GAOA Timberline Lodge Boiler

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240BH21R0014
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Government Camp OR 97028, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for a multi-phase boiler replacement project at Timberline Lodge located in Mount Hood National Forest, Oregon. The United States Department of Agriculture Forest Service Pacific Northwest Region is procuring the removal of aging steam boilers and installation of new hot water boiler systems, associated piping and controls, and room radiator replacements. Offerors must be registered in the System for Award Management and submit responses through beta.sam.gov by June 4, 2021. Evaluation will consider the vendor's ability to complete the work in accordance with the specifications while minimizing impacts to Lodge operations.

The project is set aside for total small business and has a place of performance in Government Camp, Oregon. The NAICS code is 238220 and PSC code R499 covers the boiler replacement work. Phase 1 involves preliminary work and installing the first new boiler by October 2021 with subsequent optional phases replacing additional boilers and equipment through May 2023 for a total estimated budget over $10 million. The solicitation also includes 221 radiator replacements to be installed across all phases.

Notice text

10 versions

Update #10 · Latest ·

Amendment 9 posted 5/29/2021

Amendment 8 posted 5/27/2021

Amendment 7 posted 5/24/2021.  Due date for offers extended until 1 June 2021.

Amendment 5 and 6 posted 5/19/2021

Amendment 4 posted 5/17/2021

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #9 ·

Amendment 8 posted 5/27/2021

Amendment 7 posted 5/24/2021.  Due date for offers extended until 1 June 2021.

Amendment 5 and 6 posted 5/19/2021

Amendment 4 posted 5/17/2021

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #8 ·

Amendment 7 posted 5/24/2021.  Due date for offers extended until 1 June 2021.

Amendment 5 and 6 posted 5/19/2021

Amendment 4 posted 5/17/2021

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #7 ·

Amendment 5 and 6 posted 5/19/2021

Amendment 4 posted 5/17/2021

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #6 ·

Amendment 5 posted 5/19/2021

Amendment 4 posted 5/17/2021

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #5 ·

Amendment 4 posted 5/17/2021

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #4 ·

Amendment 3 posted 5/14/2021

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrance.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #3 ·

A follow-up site visit has been scheduled for May 18, 2021 at Timberline Lodge from 8:00AM-10:30AM.  Participants will meet near the loading dock/ADA entrace.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #2 ·

Amendment 1 posted 4/30/2021

Amendment 2 posted 5/05/2021

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #1 ·

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Files

File Type Posted
AmendmentA0009.pdf PDF
AmendmentA0008.pdf PDF
AmendmentA0007.pdf PDF
AmendmentA0006.pdf PDF
Interested Vendors.pdf PDF
Amendment0005.pdf PDF
TimberlineBoilersErrataAmendment4-20210514.pdf PDF
260000A-ElectricalBasicRequirements-Testing-20210517.pdf PDF
AmendmentA0004.pdf PDF
AmendmentA0003.pdf PDF
AmendmentA0002.pdf PDF
AmendmentA0001.pdf PDF
MainAndWyEastDayLodgeSpecs-20210426.pdf PDF
MainAndWyEastDayLodge-Drawings-20210426.pdf PDF
CompleteSolicitation.pdf PDF
Show all 15

Notice history

Notice Type Posted
GAOA Timberline Lodge Boiler Award Award Notice
This notice Latest solicitation Solicitation
GAOA Timberline Lodge Boiler Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years (offers are now due on 11/13/2026) White City, Oregon 97503, United States · NAICS 561210 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
16292 Steam Boiler Replacement Hill AFB, Utah 84056, United States · NAICS 238220 Air Force Sustainment Center Total Small Business
GAOA Star Meadows MEP Repairs Utility Installations Flathead NF Whitefish, Montana 59937, United States · NAICS 238220 Forest Service Total Small Business
Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC Rome Community Based Outpatient Center (Cboc) Rome, New York 13441, United States · NAICS 238220 Veterans Integrated Service Network 2 Total Small Business
Or-bandon marsh NWR-bandon HVAC NAICS 238220 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity