About this opportunity

The USDA Forest Service is soliciting proposals for the reconstruction of the Guinavah-Malibu Campground and Amphitheatre in Logan Canyon, Utah, under the Great American Outdoors Act (GAOA) funding. The base contract includes constructing a new entrance road and intersection with trailhead parking, building a right turn lane on US Highway 89, removing existing roads and site furnishings, demolishing one toilet building, and constructing a major site sign. Multiple optional bid items are available, including west and east side campground development, asphalt pavement installation, pavilion construction, amphitheater restoration, and an interpretive trail with bulletin boards. Special emphasis is required to protect and retain existing Civilian Conservation Corps (CCC) historical features throughout the site. Proposals are due by August 28, 2025, at 1:00 PM Mountain Time, and will be evaluated using a tradeoff process where technical factors are more important than price.

This opportunity is designated as a total small business set-aside with an estimated contract value between $1,000,000 and $5,000,000. The work must be completed within 365 calendar days of contract award, with an anticipated start date in Fall 2025 or Spring 2026. The contractor must provide both performance and payment bonds for the project. The place of performance is specifically located at the Guinavah-Malibu Campground in Cache County, Utah, within the Uinta-Wasatch-Cache National Forest. Davis-Bacon wage determinations apply to this highway construction project, with prevailing wage rates established for Cache County, Utah. The Forest Service has issued two amendments to the original solicitation, adding a past performance questionnaire requirement and providing answers to technical questions submitted by potential bidders.

Notice text

3 versions

Update #3 · Latest ·

**Amendment 2**

Posting answers to submitted questions.

**Amendment 1**

Adding Attachment 4- Past Performance Questionnaire

Submit a Past Performance Questionnaire for references

The Uinta-Wasatch-Cache National Forest has a need for campground Reconstruction at the Guinavah-Malibu Campground in Logan Canyon, Cache County, Utah

The Guinavah-Malibu site includes a campground, group sites, trailhead, day-use area with picnic sites and a historical amphitheater. Special care to protect and retain existing CCC Historical features throughout the site is required.

Contract Base Bid and Option Item Descriptions

  1. Base:

a.       Constructing a new entrance road and central intersection, with Trailhead Parking, pull-out and kiosk

b.       Construct Right Turn Lane on US HWY 89.

c.       Obliterating All existing roads that are to be removed throughout campground.

d.       Removal All existing site furnishings (tables, concrete slabs, fire rings, water hydrants) throughout campground.

e.       Removal of 1 Slump Block toilet building.

f.       Construct Major Site Sign (Sign and Stone Base) off HWY 89.

  1. West Side Bid Option:

a.       Constructing a new campground "loop", including new road, spurs, restrooms, family units and site furniture.

b.       Realigning existing roads and intersections.

c.       Installing new road signs and campsite unit numbers

d.       Install CXT Toilets

  1. East Side Bid Option:
  1. Constructing a new road and parking areas. Surfaces will be a mix of aggregate types.
  2. Install new bulletin boards.
  3. Constructing a new walk-in camping, a pathway system, signs, and site furniture.
  4. Install CXT Toilets
  1. Asphalt Pavement Option:
  1. Place 3” asphalt pavement on Roads, Parking Areas, and Spurs.
  1. Pavilions Option:
  1. Erect pavilions at group sites.
  2. Construct Group Sites with site furnishings
  1. Amphitheater Restoration Option:
  1. Removal of existing amphitheater seating planks and posts.
  2. Installing new wood plan benches and supports,
  3. Constructing accessible pathway
  4. Constructing new wood stairs
  5. Installing pathway lighting
  6. Construct pavilion with site furnishings
  1. Interpretive Trail with Bulletin Boards Option:
    1. Construct an Interpretive Trail with Single-Panel Bulletin Boards with a roof.

The work anticipated under any contract resulting from the solicitation will be started approximately Fall 2025/Spring 2026

This is a total Small Business set aside.

An additional site visit will not be held.

Update #2 ·

**Amendment 1**

Adding Attachment 4- Past Performance Questionnaire

Submit a Past Performance Questionnaire for references

The Uinta-Wasatch-Cache National Forest has a need for campground Reconstruction at the Guinavah-Malibu Campground in Logan Canyon, Cache County, Utah

The Guinavah-Malibu site includes a campground, group sites, trailhead, day-use area with picnic sites and a historical amphitheater. Special care to protect and retain existing CCC Historical features throughout the site is required.

