GAOA Timberline Lodge Boiler

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
1240BH21R0014
Agency
Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Z2FB Repair Or Alteration Of Recreational Buildings
Place of performance
Government Camp OR 97028 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks proposals for a phased boiler replacement project at the Timberline Lodge located in the Mt Hood National Forest. The Department of Agriculture Forest Service Pacific Northwest Region will replace aging steam boilers with new hot water boiler systems over multiple phases. Phase 1 involves installing a 2,000 MBH hot water boiler and hot water piping by July 2021. Phases 2 through 4, addressed in options 1 through 3, continue boiler replacements through May 2023. Offerors must be registered in SAM and provide electronic representations and certifications. The solicitation will be available on beta.sam.gov on or about April 21, 2021.

This project is set aside for total small business and has a NAICS of 238220 with an estimated value over $10,000,000. Phases 1 through 3 have performance periods of 120 to 150 days each. Phase 4 performance is 120 days. Replacement work includes removing old boilers, installing new high capacity hot water boilers, and upgrading radiators and ancillary HVAC systems. The government seeks to fully modernize the lodge's boiler infrastructure through this multi-phase procurement.

Notice text

6 versions

Update #6 · Latest ·

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/26/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #5 ·

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.  In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend.  Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item  002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item  003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7.  Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/23/21. 

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #4 ·

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1. Remove abandoned generator in the boiler room.

2. Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4.Remove existing piping service lines to the C.S. Price wing and re-supply with serv ice lines from the new boiler.

5. Install new main hot water piping in the boiler room. Demolish Steam to hot water heat exchangers for C.S. Price wing, patio and front Lodge entry snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler.

***Items 1-5 need to be completed before consistently freezing temperatures and snow occur in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping.***

6. Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

7. Design and install a new DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I as operational. System will include control system hardware, wiring to all devices, software programs and wiring isolation methods to provide for security from Malware, hacking and other threats. It is assumed that a firewall system and changes to the existing DDC system network connections to the existing building network will be required to provide for this security.

8. Install new panel CH-1 with capacity to serve the needs of phase I-III in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 2 will have a period of performance of 150 days starting May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

4. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

Phase 3 will have a period of performance of 150 days starting May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

Phase 4 will have a period of performance of 120 days starting May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/21/21. 

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #3 ·

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1. Remove abandoned generator in the boiler room.

2. Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4. Install new main hot water piping in the boiler room and attic spaces, stub off isolation valves for connection to individual room radiators; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets.

5. Design and install a new DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure and equipment necessary to render the systems installed in Phase I as operational. System will include software programs and wiring isolation methods to provide for security from Malware, hacking and other threats.

6. Install new panel CH-1 with capacity to serve the needs of phase I-III in the Lodge and all necessary circuits and controls for Phase I operational needs.

Phase 1 will have a period of performance of 120 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 2 will have a period of performance of 150 days starting May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

Phase 3 will have a period of performance of 150 days starting May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

Phase 4 will have a period of performance of 120 days starting May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/21/21. 

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #2 ·

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1. Remove abandoned generator in the boiler room.

2. Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4. Install new main hot water piping in the boiler room and attic spaces, stub off isolation valves for connection to individual room radiators; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets.

5. Design and install a new DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure and equipment necessary to render the systems installed in Phase I as operational. System will include software programs and wiring isolation methods to provide for security from Malware, hacking and other threats.

6. Install new panel CH-1 with capacity to serve the needs of phase I-III in the Lodge and all necessary circuits and controls for Phase I operational needs.

Phase 1 will have a period of performance of 120 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 2 will have a period of performance of 150 days starting May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

Phase 3 will have a period of performance of 150 days starting May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

Phase 4 will have a period of performance of 120 days starting May 2023.

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/21/21. 

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge.

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #1 ·

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1. Remove abandoned generator in the boiler room.

2. Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Install new main hot water piping in the boiler room and attic spaces, stub off isolation

valves for connection to individual room radiators; replace some room radiators.

Phase 1 will have a period of performance of 120 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump.

3. Replace room radiators on west side of building and connect heating and fan coil units at the common spaces.

Phase 2 will have a period of performance of 150 days starting May 2022

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler.

2. Replace remaining room radiators.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

Phase 3 will have a period of performance of 150 days starting May 2023

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers.

Phase 4 will have a period of performance of 120 days starting May 2023

Including all optional items, the Government’s estimated magnitude of this project is more than $10,000,000. 

Solicitation will be available for download from beta.sam.gov on or about 4/21/21. 

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.  If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GAOA Timberline Lodge Boiler Award Award Notice
GAOA Timberline Lodge Boiler Latest solicitation Solicitation
GAOA Timberline Lodge Boiler This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity