AmendmentA0008.pdf

PDF 523 KB Posted

Attached to
GAOA Timberline Lodge Boiler
Solicitation number
1240BH21R0014
Issued by

About this file

This solicitation requests proposals for a phased boiler replacement project at Timberline Lodge. The project includes removing existing steam boilers, installing new hot water boilers and associated pumps, piping, controls, and approximately 221 finned tube radiators. Phase 1 will replace one steam boiler with a 2,000 MBH hot water boiler by late October 2021. Phases 2 through 4, to be completed by May 2023 through optional items, will replace the remaining steam boilers with three new hot water boilers totaling 14,000 MBH. The Department of Agriculture Forest Service R6-Pacific Northwest Region will administer the contract with an estimated value over $10,000,000. Offerors must be registered in SAM to submit proposals, which will be accepted starting April 26, 2021.

View the file

Other files

File Type Posted
AmendmentA0009.pdf PDF
AmendmentA0007.pdf PDF
AmendmentA0006.pdf PDF
Amendment0005.pdf PDF
Interested Vendors.pdf PDF
AmendmentA0004.pdf PDF
TimberlineBoilersErrataAmendment4-20210514.pdf PDF
260000A-ElectricalBasicRequirements-Testing-20210517.pdf PDF
AmendmentA0003.pdf PDF
AmendmentA0002.pdf PDF
AmendmentA0001.pdf PDF
MainAndWyEastDayLodge-Drawings-20210426.pdf PDF
CompleteSolicitation.pdf PDF
MainAndWyEastDayLodgeSpecs-20210426.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240BH21R0014

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BH

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 6

GAOA05/27/20210008

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/26/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Please see attached clarifications.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

DARCY J. RAPOZA

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

27 May 2021

AMENDMENT #8 GAOA TIMBERLINE LODGE BOILER 5/27/2021

5/27/2021 GAOA Timberline Lodge Boiler Amendment #8 Page - 2/2

DDC controls system clarification:

DDC Controllers for the Ground & First Floor are located in room 11A. Existing control and control power wires were routed through the ceilings to room 11A.

It has been determined that the control drawings for the ground and first floors of Timberline Lodge will have to be created from the information gathered from the existing server and ground truthing by the designers. Drawings for the rest of the Lodge and the Day lodge will be made available after award.

The provided control drawings supplied by the Government are not as-built and must be field verified, modified and updated. The design of the new DDC system is required to produce a complete set of as-built schematic diagrams for both buildings for the completed control system.

Clarification of M0.2:

Finned tube cabinet models listed as Modine TA (Top outlet, Architectural grill) are new units to be installed to the wall surface and Custom cabinet models are new units installed in newly constructed or modified cabinets to match the existing, in the areas specified. (These units will need new power and control wires tied in with the existing sensors/thermostats for the areas they serve)

Existing enclosures will have the finned tube units replaced in the existing cabinets and then have the cabinets restored to original condition. (These units should be able to utilize existing power and control wires.)

In the Finned Tube schedule table:

The following finned tube units will require new sensor and power wiring, control valves and wiring: 02, 02B, 18 A-C, 22A/B, 23,24,25,26, 27,28,60, 62 A/B, 50 A/B, 150A-C, 160 A/B, 161, 236A/B,237A/B, 238A/B, 250A-C, 251, 260A/B, 262, 350A/B, 351, and 360, see the attached spreadsheet, FT data20210526 for more information.

FT-07 should be listed as FT-07B (There were two listed in the schedule as FT-07, but are actually shown on drawing M 2.1 as FT-07 and FT-07B)

FT-09 should be listed as FT-09B (There were two listed in the schedule as FT-09, but are actually shown on drawing M 2.1 as FT-09 and FT-09B)

Sheet M 2.4 Clarification:

There has been some confusion about the phasing due to the fact that Sheet M2.4 shows the 2nd floor as well as the attic space above.

The phase 1 piping will start at the boiler room and ascend to the attic through the far East end rooms and stairwell area. The piping will then be above the 2nd floor of the East wing and runs through the attic, over the 2nd floor of the east wing, through the attic of the headhouse and into the attic above the 3rd floor of the West wing.

From there it goes through the attic to the far west end, and then comes back down to the ground floor through the stairwell and rooms closest to the West end.

AMENDMENT #8 GAOA TIMBERLINE LODGE BOILER 5/27/2021

5/27/2021 GAOA Timberline Lodge Boiler Amendment #8 Page - 2/2

Along the course of this main line, there are a few FT installations on the East and west ends, and in the attic, and the stubbed out feeds for future phases will also be installed.

The best illustration of the phasing is shown on M 5.0 and M5.1.

Partial work item list for Phase I Boilers:

Phase I Basement Demolish existing generator in the mechanical room Install new hot water boiler in generator space Replace fuel lines and fuel pumps to existing and new boiler Install one new circulation pump for the new boiler Demolish Steam to Hot water snow melt heat exchangers for CS Price , patio and front lodge entry. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler.

Ground Floor:

West end Demo/install FT 01, 01B, 03,03B, 05, 05B, 07, 07B, 28, West end Demo/install FT 22A/B, 23,24,25, 62A/B.

First Floor West end Demo/install FT 101A-D, 160B (Not shown on M0.2, but shown on M2.2) East end no FT, just pipe routing to 2nd floor.

Second floor West end Demo/install FT: 201A-C, 228A, 260A.

East end Demo/install FT 228A, 228C, 230, 251, , 262.

Third Floor West end Demo/install FT 301A-D, 360 (Not shown on M0.2, but shown on M2.2).

No third floor on East end, only routing through the attic.

Attic Replace all main lines from east to west, T’s with valves and caps will be installed for future work.

Room # Type Notes Existing FT enclosure with sensor/thermostat, under DDC control.

01 Existing Enclosure New FT enclosure in area with existing sensor/thermostat new unit will require control, power wiring and control valve tied in with existing thermostat.

01B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space. Needs sensor, control wiring and valve.

2 Modine TA This area needs sensor, control wiring and valve New FT Note 9: Provide duct probe temperature sensor to be used for space temperature and control of heating water control valve.

02A Existing Enclosure Red Text Red text denotes new information

02AB Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

02B Modine TA This area needs sensor, control wiring and valve 03 Existing Enclosure

03B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

04 Existing Enclosure

04B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

05 Existing Enclosure

05B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

06 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

07 Existing Enclosure

07B Custom

Schedule on M0.2 shows 2‐FT‐07's, FT‐07B is corrected label.Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

08 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

09 Existing Enclosure

09B Custom

Schedule on M0.2 shows 2‐FT‐09's, FT‐09B is corrected label.Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

10A Existing Enclosure 10B Existing Enclosure

10C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

12A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

12B Existing Enclosure

12C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

14 Modine TA This location has a an existing thermostat.

Legend Sheet M0.2 Finned Tube Schedule Clarifications

Amendment #8 GAOA Timberline Lodge Boilers 5/27/2021

15A Existing Enclosure 15B Existing Enclosure

15C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

15D Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

17 Existing Enclosure

17B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

18A Modine TA This area needs sensor, control wiring and valve 18B Modine TA This area needs sensor, control wiring and valve 18C Modine TA This area needs sensor, control wiring and valve

22A Existing Enclosure Not shown on M0.2: Sheet M2.1 note 16, Provide new space temperature sensor

22B Custom

Not shown on M0.2: Sheet M2.1 note 16, Provide new space temperature sensor.

Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

23 Custom

Not shown on M0.2: Sheet M2.1 note 16, Provide new space temperature sensor.

Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

24 Custom

Not shown on M0.2: Sheet M2.1 note 16, Provide new space temperature sensor.

Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

25 Custom

Not shown on M0.2: Sheet M2.1 note 16, Provide new space temperature sensor.

Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

26 Modine TA Not shown on M0.2: Sheet M2.1 note 16, Provide new space temperature sensor.

27 Custom

This area needs sensor, control wiring and valve. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall.

Similar to existing convector in same space.

28 Modine TA Needs sensor, control wiring and valve 60 Existing Enclosure Needs sensor, control wiring and valve

62A Existing Enclosure, Stair 62 Needs sensor, control wiring and valve 62B Existing Enclosure, Stair 62 Needs sensor, control wiring and valve 50A Existing Enclosure, Corridor 50 Needs sensor, control wiring and valve 50B Existing Enclosure, Corridor 50 Needs sensor, control wiring and valve

101A Existing Enclosure 101B Existing Enclosure 101C Existing Enclosure

101D Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

102A Existing Enclosure 102B Existing Enclosure 102C Existing Enclosure

102D Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

105 Existing Enclosure

105B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

106 Existing Enclosure

106B Custom

Not shown on M0.2: Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

107A Existing Enclosure 107B Existing Enclosure

107C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

108A Existing Enclosure 108B Existing Enclosure

108C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

109A Existing Enclosure

109B Custom

Not shown on M0.2: Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

109C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

110A Existing Enclosure 110B Existing Enclosure

110C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

111 Existing Enclosure

111B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

112 Existing Enclosure

112B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

114A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

114B Existing Enclosure 115A Custom

115B Existing Enclosure Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

116 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

117 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

118 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

119A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low

119B Existing Enclosure

120A Custom opening and high grille in wall. Similar to existing convector in same space.

120B Existing Enclosure

121A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

121B Existing Enclosure 124 Existing Enclosure

124B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

127 Existing Enclosure 128 Existing Enclosure

134 Existing Enclosure

Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure.

Sensor to be used for space temperature and control of the heating water control valve.

135 Existing Enclosure

Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure.

Sensor to be used for space temperature and control of the heating water control valve.

136 Existing Enclosure

Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure.

Sensor to be used for space temperature and control of the heating water control valve.

150A Corridor 150, Existing Enclosure Needs sensor, control wiring and valve 150B Corridor 150, Existing Enclosure Needs sensor, control wiring and valve 150C Corridor 150, Existing Enclosure Needs sensor, control wiring and valve 160A Stairwell 160, Existing Enclosure Needs sensor, control wiring and valve 160B Stairwell 160, Existing Enclosure Needs sensor, control wiring and valve 161 Stairwell 161, Existing Enclosure Needs sensor, control wiring and valve

HH‐1A Existing Enclosure

Not shown on sheet M0.2:Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure. Sensor to be used for space temperature and control of the heating water control valve.

HH‐1B Existing Enclosure

Not shown on sheet M0.2:Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure. Sensor to be used for space temperature and control of the heating water control valve.

HH‐1C Existing Enclosure

Not shown on sheet M0.2:Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure. Sensor to be used for space temperature and control of the heating water control valve.

HH‐1D Existing Enclosure

Not shown on sheet M0.2:Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure. Sensor to be used for space temperature and control of the heating water control valve.

201A Existing Enclosure 201B Existing Enclosure

201C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

202A Existing Enclosure 202B Existing Enclosure

202C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

203 Custom

This location has a an existing thermostat. Not shown on M0.2: Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

203B Custom

204 Existing Enclosure

204B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

205A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

205B Existing Enclosure

205C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

206A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

206B Existing Enclosure

206C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

207A Existing Enclosure 207B Existing Enclosure

207C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

208A Existing Enclosure 208B Existing Enclosure

208C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

209 Existing Enclosure

209B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

210 Existing Enclosure

210B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

211A 211B Existing Enclosure

211C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

212 Existing Enclosure

212B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

214A Existing Enclosure 214B Existing Enclosure 214C Existing Enclosure

215 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

215B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

216 Existing Enclosure

216B Custom

217A Custom opening and high grille in wall. Similar to existing convector in same space.

217B Existing Enclosure 218A Existing Enclosure 218B Existing Enclosure

218C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

219A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

219B Existing Enclosure 220 Existing Enclosure

220B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

221 Existing Enclosure

221B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

222 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

223 Existing Enclosure

223B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

224A Existing Enclosure 224B Existing Enclosure

224C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

225 Existing Enclosure 225B Custom 226 Existing Enclosure

226B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

227 Existing Enclosure

227B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

228A Existing Enclosure 228B Existing Enclosure

228C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

229A Existing Enclosure 229B Existing Enclosure

229C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

230 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

231 Existing Enclosure 236A Existing Enclosure Needs sensor, control wiring and valve

236B Existing Enclosure Needs sensor, control wiring and valve 237A Existing Enclosure Needs sensor, control wiring and valve 237B Existing Enclosure Needs sensor, control wiring and valve 238A Existing Enclosure Needs sensor, control wiring and valve 238B Existing Enclosure Needs sensor, control wiring and valve 250A Corridor 250, Existing Enclosure Needs sensor, control wiring and valve 250B Corridor 250, Existing Enclosure Needs sensor, control wiring and valve 250C Corridor 250, Existing Enclosure Needs sensor, control wiring and valve 251 Corridor 251, Existing Enclosure Needs sensor, control wiring and valve

260A Stair 260, Existing Enclosure Needs sensor, control wiring and valve 260B Stair 260, Existing Enclosure Needs sensor, control wiring and valve

261 Stair 261, Custom

Not shown on M0.2: Sheet M2.2, note 9: Provide Duct probe temperature sensor at bottom of enclosure. Sensor to be used for space temperature and control of the heating water control valve. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

262 Stair 262, Existing Enclosure Needs sensor, control wiring and valve 301A Existing Enclosure 301B Existing Enclosure 301C Existing Enclosure

301D Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

302A Existing Enclosure 302B Existing Enclosure 302C Existing Enclosure

302D Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

303A Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

303B Existing Enclosure 304 Existing Enclosure

304B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

305A Existing Enclosure 305B Existing Enclosure

305C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

306A Existing Enclosure

306B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

307A Existing Enclosure 307B Existing Enclosure

307C Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

308A Existing Enclosure 308B Existing Enclosure

308C Custom

309 Custom

This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

309B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

310 Existing Enclosure

310B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

311 Existing Enclosure

311B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

312 Existing Enclosure

312B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

314 Existing Enclosure

314B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

315 Custom

Not shown on M0.2:This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

315B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

316 Custom

Not shown on M0.2: This location has a an existing thermostat. Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

316B Custom Note 3: Create new finned tube convector with sheet metal enclosure in wall. Low opening and high grille in wall. Similar to existing convector in same space.

350A Corridor 350, Existing Enclosure Needs sensor, control wiring and valve 350B Corridor 350, Existing Enclosure Needs sensor, control wiring and valve 351 Corridor 351, Existing Enclosure Needs sensor, control wiring and valve 360 Stair 360, Existing Enclosure Needs sensor, control wiring and valve

2021-05-27T11:52:44-0700
DARCY RAPOZA

File details come from the government source that posted it. Updated .