Contract Base Bid and Option Item Descriptions

  1. Base:

a.       Constructing a new entrance road and central intersection, with Trailhead Parking, pull-out and kiosk

b.       Construct Right Turn Lane on US HWY 89.

c.       Obliterating All existing roads that are to be removed throughout campground.

d.       Removal All existing site furnishings (tables, concrete slabs, fire rings, water hydrants) throughout campground.

e.       Removal of 1 Slump Block toilet building.

f.       Construct Major Site Sign (Sign and Stone Base) off HWY 89.

  1. West Side Bid Option:

a.       Constructing a new campground "loop", including new road, spurs, restrooms, family units and site furniture.

b.       Realigning existing roads and intersections.

c.       Installing new road signs and campsite unit numbers

d.       Install CXT Toilets

  1. East Side Bid Option:
  1. Constructing a new road and parking areas. Surfaces will be a mix of aggregate types.
  2. Install new bulletin boards.
  3. Constructing a new walk-in camping, a pathway system, signs, and site furniture.
  4. Install CXT Toilets
  1. Asphalt Pavement Option:
  1. Place 3” asphalt pavement on Roads, Parking Areas, and Spurs.
  1. Pavilions Option:
  1. Erect pavilions at group sites.
  2. Construct Group Sites with site furnishings
  1. Amphitheater Restoration Option:
  1. Removal of existing amphitheater seating planks and posts.
  2. Installing new wood plan benches and supports,
  3. Constructing accessible pathway
  4. Constructing new wood stairs
  5. Installing pathway lighting
  6. Construct pavilion with site furnishings
  1. Interpretive Trail with Bulletin Boards Option:
    1. Construct an Interpretive Trail with Single-Panel Bulletin Boards with a roof.

The work anticipated under any contract resulting from the solicitation will be started approximately Fall 2025/Spring 2026

This is a total Small Business set aside.

An additional site visit will not be held.

Update #1 ·

The Uinta-Wasatch-Cache National Forest has a need for campground Reconstruction at the Guinavah-Malibu Campground in Logan Canyon, Cache County, Utah

The Guinavah-Malibu site includes a campground, group sites, trailhead, day-use area with picnic sites and a historical amphitheater. Special care to protect and retain existing CCC Historical features throughout the site is required.

Contract Base Bid and Option Item Descriptions

  1. Base:

a.       Constructing a new entrance road and central intersection, with Trailhead Parking, pull-out and kiosk

b.       Construct Right Turn Lane on US HWY 89.

c.       Obliterating All existing roads that are to be removed throughout campground.

d.       Removal All existing site furnishings (tables, concrete slabs, fire rings, water hydrants) throughout campground.

e.       Removal of 1 Slump Block toilet building.

f.       Construct Major Site Sign (Sign and Stone Base) off HWY 89.

  1. West Side Bid Option:

a.       Constructing a new campground "loop", including new road, spurs, restrooms, family units and site furniture.

b.       Realigning existing roads and intersections.

c.       Installing new road signs and campsite unit numbers

d.       Install CXT Toilets

  1. East Side Bid Option:
  1. Constructing a new road and parking areas. Surfaces will be a mix of aggregate types.
  2. Install new bulletin boards.
  3. Constructing a new walk-in camping, a pathway system, signs, and site furniture.
  4. Install CXT Toilets
  1. Asphalt Pavement Option:
  1. Place 3” asphalt pavement on Roads, Parking Areas, and Spurs.
  1. Pavilions Option:
  1. Erect pavilions at group sites.
  2. Construct Group Sites with site furnishings
  1. Amphitheater Restoration Option:
  1. Removal of existing amphitheater seating planks and posts.
  2. Installing new wood plan benches and supports,
  3. Constructing accessible pathway
  4. Constructing new wood stairs
  5. Installing pathway lighting
  6. Construct pavilion with site furnishings
  1. Interpretive Trail with Bulletin Boards Option:
    1. Construct an Interpretive Trail with Single-Panel Bulletin Boards with a roof.

The work anticipated under any contract resulting from the solicitation will be started approximately Fall 2025/Spring 2026

This is a total Small Business set aside.

An additional site visit will not be held.

Files

Notice history

Notice Type Posted
GAOA Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction Award Award Notice
This notice Latest solicitation Solicitation
GAOA Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction Solicitation
GAOA Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest Garden City, Utah, United States · NAICS 237990 Forest Service Total Small Business
GAOA Brainard Lake Recreation Area Deferred Maintenance Ward, Colorado 80481, United States · NAICS 237310 Forest Service Total Small Business
Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF Kamas, Utah 84036, United States · NAICS 115310 Forest Service Total Small Business
Stove Prairie Campground Gate Replacement Bellvue, Colorado, United States · NAICS 237990 Forest Service Total Small Business
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors