
Wet chemical extinguishing systems will not be used for fixed fire extinguishing systems.
7.9.2 Dry Chemical Extinguishing Systems
Dry chemical extinguishing systems will not be used for fixed fire extinguishing systems.
7.9.3 Clean Agent Extinguishing Systems
Clean agent extinguishing systems are not specified to be used as part of this project. If an agency or tenant specifically requires clean agent extinguishing systems, they will only be installed when specifically approved for installation by the GSA regional fire protection engineer. If a clean agent extinguishing system is installed it will only be provided as a supplemental fire extinguishing system and will not be installed in place of sprinkler protection in the space. The sprinklers in the locations with a supplementary fire extinguishing system will be of the intermediate temperature class with a standard response rating and will be of the concealed type or provided with durable sprinkler guards.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Page 07-16
7.9.4 Carbon Dioxide Fire Extinguishing Systems
Carbon dioxide fire extinguishing systems will not be used for fixed fire extinguishing systems in this
7.9.4 Portable Fire Extinguishers and Cabinets
Portable fire extinguishers and cabinets will only be installed in renovated areas such as mechanical and elevator equipment areas, computer rooms, UPS rooms, storage rooms, generator rooms, kitchen areas, and special hazard areas where they are required by the IBC. It tenant computer rooms, Main Distribution
Frame (MDF) rooms, or similar areas where the tenant prefers the use of Haltron for first response protection and extinguishment, a standard quantity of type ABC extinguishers will also be provided.
7.10 Elevator Systems
The elevator machine room(s) for the building will not be affected by the construction during this project.
Smoke detectors located within 21 feet of any elevator car door opening that will be affected by the renovations to the building will be maintained in full operation during the renovation. Smoke detector(s) will be relocated or added in order maintain full functionality of the system.
7.10.1 Fire Service Access Elevators
Fire service access elevators will not be provided because the buildings are less than 120-feet above fire service access (IBC 403.6.1).
7.11 Special Fire Protection Requirements
7.11.1 Information Technology Equipment Rooms
New rooms containing high value or mission essential electrical equipment will require fire suppression in accordance with NFPA 75 with modifications by the P100.
Outstanding Item: GSA or tenant agencies to indicate if there will be mission critical IT rooms in the building.
7.11.2 Places of Confinement (Holding Areas)
There are planned places of confinement which will be managed by the U.S. Marshals Service. The sprinkler requirement outlined in the P100 for these areas will be provided. In areas of confinement, sprinklers will be institutional quick-response flush pendent sprinklers designed for standard or extended coverage applications. The institutional sprinklers will have a solder-link-type fusible element, a tamper-resistant escutcheon, and a retaining flange that prevents sprinkler movement away from walls and ceilings.
7.11.3 Floor Openings and Atriums
At this time, the building does not contain any atriums in any of the renovated spaces.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Page 07-17
7.11.4 Cooling Towers
Sprinkler protection for the cooling towers will be provided for any new cooling towers as required by the P100 if the materials of construction warrants sprinkler protection.
7.12 Historic Structures
Given the Bricker Federal Building will be registered as a historic building with historic elements, the impact to these historic elements will be considered carefully. Alternate methods of compliance will be considered with the building historical architect and discussed with the regional GSA FPE prior to design development submission.
7.13 Mass Notification Systems
A mass notification system meeting the requirements of NFPA 72 will not be provided with this project.
However, providing automated and live voice messages for various non-fire building emergencies, such as severe weather, biological/chemical spills, terrorist acts, can be provided via the one-way voice communication system if desired/required by the GSA RFPE.
7.14 Commissioning Fire Protection and Life Safety
Systems Jensen Hughes will be the fire commissioning agent (FCxA) at a later stage and work with the design team to align the project specifications with the commissioning plan.
7.15 Design Review
Jensen Hughes has reviewed the current concept designs and has noted some issues during the concept design stages that the team has resolved in the development of the design after the Peer Review.
Entered Values
TRACE® 700 version 6.3.5
By DLR GROUP
Project Name:
Dataset Name: C:\Users\jschmotzer\Trace\BRICKER\test\BRICKER4.TRC
Location:
Building Owner:
Program User:
Company:
Comments:
Cooling Design Period: January thru December
Peak Hour Override: 0
Columbus, OhioLocation:
Daylight Savings Period:
Summer Period:
°F 91.30Summer Design Dry Bulb:
°F 73.70Summer Design Wet Bulb:
Cooling Methodology:
°F 5.50Winter Design Dry Bulb:
RTS (ASHRAE Tables)
Heating Methodology: UATD 0.85Summer Clearness Number:
0.85Winter Clearness Number:
Room Circ Rate:
0.20Summer Ground Reflectance:
Medium
0.20Winter Ground Reflectance:
Wall Load To Plenum: YES
Building Orientation:
Infiltration Methodology:
Outside Film Methodology:
Terrain Methodology:
Vary with wind speed
Vary with wind speed
Center of a large city
Force VAV Min => Nominal Ventilation at Design:
Allow Energy Recovery/Transfer at Design:
Retest Design Peaks:
Calculate Building Block Loads:
Yes
Yes
No
350 degrees from north Yes
400Carbon Dioxide Level: ppm
Project Name: TRACE® 700 v6.3.5
Dataset Name: Entered Values - Project InformationC:\Users\jschmotzer\Trace\BRICKER\test\BRICKER4.TRC
ENTERED VALUES
ROOM BY ROOM
By DLR GROUP
GENERAL INFORMATION
Floor Area: People Type: None # of People:Plenum Height:
Flr-Flr Height:
188 - ToiletRoom Description:
Slab Cnstr Type: 4* LW Concrete Room Mass: Time delay based on actual mass
Ceiling R-Value:
Is There Carpet?: YES
Design Clg DB / Drift Point:
55 %
Floor Multiplier: 1
PEOPLE
People Sensible: 0 Btu/h
People Schedule: Cooling Only (Design)
Lighting Type: LED Lighting 100% load to space
Fixture Type: LED Lighting % Load to RA: 0 %
Lighting Schedule: Cooling Only (Design) Lighting Amount:
1.0
AIRFLOW INFORMATION
FPB-1-1Zone Description:
Vent Type:
Infil Type:
Default Std62 Vent Value:
Available (100%)Vent Schedule:
Design Infiltration
Infil Value:
Infil Schedule: Available (100%)
Default Std62
Design Infiltration
Vav Airflow:
Available (100%)Vav Sched:
Supply:
Aux Supply:
Room Exhaust:
Ballast Factor:
People Latent :
Design Htg DB / Drift Point:
Design Relative Humidity:
Room Multiplier:
0.00 cfm/person 0.00 cfm/sq ft
0.10 cfm/sq ft of wall 0.10 cfm/sq ft of wall
To be calculated To be calculated To be calculated To be calculated
51 ft² 19.0 ft
9.2 ft
1.786 hr·ft²·°F/Btu
75.0 °F / 80.0 °F
72.0 °F / 67.0 °F
System Description: AH-1 (exterior)
0 People
0.980 W/sq ft
0 Btu/h
Height Above Flr:
Moisture Capacitance:
Humidistat Location:
Medium
Room NoneCO2 Sensor Location:
RoomThermostat Location:
NoneClg Tstat:
NoneHtg Tstat:
Available (100%)
Ceiling clg supply, ceiling return Ceiling supply < Trm+15°F(8°C), ceiling return Default based on system type
100 %
Std 62.1-2004
Cooling Ez:
Heating Ez:
Er:
Rm Exh Sched:
LIGHTS
Cooling (Peop-based) Heating (Area-based)
1.0 workstation/personWorkstation:
ConditionedRoom Type:
Description
Pct Pct Pct Rad
Shade Ret/Rm/Sen/ Frc/
Adj
Const Type /Area/ ExternalU Value Coef
LossPermHeatCoolInternal Amount ScheduleDir Tilt ShadingBtu/h·ft²·°F CoefLenTmpTmp
Glass
U Value ShadingBtu/h·ft²·°F
Type /
Energy Type
Area Grnd Refl
Temp/
Alpha ft²
180 0 0.0572Bricker Wall111 ft² 0.90South
Cooling Only (Design) 100 60.0001000.74 W/sq ft NoneMisc Load 1
GENERAL INFORMATION
Floor Area: People Type: Classroom # of People:Plenum Height:
Flr-Flr Height:
189 - Robing RoomRoom Description:
Slab Cnstr Type: 4* LW Concrete Room Mass: Time delay based on actual mass
Ceiling R-Value:
Is There Carpet?: YES
Design Clg DB / Drift Point:
55 %
Floor Multiplier: 1
PEOPLE
People Sensible: 250 Btu/h
People Schedule: Cooling Only (Design)
Lighting Type: LED Lighting 100% load to space
Fixture Type: LED Lighting % Load to RA: 0 %
Lighting Schedule: Cooling Only (Design) Lighting Amount:
1.0
AIRFLOW INFORMATION
FPB-1-1Zone Description:
Vent Type:
Infil Type:
Default Std62 Vent Value:
Available (100%)Vent Schedule:
design infiltration
Infil Value:
Infil Schedule: Available (100%)
Default Std62 design infiltration
Vav Airflow:
Available (100%)Vav Sched:
Supply:
Aux Supply:
Room Exhaust: 0.25 cfm/sq ft
Ballast Factor:
People Latent :
Design Htg DB / Drift Point:
Design Relative Humidity:
Room Multiplier:
0.00 cfm/person 0.00 cfm/sq ft
0.10 cfm/sq ft of wall 0.10 cfm/sq ft of wall
To be calculated To be calculated To be calculated To be calculated
146 ft² 19.0 ft
9.2 ft
1.786 hr·ft²·°F/Btu
75.0 °F / 80.0 °F
72.0 °F / 67.0 °F
System Description: AH-1 (exterior)
29 sq ft/person
0.710 W/sq ft
200 Btu/h
Height Above Flr:
Moisture Capacitance:
Humidistat Location:
Medium
Room NoneCO2 Sensor Location:
RoomThermostat Location:
NoneClg Tstat:
NoneHtg Tstat:
Available (100%)
Ceiling clg supply, ceiling return Ceiling supply < Trm+15°F(8°C), ceiling return Default based on system type
Heating Ez:
Er:
Rm Exh Sched:
LIGHTS
Cooling (Peop-based) Heating (Area-based)
Shade Ret/Rm/Sen/ Frc/
Adj
Const Type /Area/ ExternalU Value Coef
LossPermHeatCoolInternal Amount ScheduleDir Tilt ShadingBtu/h·ft²·°F CoefLenTmpTmp
Glass
U Value ShadingBtu/h·ft²·°F
Type /
Energy Type
Area Grnd Refl
Temp/
Alpha ft²
180 0 0.0572Bricker Wall315 ft² 0.90South
90 0 0.0572Bricker Wall130 ft² 0.90East
Cooling Only (Design) 100 60.0001000.83 W/sq ft NoneMisc Load 1
Project Name: TRACE® 700 v6.3.5 calculated at 06:46 PM on 06/13/2023
Dataset Name: Alternative - 1 Entered Values - Rooms Page 1 of 66C:\Users\jschmotzer\Trace\BRICKER\test\BRICKER4.TRC
By DLR GROUP
GENERAL INFORMATION
Floor Area: People Type: General Office Space # of People:Plenum Height:
Flr-Flr Height:
778 - CopyRoom Description:
Slab Cnstr Type: 4* LW Concrete Room Mass: Time delay based on actual mass
Ceiling R-Value:
Is There Carpet?: YES
Design Clg DB / Drift Point:
55 %
Floor Multiplier: 1
PEOPLE
People Sensible: 250 Btu/h
People Schedule: Cooling Only (Design)
Lighting Type: Recessed fluorescent, not vented, 80% load to space Fixture Type: RECFL-NV
% Load to RA: 20 % Lighting Schedule: Cooling Only (Design)
Lighting Amount:
1.0
AIRFLOW INFORMATION
FPB-1-10Zone Description:
Vent Type:
Infil Type:
Telephone/ data entry Vent Value:
Available (100%)Vent Schedule:
None
Infil Value:
Infil Schedule: Available (100%)
Telephone/ data entry
None
Vav Airflow:
Available (100%)Vav Sched:
Supply:
Aux Supply:
Room Exhaust:
Ballast Factor:
People Latent :
Design Htg DB / Drift Point:
Design Relative Humidity:
Room Multiplier:
5.00 cfm/person 0.06 cfm/sq ft
0.60 air changes/hr 0.60 air changes/hr
To be calculated To be calculated To be calculated To be calculated
68 ft² 19.0 ft
3.2 ft
1.786 hr·ft²·°F/Btu
75.0 °F / 80.0 °F
72.0 °F / 67.0 °F
System Description: AH-1 (exterior)
17 sq ft/person
1.110 W/sq ft
200 Btu/h
Height Above Flr:
Moisture Capacitance:
Humidistat Location:
Medium
Room NoneCO2 Sensor Location:
RoomThermostat Location:
NoneClg Tstat:
NoneHtg Tstat:
Available (100%)
Ceiling clg supply, ceiling return Ceiling supply < Trm+15°F(8°C), ceiling return Default based on system type
Heating Ez:
Er:
Rm Exh Sched:
LIGHTS
Cooling (Peop-based) Heating (Area-based)
Shade Ret/Rm/Sen/ Frc/
Adj
Const Type /Area/ ExternalU Value Coef
LossPermHeatCoolInternal Amount ScheduleDir Tilt ShadingBtu/h·ft²·°F CoefLenTmpTmp
Glass
U Value ShadingBtu/h·ft²·°F
Type /
Energy Type
Area Grnd Refl
Temp/
Alpha ft²
90 0 0.0572Bricker Wall93 ft² 0.90East
Window None41 Adjacent Building 0.40 0.5790.1-2013 Window 0.00 1
Cooling Only (Design) 100 60.0001000.74 W/sq ft NoneMisc Load 1
Dataset Name: Alternative - 1 Entered Values - Rooms Page 2 of 66C:\Users\jschmotzer\Trace\BRICKER\test\BRICKER4.TRC
By DLR GROUP
GENERAL INFORMATION
Floor Area: People Type: General Office Space # of People:Plenum Height:
Flr-Flr Height:
782 - OfficeRoom Description:
Slab Cnstr Type: 4* LW Concrete Room Mass: Time delay based on actual mass
Ceiling R-Value:
Is There Carpet?: YES
Design Clg DB / Drift Point:
55 %
Floor Multiplier: 1
PEOPLE
People Sensible: 250 Btu/h
People Schedule: Cooling Only (Design)
Lighting Type: LED Lighting 100% load to space
Fixture Type: LED Lighting % Load to RA: 0 %
Lighting Schedule: Cooling Only (Design) Lighting Amount:
1.0
AIRFLOW INFORMATION
FPB-1-10Zone Description:
Vent Type:
Infil Type:
Default Std62 Vent Value:
Available (100%)Vent Schedule:
design infiltration
Infil Value:
Infil Schedule: Available (100%)
Default Std62 design infiltration
Vav Airflow:
Available (100%)Vav Sched:
Supply:
Aux Supply:
Room Exhaust:
Ballast Factor:
People Latent :
Design Htg DB / Drift Point:
Design Relative Humidity:
Room Multiplier:
5.00 cfm/person 0.06 cfm/sq ft
0.10 cfm/sq ft of wall 0.10 cfm/sq ft of wall
To be calculated To be calculated To be calculated To be calculated
139 ft² 19.0 ft
3.2 ft
1.786 hr·ft²·°F/Btu
75.0 °F / 80.0 °F
72.0 °F / 67.0 °F
System Description: AH-1 (exterior)
200 sq ft/person
1.110 W/sq ft
200 Btu/h
Height Above Flr:
Moisture Capacitance:
Humidistat Location:
Medium
Room NoneCO2 Sensor Location:
RoomThermostat Location:
NoneClg Tstat:
NoneHtg Tstat:
Available (100%)
Ceiling clg supply, ceiling return Ceiling supply < Trm+15°F(8°C), ceiling return Default based on system type
Heating Ez:
Er:
Rm Exh Sched:
LIGHTS
Cooling (Peop-based) Heating (Area-based)
Shade Ret/Rm/Sen/ Frc/
Adj
Const Type /Area/ ExternalU Value Coef
LossPermHeatCoolInternal Amount ScheduleDir Tilt ShadingBtu/h·ft²·°F CoefLenTmpTmp
Glass
U Value ShadingBtu/h·ft²·°F
Type /
Energy Type
Area Grnd Refl
Temp/
Alpha ft²
90 0 0.0572Bricker Wall93 ft² 0.90East
Window None20 Adjacent Building 0.29 0.5790.1-2013 Window 0.00 1
Window None16 Overhang - None0.29 0.5790.1-2013 Window 0.00 2
Cooling Only (Design) 100 60.0001001.67 W/sq ft ElectricityMisc Load 1
Dataset Name: Alternative - 1 Entered Values - Rooms Page 3 of 66C:\Users\jschmotzer\Trace\BRICKER\test\BRICKER4.TRC
By DLR GROUP
GENERAL INFORMATION
Floor Area: People Type: General Office Space # of People:Plenum Height:
Flr-Flr Height:
783 - OfficeRoom Description:
Slab Cnstr Type: 4* LW Concrete Room Mass: Time delay based on actual mass
Ceiling R-Value:
Is There Carpet?: YES
Design Clg DB / Drift Point:
55 %
Floor Multiplier: 1
PEOPLE
People Sensible: 250 Btu/h
People Schedule: Cooling Only (Design)
Lighting Type: LED Lighting 100% load to space
Fixture Type: LED Lighting % Load to RA: 0 %
Lighting Schedule: Cooling Only (Design) Lighting Amount:
1.0
AIRFLOW INFORMATION
FPB-1-10Zone Description:
Vent Type:
Infil Type:
Default Std62 Vent Value:
Available (100%)Vent Schedule:
design infiltration
Infil Value:
Infil Schedule: Available (100%)
Default Std62 design infiltration
Vav Airflow:
Available (100%)Vav Sched:
Supply:
Aux Supply:
Room Exhaust:
Ballast Factor:
People Latent :
Design Htg DB / Drift Point:
Design Relative Humidity:
Room Multiplier:
5.00 cfm/person 0.06 cfm/sq ft
0.10 cfm/sq ft of wall 0.10 cfm/sq ft of wall
To be calculated To be calculated To be calculated To be calculated
142 ft² 19.0 ft
3.2 ft
1.786 hr·ft²·°F/Btu
75.0 °F / 80.0 °F
72.0 °F / 67.0 °F
System Description: AH-1 (exterior)
200 sq ft/person
1.110 W/sq ft
200 Btu/h
Height Above Flr:
Moisture Capacitance:
Humidistat Location:
Medium
Room NoneCO2 Sensor Location:
RoomThermostat Location:
NoneClg Tstat:
NoneHtg Tstat:
Available (100%)
Ceiling clg supply, ceiling return Ceiling supply < Trm+15°F(8°C), ceiling return Default based on system type
Heating Ez:
Er:
Rm Exh Sched:
LIGHTS
Cooling (Peop-based) Heating (Area-based)
Shade Ret/Rm/Sen/ Frc/
Adj
Const Type /Area/ ExternalU Value Coef
LossPermHeatCoolInternal Amount ScheduleDir Tilt ShadingBtu/h·ft²·°F CoefLenTmpTmp
Glass
U Value ShadingBtu/h·ft²·°F
Type /
Energy Type
Area Grnd Refl
Temp/
Alpha ft²
90 0 0.0572Bricker Wall93 ft² 0.90East
Window None43 Adjacent Building 0.29 0.5790.1-2013 Window 0.00 1
Cooling Only (Design) 100 60.0001001.67 W/sq ft ElectricityMisc Load 1