MainAndWyEastDayLodge-Drawings-20210426.pdf
PDF 26 MB Posted
- Attached to
- GAOA Timberline Lodge Boiler
- Solicitation number
- 1240BH21R0014
About this file
This solicitation is for a boiler replacement project at Timberline Lodge on Mt. Hood National Forest. The Forest Service is seeking bids to remove two existing steam boilers and install new hot water boilers along with associated piping, pumps, controls and electrical work. The project will be completed in four phases over multiple years, with an estimated total value over $10 million. Phase 1 involves installing a new 2,000 MBH boiler by October 2021 along with related equipment. Optional phases 2-4 would replace additional boilers and install radiators between 2022-2023. Bids are due by May 2021 with work expected to be completed within 120-150 days of each phase start date. Interested parties must register in the System for Award Management to be eligible for award.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALLACE
WESTBROOK
Digitally signed by WALLACE
WESTBROOK
Date: 2021.01.27 12:57:14 -08'00'
RICHARD
PERIMAN
Digitally signed by RICHARD
PERIMAN
Date: 2021.01.28 09:38:19 -08'00'
Thomas G.
Snoberger
Digitally signed by Thomas G.
Snoberger Date: 2021.02.01 08:16:56 -08'00'
CHRISTY
DARDEN
Digitally signed by
CHRISTY DARDEN
Date: 2021.02.08 13:40:35 -08'00'
KRISTIN
AUSTIN
Digitally signed by KRISTIN
AUSTIN
Date: 2021.01.26 11:49:55 -08'00'
CONSTRUCTION SET -- 11/13/2018
BOILER REPLACEMENT
27500 W. LEG RD,TIMBERLINE LODGE
TIMBERLINE LODGE
OR 97028
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
E R
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
T1.1
TITLE SHEET
DRAWING
INDEX
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
AD2.1
GROUND
FLOOR DEMO
PLAN
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
AD2.2
FIRST FLOOR
DEMO PLAN
ELEVATOR
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
AD2.3
SECOND
FLOOR DEMO
PLAN
ELEVATOR
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
AD2.4
THIRD
FLOOR DEMO
PLAN
A8.1
DETAILS
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
A8.2
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
A8.3
SHEET INDEX
GENERAL MECHANICAL NOTES
Abbreviations
Control Symbols
Dampers
Diffusers and Grilles
CD-1
12x12
Ductwork Fittings
General
Piping Fittings, Appurtenances and Equipment
Piping Systems
Piping Valves
MECHANICAL SYMBOL LIST
CONSTRUCTION PHASING FOR HVAC
PHASE ONE - DEMOLITION
1. DEMOLISH FINNED TUBE CONVECTORS AND ASSOCIATED PIPING INDICATED ON DEMO
PLAN. DEMOLISH C.S. PRICE WING SNOW MELT HEAT EXCHANGER, ASSOCIATED PIPING
AND ACCESSORIES.
PHASE ONE - RENOVATION
1. PROVIDE HEATING WATER BOILER B-1, HEATING WATER PUMP HWP-1, ASSOCIATED
PIPING AND ACCESSORIES AS SPECIFIED AND AS SHOWN ON DRAWINGS.
2. PROVIDE FINNED TUBE CONVECTORS AS SHOWN ON THE DRAWINGS.
PHASE TWO - DEMOLITION
1. DEMOLISH FINNED TUBE CONVECTORS AND ASSOCIATED PIPING INDICATED ON DEMO
PLAN. DEMOLISH C.S PRICE WING HEAT EXCHANGER, FRONT STEP SNOW MELT HEAT
EXCHANGER, ASSOCIATED PIPING AND ACCESSORIES.
PHASE TWO - RENOVATION
1. PROVIDE HEATING WATER BOILER B-2, HEATING WATER PUMP HWP-2, ASSOCIATED
PIPING AND ACCESSORIES AS SPECIFIED AND AS SHOWN ON DRAWINGS.
2. PROVIDE FINNED TUBE CONVECTORS AS SHOWN ON THE DRAWINGS.
PHASE THREE - DEMOLITION
1. DEMOLISH DOMESTIC HOT WATER HEAT EXCHANGERS, POOL HEAT EXCHANGER, SPA HEAT
EXCHANGER, POOL SNOW MELT HEAT EXCHANGER AND KITCHEN MAKE-UP AIR UNIT, ASSOCIATED
PIPING AND ACCESSORIES.
PHASE THREE - RENOVATION
1. PROVIDE HEATING WATER BOILER B-3 AND ASSOCIATED PIPING, ACCESSORIES AS
SPECIFIED AND AS SHOWN ON DRAWINGS.
2. PROVIDE POOL HEAT EXCHANGER, SPA HEAT EXCHANGER, ASSOCIATED PIPING AND ACCESSORIES AS SPECIFIED AND SHOWN ON DRAWINGS. CONNECT TO POOL SNOW MELT AND KITCHEN MAKE-UP AIR
UNIT.
3. PROVIDE FINNED TUBE CONVECTORS AND FAN COILS AS SHOWN ON THE DRAWINGS.
SYMBOL LIST AND
GENERAL NOTES -
HVAC
JS
M0.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
SCHEDULES -
HVAC
JS
M0.2
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
JS
M0.3
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
SHEET KEYNOTES
1 DEMOLITION - BASEMENT FLOOR PLAN - HVAC
DEMOLITION
BASEMENT FLOOR
PLAN -
HVAC
JS
MD2.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
SHEET KEYNOTES
1 DEMOLITION - GROUND FLOOR PLAN - HVAC
DEMOLITION
GROUND FLOOR
PLAN -
HVAC
JS
MD2.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
SHEET KEYNOTES
1 DEMOLITION - FIRST FLOOR PLAN - HVAC
DEMOLITION
FIRST FLOOR PLAN
- HVAC
JS
MD2.2
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
SHEET KEYNOTES
1 DEMOLITION - SECOND FLOOR PLAN - HVAC
DEMOLITION
SECOND FLOOR
PLAN -
HVAC
JS
MD2.3
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
1 DEMOLITION - THIRD FLOOR PLAN - HVAC
DEMOLITION
THIRD FLOOR
PLAN -
HVAC
JS
MD2.4
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
BASEMENT
THIRD
FLOOR
WEST
ATTIC
SECOND
FLOOR
HEADHOUSE ATTIC
EAST
ATTIC
FIRST
FLOOR
GROUND
FLOOR
PHASE ONE
PHASE ONE
PHASE ONE
PHASE TWO
PHASE THREE
PHASE TWO
PHASE THREE
PHASE THREE
PHASE THREE
RISER DIAGRAM -
HVAC
AS
M5.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
DETAILS -
JS
M6.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
Abbreviations
Control Symbols
General
Piping Fittings
Piping Systems
Valves
PLUMBING SYMBOL LIST CONSTRUCTION PHASING FOR PLUMBING
PHASE ONE - DEMOLITION
1. ALL DOMESTIC WATER SERVICES AND EQUIPMENT WILL REMAIN IN OPERATION.
PHASE ONE - RENOVATION
1. REPLACE ALL FUEL OIL PIPING SERVING EXISTING AND NEW BOILERS. REPLACE THE FUEL OIL PUMPS.
PHASE TWO - DEMOLITION
1. NO PHASE TWO DEMOLITION
2. ALL DOMESTIC WATER SERVICES AND EQUIPMENT WILL REMAIN IN OPERATION.
PHASE TWO - RENOVATION
1. MAKE FINAL FUEL OIL CONNECTION TO THE NEW BOILER.
PHASE THREE - DEMOLITION
1. REMOVE EXISTING STEAM/WATER HEAT EXCHANGERS. ALSO REMOVE THE ELECTRIC WATER HEATER.
2. REMOVE CONDENSATE RECEIVER AND PUMPS. ALSO SHOWN “MD-2.0”.
3. REMOVE ASSOCIATED WATER PIPING AND INSULATION SERVING THE EQUIPMENT.
PHASE THREE - RENOVATION
1. INSTALL BOTH WATER HEATER SKIDS, SPH-1 & SPH-2. ALSO, INSTALL THE CONTROL SKID, DTP-1.
2. PROVIDE INTERCONNECTION PIPING BETWEEN THE THREE SKIDS.
3. INSTALL INTERCONNECTING PIPING BETWEEN THE SKIDS AND THE BUILDING POCS.
4. FLUSH PIPING AND ADJUST ELECTRONIC MIXING VALVE ASSEMBLIES AND CIRCULATION PUMPS. BLEED AIR FROM SYSTEM.
5. INSTALL WASTE, WATER, AND STEAM PIPING SUPPORTING THE KITCHEN STEAM GENERATOR. MAKE FINAL SERVICE CONNECTIONS TO THE GENERATOR. TEST THE BACKFLOW PREVENTER, AND DISINFECT THE WATER SERVICE.
6. DISINFECT ALL NEW DOMESTIC WATER PIPING. FLUSH DISINFECTANT FROM SYSTEM AND PUT INTO OPERATION.
7. MAKE FINAL FUEL OIL CONNECTION TO THE LAST NEW BOILER.
SYMBOL LIST AND
GENERAL NOTES -
PLUMBING
AS
P0.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
SYMBOL LIST AND
GENERAL NOTES -
PLUMBING
P0.2
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
DEMOLITION
BASEMENT FLOOR
PLAN - PLUMBING
JS
PD2.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
1 BASEMENT FLOOR PLAN - PLUMBING
BASEMENT FLOOR
PLAN - PLUMBING
JS
P2.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
1 GROUND FLOOR PLAN - PLUMBING
GROUND FLOOR
PLAN - PLUMBING
AS
P2.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
SHEET KEYNOTES
1 FIRST FLOOR PLAN - PLUMBING
FIRST FLOOR PLAN
- PLUMBING
AS
P2.2
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
2 SKID 2 SCHEMATIC - DTP-1
1 SKID 1 SCHEMATIC - WH-1/SPH-1 & WH-2/SPH-2
WH-1/SPH-1
WH-2/SPH-2
DETAILS -
PLUMBING
JS
P5.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
3 ENLARGED PLUMBING PLAN - BOILER ROOM
SYMBOL LIST AND
GENERAL NOTES -
ELECTRICAL
JS
E0.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
1 DEMOLITION - BASEMENT FLOOR PLAN - ELECTRICAL
DEMOLITION -
BASEMENT FLOOR
PLAN -
ELECTRICAL
JK
ED2.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
DETAIL KEYNOTES
EFOS
EFOSE
DETAIL KEYNOTES
EFOS
EFOSE
1 BASEMENT FLOOR PLAN - ELECTRICAL
BASEMENT FLOOR
PLAN -
ELECTRICAL
JK
E2.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
2 BOILER EMERGENCY SHUTDOWN SCHEMATIC
1 GROUND FLOOR PLAN - HVAC
GROUND FLOOR
PLAN -
ELECTRICAL
JS
E2.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
SHEET KEYNOTES
1 FIRST FLOOR PLAN - HVAC
FIRST FLOOR PLAN
- ELECTRICAL
CL
E2.2
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
N
120Y/208 VOLT, 3Ø, 4W, WYE CONNECTED LOW VOLTAGE POWER SYSTEM
ONE-LINE
DIAGRAM -
ELECTRICAL
JK
E5.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
PANEL
ELECTRICAL
JK
E6.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
T I M
B E
R L
I N
E
L
O D
G E
O
R E
G O
CONSTRUCTION SET -- 11/13/2018
BOILER REPLACEMENT
27500 W. LEG RD,TIMBERLINE LODGE
WY-EAST DAY LODGE
OR 97028
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
A Y
L
O D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
ADAM M. OLSEN
PORTLAND, OREGON
STATE OF OREGON
RE
GI
STERED ARCHITECT
T1.1
TITLE SHEET
DRAWING
INDEX
Connections / Equipment
General
Miscellaneous
Raceways
ELECTRICAL SYMBOL LIST
GENERAL ELECTRICAL NOTES
SYMBOL LIST AND
GENERAL NOTES -
ELECTRICAL
JS
E0.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
1 DEMOLITION - DAY LODGE - FIRST FLOOR - ELECTRICAL
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
DEMOLITION - DAY
LODGE FIRST
FLOOR -
ELECTRICAL
JK
ED2.0
EFOS
EFOSE
DETAIL KEYNOTES
1 DAY LODGE - FIRST FLOOR - ELECTRICAL
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
DAY LODGE FIRST
FLOOR -
ELECTRICAL
JK
E2.0
2 BOILER EMERGENCY SHUT DOWN SCHEMATIC
125A
250V
RK5
120/208V 2 PHASE
400A
250V
RK3
COMBINE PANEL F & F2
INTO ONE PANEL
SEE SHEET 9.XX FOR PANEL
DIRECTORIES
UNKNOWN FEEDER
SIZE??
PANEL"J''
UNKNOWN FEEDER
SIZE??
PANEL 'A'
PANEL 'F2'
LIGHTING
CONTACTOR
LIGHTING
CONTACTOR
LIGHTING
CONTACTOR
LIGHTING
CONTACTOR
400A
3P
NEW
PANEL 'E'
MEASURED FEEDER CURRENTS, SEP. 21, 1995, 3:00PM - 5:00, THURS, 60F TEMP. (WARM TO HOT
AMBIENT CONDITIONS WITH KITCHEN/FOOD SERVICE SHUT DOWN)
N.A.
N.A.19 AMP32 AMP22 AMP
N.A.
N.A.40 AMP22.5 AMP16 AMP
N.A.N.A.30 AMP48 AMP43 AMP
N.A.N.A.19 AMP37 AMP52 AMP
N.A.N.A.72 AMP72 AMP72 AMP
N.A.N.A.85 AMP85 AMP89 AMP
N.A.N.A.150 AMP206 AMP208 AMP
GROUND
N.A.
NEUTRAL
N.A.
PHASE C
490 AMP
PHASE BPHASE A
490 AMP250 AMP
4-350KCM. THW
1-#2 CU. THW GND
IN EACH OF:
TWO 3-1/2" RGC
3-#2 CU. THWN
1-#6 CU. THWN
GND IN NEW
1- 1/4" RGC
3-500KCM CU. THW
1-#3 CU. THW GND
IN EACH OF: 4" RGC
125A
250V
RK5
200A
4PSN
200A
250V
RK5
200A
4PSN
4-#3 CU. THW
1-#6 CU. THW GND
IN 2" RGC
28KW
18400VA
S
S
31750VA
30200VA
800A
3P
ROTATING
58.2KVA
AND
5KW
60A
3P
42400VA
26000VA10KW
37400VA
300KCM CU
300KCM CU
400A
250V
RK3
100A
250V
RK3
WYE DELTAIL CLOSED
RESISTIVE CLOSED
TRANSITION STARTER
3-#2 CU, THWN,
1-#6 CU, THWN
GND IN 1 1/4" EMT
4-#3 CU, THW,
1-#6 CU, GND
2" RGC
FUTURE
100A
480V
22000
FAULT
DUTY
PGE CO
REVENUE
METERING
"A""A"
GFI
M
SS
4-300KCM CU, THW
3-1/2" RGC
4-#3 CU, THW
2" RGC
ELEVATOR
PIT SUMP
PUMP
FS
4-#3/0 CU. THW
1-#4 CU. THW GND
IN 3" RGC
4-#3/0 CU. THW
1-#4 CU. THW GND
IN 3" RGC
1-#2 CU. THW GND
2 SETS OF:
4-250KCW CU. THW
IN 3 1/2" RGC
4-#3/0 CU. THW
1-#4 CU. THW GND
IN 3" RGC
4-#3/0 CU. THW
1-#4 CU. THW GND
IN 3" RGC
4-#6 CU. THW
1-#6 CU. THW GND
IN 2" RGC
BASELER
MODEL:
KR4F
SENSE
VOLTAGE
REGULATOR
POWER
GNDBCA
3-#2 CU, THWN,
1-#6 CU, THWN,
GND IN 1 1/4" RGC
4 MOVING
P0LES
400A
480V
22000
FAULT
DUTY
4 MOVING
P0LES
400A
480V
22000
FAULT
DUTY
4-350KCM CU. THW
1-#2 CU. THW GND
IN EACH OF:
TWO 3-1/2" RGC
2000 AMPHERE, ALSTAN
70 PLATED AL BUS
4-500KCM CU. THW CONTINUOUS
NEUTRAL AND GROUNDED BUSSES
400 AMPHERE, ALSTAN 70 PLATED AL BUS
100A
4PSN
200A
250V
RK5
200A
4PSN
175A
250V
RK5
200A
4PSN
100A
4PSN
SPACE
15 KV
PNLBOARDS
ARE USFS
PROPERTY
3-#2 AL, 15KV TYPE URD
100% CAPACITY, CONCENTRIC
NEUTRAL CABLE, PGE CO
PROPERTY, IN 4"C. CONDUIT
IS US FOREST SERVICE
PROPERTY
4 MOVING
P0LES
100A
480V
22000
FAULT
DUTY
PROVIDE NEW 100AMP
3 POLE, SHUNT TRIP
COIL CLEARING, CKT BKR
IN NEMA 1 ENCLOSURE
WITH GROUND BUS
3-#2THW
1-1/4"C
4-500KCM CU. THW
1-#2 CU. THW GND
4" RGC
90A
3P
4-500KCM CU. THW
1-#2 CU. THW GND
4" RGC
SECT. 2SECT. 1
INCOMING FEEDER 7200Y/12470V
3 PHASE CONCENTRIC NEUTRAL FEEDER
CABLES ARE OWNED AND MAINTAINED BY
PGE CO. IN SEVEN UNDERGROUND DUCTS,
OWNEd BY USFS.
7200Y/12470 VOLT WYE POWER TO
3-167KVA TRANSFORMER VAULT BELOW C.S.
PRICE WING OF TIMBERLINE LODGE
4-500KCM CU
IIN EACH OF:
FIVE 4" PVC C.
FIRE ALARM
CONTROL
ATS#3
ATS#1
ATS#2
ATS#4
PANEL K1A
EXTERIOR WEST
WALKWAY
ENTRY LIGHTS
EXTERIOR WEST
WALKWAY
ENTRY LIGHTS
EXTERIOR
2ND FLR WEST
MEZZ. ENTRY LIGHTS
ARCADE
LIGHTS
ARCADE
LOADING DOCK
NIGHT LIGHTS
PANEL 'B'
100A
250V
RK5
100A
4PSN
SPACE
200A
4PSN
100A
4PSN
120/208V, 3 PHASE,
1800RPM, DIESEL ENGINE
GENERATOR
230 KW, 287 KVA,
GENERATOR
PANEL 'D'PANEL 'C'
N
E
U
T
WEST MOTOR
CONTROL
CENTER
'MCC-W (1)"
EAST MOTOR
CONTROL
CENTER
EMERGENCY
'MCC-E'
PANEL 'K1'
PANEL 'K'
400A
4PSN
400A
250W
RK5
400A
250V
RK5
400A
4PSN
700A
250V
RK5
800A
3P
600A
250V
RK5
600A
4PSN
400A
250V
FRK5
400A
4PSN
N
E
U
T
PANEL 'F'
PANEL 'G'
PANEL 'H'PANEL 'S'
3-#2 AL, 15KV TYPE URD 100% CAPACITY,
CONCENTRIC NEUTRAL CABLE, PGE CO.
PROPERTY, IN 4" CONDUIT.
600A
15KV
4PSN
600A
15KV
4PSN
SPACE
EXISTING THREE 100KVA OIL FILLED,
7200W BY 120/240W SINGLE PHASE
TRANSFORMERS, CONFIGURED AS A 120Y/208 VOLT
TRANSFORMER BANK. TRANSFORMERS
ARE OWNED BY PGE CO. AND LCOATED IN VAULT
ADJACENT TO MECHANICAL FAN ROOM.
300A
250V
RK5
400A
4PSN
GROUND BUS
GOUND BUS
15A
250V
RK5
30A
2PSN
20A
1P
20 HP
220V
3 PHASE
PUMP
CAR LIGHTING/
CONTROL POWER
PASSENGER
ELEVATOR/
CONTROL
UNIT
90A
250V
RK5
100A
3P
NEUTRAL BUS
TTT
30A
15KV
'E'
600A
15KV
4PSN
600A
15KV
4PSN
N
E
U
T
30A
15KV
'E'
1 EXISTING ONE-LINE DIAGRAM
ORIGINAL
PANEL 'E'
ONE-LINE
DIAGRAM -
ELECTRICAL
JK
E5.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
1 ONE-LINE DIAGRAM - DEMOLITION
1 ONE-LINE DIAGRAM - NEW
PANEL
SCHEDULES -
ELECTRICAL
JK
E6.0
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
GENERAL MECHANICAL NOTES
Abbreviations
Ductwork Fittings
General
Piping Fittings, Appurtenances and Equipment
Piping Systems
Piping Valves
MECHANICAL SYMBOL LIST
SYMBOL LIST AND
GENERAL NOTES -
HVAC
JS
M0.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
SCHEDULES AND
DETAILS - HVAC
JS
M0.2
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
1 DEMOLITION - DAY LODGE - FIRST FLOOR - HVAC
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
DEMOLITION - DAY
LODGE FIRST
FLOOR - HVAC
SD
MD2.0
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
DAY LODGE FIRST
FLOOR - HVAC
SD
M2.0
Control Symbols
General
Piping Fittings
Piping Systems
Valves
PLUMBING SYMBOL LIST
SYMBOL LIST AND
GENERAL NOTES -
PLUMBING
JS
P0.1
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
SHEET KEYNOTESGENERAL PLUMBING NOTES
1 DEMOLITION - DAY LODGE - FIRST FLOOR - PLUMBING
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
DEMOLITION - DAY
LODGE - FIRST
FLOOR -
PLUMBING
ZG
PD2.0
1 DAY LODGE - FIRST FLOOR - PLUMBING
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street
Suite 1600
Portland, OR 97204
TEL 503.382.2266
FAX 503.382.2262
www.interfaceengineering.com
2014-0453
NOVEMBER 13, 2018
T I M
B E
R L
I N
E
B
O I L
P
L A
C E
M E
N T
W Y
E
A S
T
D
D
G E
O
R E
G O
N
CONSTRUCTION SET 11/13/2018
DAY LODGE FIRST
FLOOR -
PLUMBING
SD
P2.0
| Main Lodge Combined |
| TIMBERLINEBOILERCOV |
| Main Lodge_ARCHITECTURAL |
| Sheets and Views |
| F-FULL |
| FitF-FULL laser |
| FitF-FULL |
| Timberline - AD2.1 |
| Sheets and Views |
| FULL |
| FitFULL |
| Timberline - AD2.2 |
| Sheets and Views |
| FULL |
| FitFULL |
| Timberline - AD2.3 |
| Sheets and Views |
| FULL |
| FitFULL |
| Timberline - AD2.4 |
| Sheets and Views |
| FULL |
| FitFULL |
| Timberline - A8.1 |
| Sheets and Views |
| FULL |
| FitFULL |
| Timberline - A8.2 |
| Sheets and Views |
| FULL |
| FitFULL |
| Timberline - A8.3 |
| Sheets and Views |
| FULL |
| FitFULL |
| Main Lodge_MECHANICAL |
| 0453_Lodge_M0.2_Layout1 |
| 0453_Lodge_M0.3_Layout1 |
| 0453_Lodge_MD2.0_Layout1 |
| 0453_Lodge_MD2.1_Layout1 |
| 0453_Lodge_MD2.2_Layout1 |
| 0453_Lodge_MD2.3_Layout1 |
| 0453_Lodge_MD2.4_Layout1 |
| 0453_Lodge_M5.1_Layout1 |
| 0453_Lodge_M6.0_Layout1 |
| Main Lodge_PLUMBING |
| 0453_Lodge_P0.2_Layout1 |
| 0453_Lodge_PD2.0_Layout1 |
| 0453_Lodge_P2.0_Layout1 |
| 0453_Lodge_P2.1_Layout1 |
| 0453_Lodge_P2.2_Layout1 |
| 0453_Lodge_P5.0_Layout1 |
| Main Lodge_ELECTRICAL |
| 0453_Lodge_ED2.0_Layout1 |
| 0453_Lodge_E2.0_Layout1 |
| 0453_Lodge_E2.1_Layout1 |
| 0453_Lodge_E2.2_Layout1 |
| 0453_Lodge_E5.0_Layout1 |
| 0453_Lodge_E6.0_Layout1 |
| Day Lodge Combined |
| Wy'East Day Lodge_ARCHITECTURAL |
| Sheets and Views |
| F-FULL |
| FitF-FULL laser |
| FitF-FULL |
| Wy'East Day Lodge_ELECTRICAL |
| 0453_DayLodge_ED2.0_Layout1 |
| 0453_DayLodge_E2.0_Layout1 |
| 0453_DayLodge_E5.0_Layout1 |
| 0453_DayLodge_E6.0_Layout1 |
| Wy'East Day Lodge_MECHANICAL |
| 0453_DayLodge_M0.2_Layout1 |
| 0453_DayLodge_MD2.0_Layout1 |
| 0453_DayLodge_M2.0_Layout1 |
| Wy'East Day Lodge_PLUMBING |
| 0453_DayLodge_PD2.0_Layout1 |
| 0453_DayLodge_P2.0_Layout1 |
File details come from the government source that posted it. Updated .