REVISED_Bricker Supplemental 1442 Pricing Sheet.pdf
PDF 69 KB Posted
- Attached to
- GC Services for the Bricker USBC Backfill Project Federal contract opportunity
- Solicitation number
- 47PF0022R0038
About this file
This document contains a supplemental pricing sheet for a federal construction contract opportunity. The pricing sheet provides line item pricing for general construction services for the Bricker USBC Backfill Project, including costs for core and shell construction, courtroom and chamber buildout, security infrastructure installation, and environmental allowances. Evaluated pricing totals are presented with individual line items for the base construction work, three optional lobby upgrades, and environmental and signage allowances. The related federal contract opportunity is solicited through the General Services Administration Public Buildings Service Region 5 as solicitation number 47PF0022R0038 for general contractor services to support the Bricker USBC Backfill Project.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bricker USBC Backfill Project Supplemental 1442 Pricing Sheet
47PF0022R0038
Line Item Price
Base Construction Firm Fixed Price (Total = 1a + 1b + 1c + 1d + 1e + 1f + 1g + 1h) $
1a Core and Shell $
1b Lobby Base Construction: 1st Floor $
1c
1st Floor Addition Enclosure and Structure (Site Wall, Façade Cladding, Exit Ramp, floor slab, roofing, etc) and 2nd Floor Mezzanine (stamped concrete flooring, etc)
1d USBC Courtroom, Chamber, Clerk $
1e USMS General Construction $
1f
USMS Judicial Security Infrastructure, Lobby Turnstile and Partial Height Glazing Wall, Mezzanine Security Enhancements $
1g Building Security $
1h Environmental - ACM $
Lobby Option 1: Entry Vestibule 148, Entry Vestibule 150, and Entrance Lobby 151 Ceiling $
Lobby Option 2: Entrance Lobby 151 lighting removal and replacement $
4 Lobby Option 3: Entrance Lobby 151 bench $
5 Allowance 1: Signage $30,000.00
6 Allowance 2: Environmental $200,000.00
Total Evaluated Price (Line 1 + 2 + 3 + 4 + 5 + 6) $
File details come from the government source that posted it. Updated .