Fort Randall Major Unit Rehabilitation Project
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W9128F21R0005
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Pickstown Sd Usa
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Omaha seeks proposals to rehabilitate eight major hydroelectric generating units at Fort Randall Dam in Pickstown, South Dakota. Proposals are due by May 11, 2021 and will be evaluated based on experience, technical approach, past performance, project execution, small business participation, and price. Site visits were held on January 12-13, 2021 to allow inspection of dewatered units, turbines, generators and spare parts to support contractor evaluations and design.
The solicitation has no set-aside designations and covers NAICS codes 235930 and PSC codes R499 and C451. The incumbent contractor is unknown and no budget or award values are provided. The scope involves refurbishing or replacing turbines over 150 inches, stator windings, wicket gates and other components over a period of three years on site at Fort Randall Dam in Pickstown, South Dakota.
Notice text
17 versions
Update #17 · Latest ·
**04/28/2021: AMENDMENT 0006 POSTED**
**04/09/2021: AMENDMENT 0005 POSTED. PROPOSAL DUE DATE EXTENDED TO 11 MAY 21 AT 2PM CENTRAL TIME. SEE AMENDMENT FOR ADDITIONAL CHANGES.**
**04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134**
**03/29/2021: AMENDMENT 0004 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**
**03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #16 ·
**04/09/2021: AMENDMENT 0005 POSTED. PROPOSAL DUE DATE EXTENDED TO 11 MAY 21 AT 2PM CENTRAL TIME. SEE AMENDMENT FOR ADDITIONAL CHANGES.**
**04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134**
**03/29/2021: AMENDMENT 0004 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**
**03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #15 ·
**04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134**
**03/29/2021: AMENDMENT 0004 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**
**03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #14 ·
**03/29/2021: AMENDMENT 0004 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**
**03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #13 ·
**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**
**03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #12 ·
**03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE**
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #11 ·
**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #10 ·
**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #9 ·
**02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #8 ·
**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED**
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #7 ·
**01/21/2021: AMENDMENT 0001 IS POSTED**
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #6 ·
**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #5 ·
**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #4 ·
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #3 ·
**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #2 ·
**SUMMARY OF CHANGES POSTED**
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Update #1 ·
The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation.
***UPDATED SITE VISIT INFORMATION***
Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.
During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.
Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Files
Show all 35
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fort Randall Major Unit Rehabilitation Project | Award Notice | |
| This notice | Solicitation | |
| Fort Randall Major Unit Rehabilitation Project | Special Notice | |
| Fort Randall Major Unit Rehabilitation Project | Pre-Solicitation | |
| Upper Missouri Basin (UMB) Expansion Coordination Services | Award Notice | |
| Upper Missouri Basin (UMB) Expansion Coordination Services | Solicitation | |
| Upper Missouri Basin (UMB) Expansion Coordination Services | Pre-Solicitation | |
| Industry Day for Fort Randall Unit Rehab | Special Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity