Ross Springs Waterline Replacement
Open Solicitation Posted
- Solicitation number
- 1240LT27Q0022
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Utah 84078, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service, through CSA Intermountain Region 8 in Ogden, Utah, is soliciting quotations for the Ross Springs-Red Canyon Waterline Replacement on the Ashley National Forest, with quotes due December 1, 2026. The procurement is a Total Small Business set-aside under NAICS 237110, with a small business size standard of $45 million.
Work is located in the Flaming Gorge Ranger District, Daggett County, Utah, approximately 25 miles southwest of Manila, and the source records the place of performance as Naples, UT 84078. An amendment posted November 10, 2026 extended the quote due date to December 1, 2026 and added a pre-bid meeting on November 18, 2026 at 1:00 PM MST, with Cathleen Christensen (435-650-2336, cathleen.christensen@usda.gov) as contact.
The scope replaces 4,450 linear feet of 4-inch asbestos cement pipe, abandoned in place, with 4-inch HDPE water main compliant with AWWA C901 and C906. It also covers an additional 1,150 linear feet of existing pipeline with imported fill from a government source, installs two combination air-vacuum valves with utility boxes, and adds valves, daylight drains, pumpout drains, and lateral connections. The work requires a minimum 18-inch burial depth, Utah R309-550 compliance, pressure testing at 100-160 psi, and chlorine disinfection at 50 mg/l residual with bacteriological examination. Service to the existing public water system must be maintained, and unplanned interruptions must be restored within 36 hours. Offerors must have relevant experience on at least two similar projects completed within five years and must maintain current SAM registration.
The contract is firm fixed price with one anticipated award and a 90-day performance period from notice to proceed. Quotes must price all line items in the 23-item Schedule of Items and remain firm for 60 calendar days. Bid guarantee is 20 percent of bid price or $3 million, whichever is less. A 100 percent payment bond is due within 15 days of award. A Davis-Bacon wage determination (UT20260025) and Buy American-Construction Materials requirements apply.
Evaluation proceeds in two steps: technical acceptability (Acceptable/Unacceptable), then award to the responsible quoter with the lowest evaluated price among technically acceptable quotes. Technical submissions address relevant experience, schedule capability, and exceptions to the SOW.
Notice text
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals.
- The work includes;
- Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.
- Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.
- Installation of 2 combination air-vacuum valves with utility boxes.
- Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
Files
| File | Type | Posted |
|---|---|---|
| 1240LT27Q0022.pdf | ||
| 1240LT27Q0022.pdf | ||
| C04b 1240LT27Q0022.pdf | ||
| C04a SF-1442 1240LT27Q0022.pdf | ||
| C04b 1240LT27Q0022.pdf | ||
| C04c SOW 1240LT27Q0022.docx | DOCX document | |
| C04b 1240LT27Q0022.pdf | ||
| C04a SF-1442 1240LT27Q0022.pdf | ||
| C04d Plans 1240LT27Q0022.pdf | ||
| C04e WD Daggett County Utah 1240LT27Q0022.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming | Forest Service | Total Small Business | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Bgndrf piping upgrades | Bureau of Reclamation | Total Small Business |