Fort Randall Major Unit Rehabilitation Project

Closed Solicitation Posted

This opportunity was awarded. See its 2 award notices in the notice history.

Solicitation number
W9128F21R0005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Pickstown Sd Usa

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District Omaha seeks proposals to rehabilitate eight major hydroelectric generating units at Fort Randall Dam in Pickstown, South Dakota. Proposals are due by May 11, 2021 and will be evaluated based on experience, technical approach, past performance, project execution, small business participation, and price. Site visits were held on January 12-13, 2021 to allow inspection of dewatered units, turbines, generators and spare parts to support contractor evaluations and design.

The solicitation has no set-aside designations and covers NAICS codes 235930 and PSC codes R499 and C451. The incumbent contractor is unknown and no budget or award values are provided. The scope involves refurbishing or replacing turbines over 150 inches, stator windings, wicket gates and other components over a period of three years on site at Fort Randall Dam in Pickstown, South Dakota.

Notice text

17 versions

Update #17 · Latest ·

**04/28/2021: AMENDMENT 0006 POSTED**

**04/09/2021: AMENDMENT 0005 POSTED.  PROPOSAL DUE DATE EXTENDED TO 11 MAY 21 AT 2PM CENTRAL TIME.  SEE AMENDMENT FOR ADDITIONAL CHANGES.**

**04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134**

**03/29/2021: AMENDMENT 0004 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**

**03/09/2021: AMENDMENT 0003 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #16 ·

**04/09/2021: AMENDMENT 0005 POSTED.  PROPOSAL DUE DATE EXTENDED TO 11 MAY 21 AT 2PM CENTRAL TIME.  SEE AMENDMENT FOR ADDITIONAL CHANGES.**

**04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134**

**03/29/2021: AMENDMENT 0004 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**

**03/09/2021: AMENDMENT 0003 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #15 ·

**04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134**

**03/29/2021: AMENDMENT 0004 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**

**03/09/2021: AMENDMENT 0003 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #14 ·

**03/29/2021: AMENDMENT 0004 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**

**03/09/2021: AMENDMENT 0003 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #13 ·

**03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637**

**03/09/2021: AMENDMENT 0003 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #12 ·

**03/09/2021: AMENDMENT 0003 IS POSTED.  NO EXTENSION TO PROPOSAL DUE DATE**

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #11 ·

**03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245**

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #10 ·

**02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811**

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #9 ·

**02/10/2021: AMENDMENT 0002 IS POSTED.  RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL**

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #8 ·

**01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** 

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #7 ·

**01/21/2021: AMENDMENT 0001 IS POSTED**

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #6 ·

**01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556**

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #5 ·

**01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED**

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #4 ·

**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED**

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #3 ·

**12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)**

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #2 ·

**SUMMARY OF CHANGES POSTED**

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Update #1 ·

The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab.  The solicitation closes on 25 March 2021 at 2pm Central.  The solicitation is Unrestricted and Open to Both Large and Small Business Participation.   

***UPDATED SITE VISIT INFORMATION***

Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.  Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.  Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.  To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. 

During the site visit one unit will be dewatered and penstock open for turbine inspection.  The turbine maintenance platform will be installed.  The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.  The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.  Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection.

Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.

Files

File Type Posted
Am0006 W9128F21R0005.pdf PDF
Am0005 W9128F-21-R-0005.pdf PDF
9104134 StandoffInsulator.pdf PDF
Am0004 W9128F-21-R-0005.pdf PDF
9040123 Penstock 16 inch.JPG JPG image
9045637 Drawings_Headcover Access Inquiry.pdf PDF
9040124 Air Depression Diaphragm Valve 1.jpg JPG image
9040124 Air Depression Diaphragm Valve 2 .jpg JPG image
9040123 Penstock 12 inch valve.JPG JPG image
Am0003 W9128F21R0005 FR MUR.pdf PDF
20210223_093204.jpg JPG image
0250047-PLM.pdf PDF
coc lab_250047.pdf PDF
20210223_093629.jpg JPG image
20210223_092341.jpg JPG image
20210223_091749.jpg JPG image
TMP_Existing Design_Component Overview.pdf PDF
TMP_Existing Design_Drawings.pdf PDF
TMP_Existing Design_Procedure.pdf PDF
Waterway Drawings.pdf PDF
Pages from Generator Test Report - Westinghouse.pdf PDF
Am0002 - W9128F21R0005.pdf PDF
18-C-5325_Stator Coil Windings.pdf PDF
195214A Pressure Tank.pdf PDF
195215A Pressure Tank.pdf PDF
AM0001_W9128F21R0005 - FR MUR.pdf PDF
Water Quality - Fort Randall.pdf PDF
12_13 Jan 21 Fort Randall Site Visit Presentation.pdf PDF
Site Visit Sign-In_13 Jan 21_FR Major Rehab.pdf PDF
Site Visit Sign-In_12 Jan 21_FR Major Rehab.pdf PDF
Part 1 of 2 Fort Randall MUR FINAL_ REFERENCE DRAWINGS 6-25-20.pdf PDF
Part 2 of 2 Fort Randall MUR FINAL_ REFERENCE DRAWINGS 6-25-20.pdf PDF
W9128F21R0005_Summary of Changes_Draft to Final Solicitation.pdf PDF
Fort Randall MUR FINAL_COLOR_ Contract Drawings Review 12-15-20 REDUCED.pdf PDF
Ft Randall Major Unit Rehab W9128F21R0005 Contract Specs .pdf PDF
Show all 35

Notice history

Notice Type Posted
Fort Randall Major Unit Rehabilitation Project Latest Award Notice
This notice Latest solicitation Solicitation
Fort Randall Major Unit Rehabilitation Project Special Notice
Fort Randall Major Unit Rehabilitation Project Pre-Solicitation
Upper Missouri Basin (UMB) Expansion Coordination Services Award Notice
Upper Missouri Basin (UMB) Expansion Coordination Services Solicitation
Upper Missouri Basin (UMB) Expansion Coordination Services Pre-Solicitation
Industry Day for Fort Randall Unit Rehab Original Special Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity