Am0004 W9128F-21-R-0005.pdf
PDF 2 MB Posted
- Attached to
- Fort Randall Major Unit Rehabilitation Project
- Solicitation number
- W9128F21R0005
About this file
This is a solicitation for a major unit rehabilitation project at Fort Randall Dam. The solicitation closes on March 25, 2021 at 2:00 PM Central Time. The project involves refurbishing and replacing components of eight hydroelectric generating units, including Francis turbine runners over 150 inches in diameter, stator windings, stator cores, wicket gates, and other parts. Site visits will be held on January 12-13, 2021 with COVID-19 restrictions and requirements for contractors to submit non-U.S. citizen attendee information in advance. The solicitation is unrestricted and open to both large and small businesses. Offerors must submit technical and price proposals in two volumes following the specified structure and page limits. Evaluation will be based on experience, technical approach, past performance, project execution, small business participation, and price. Award will be made to the responsible offeror providing the best overall value to the government.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0004
Major Unit Rehab, Fort Randall Dam, SD
See attached documentation for content of the amendment revisions
New Date for receipt of Proposals is 20 April 2021 at 2:00 pm (local time)
Government Point of Contact: Jessica Jackson, Contract Specialist (402) 995-2052
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F21R0005
03/29/2021
12/15/2020
Am #0004 - 2 (Continuation SF 30)
29 March 2021 Solicitation No. W9128F21R0005
Date of Issue: 15 December 2020 Date of Receiving Proposals: 20 April 2021
SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package For Major Unit Rehab, Fort Randal Dam, SD.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
1) Section 00 10 00 pages 3 thru 14 are reissued with this amendment.
Changes appear in red; however, Contractors are responsible for reviewing the contents of the entire document.
2) Section 00 10 00 - Appendix A is reissued with this amendment.
Changes appear in red; however, Contractors are responsible for reviewing the contents of the entire document.
3) Section 00 22 00 is reissued with this amendment. Contractors are responsible for reviewing the contents of the entire document. A summary of the changes are as follows.
Paragraph 11.1, Table 00115-1, change following columns heading:
4th Column, change Epeak to Emidrange
5th Column, change Ppeak to Pmidrange
Table definitions, delete previous text for numbers 3 and 4, insert the following definitions:
3) Emidrange is the turbine efficiency at the specified power (Pmidrange) for a given head.
4) Pmidrange is a specified power output between minimum and maximum power outputs for a give head.
Weighted Efficiency Formula, change formula to read:
Weighted Efficiency (FR) = 0.005*Emin97 + 0.022*Emin110 + 0.049*Emin120 + 0.022*Emin130 + 0.002*Emin136 + 0.000*Emin142 + 0.025*Emid97 + 0.110*Emid110 + 0.245*Emid120 + 0.110*Emid130 + 0.010*Emid136 + 0.000*Emid142 + 0.020*Emax97 + 0.088*Emax110 + 0.196*Emax120 + 0.088*Emax130 + 0.008*Emax136 + 0.000*Emax142
Paragraph 13.1, line 4, Change sentence to “The PMP shall be limited to no more than 75 pages; therefore, any content beyond page 75 will not be evaluated.”
Paragraph 13.1.2, second paragraph:
Am #0004 - 3
After the first sentence, insert the sentence “A Gantt chart size of 11x17 is acceptable. Each 11x17 page will be counted as one (1) page.”
Last sentence, change non-binding Contract Notice to Proceed (NTP) date to October 13, 2021.
4) Section 01 22 00.00 10 is reissued with this amendment. A summary of the changes are as follows. However, Contractors are responsible for the contents of the specification.
Paragraph 1.2.82.1, replace “weighted milestone schedule” with “cost loaded schedule.”
Paragraph 1.3.71, Update CLIN description to be: Refurbish Thrust Bearing Shoes – Including Babbitting (Installed and Spares). Updated to include babbitting scope of work.
Add the following CLINS starting at paragraph 1.3.128 (CLIN 0076)
CLIN 0076, Price Item 7601: Rework Split Faces, Furnish Radial Keys and Perform Keyway Work, and Furnish New Bolts For Thrust Runner
CLIN 0077, Price Item 7701: Machine Backside of Thrust Bearing Shoes Set (Installed and Spares)
CLIN 0078, Price Item 7801: Machine Babbitt face of Thrust Bearing Shoes Set (Installed and Spares)
CLIN 0079, Price Item 7901: Paint Thrust Bearing Platform - 8 Each
Update the following CLINS:
All Remaining Work updated to CLIN 0080, Price Item 8001 Refurbish Field Pole Shipping updated to CLIN 0081, Price Item 8101
5) Section 48 13 13.00 26 page 15, delete paragraph 3.1.11.d and substitute the following:
“d. When operating at plant sigma, the magnitude of the peak-to-peak draft tube pulsations in the model water passage without air admission shall be measured at each individual sensor over the range of head and power levels defined in Table 3 of SECTION 48 13 13.01 26, unless otherwise approved. For power outputs less than 70% of the defined Maximum Power column in Table 3, the measured peak-to-peak pressure pulsations shall not exceed 13.5% of the 120 feet net head. For power outputs greater than 70% of the defined Maximum Power column in Table 3, the measured peak-to-peak pressure pulsations shall not exceed 9% of the 120 feet net head. This limit applies to the reading taken with and without air admission. Pressure pulsations shall be evaluated in the time domain and shall equal the total pressure pulsation amplitude in feet divided by 120 feet and multiplied by 100%.”
6) Section 48 13 13.04 26 page 19, paragraph 3.13, delete the existing paragraph and replace with the following:
“3.13 WICKET GATE REFURBISHMENT (OPTIONAL)
Am #0004 - 4
At the option of the Government, the existing wicket gates shall be refurbished. One set of new OEM designed wicket gates shall be fabricated within this option and shall be used in the first unit assembly and as spares for the powerhouse. The existing wicket gates from that first unit shall be refurbished to be used in the second unit reassembly. The existing wicket gates from the second unit shall be refurbished to be used in the third reassembly. This pattern will continue for the remaining units.”
7) Section 48 13 16.00 26 page 7, paragraph. 1.3, Under SD-02 revise the following submittals:
“Within 120 calendar days after receipt of written Notice to Proceed (NTP) for the rotor pole refurbishment:
Rotor Pole Assembly and Details; G, HDC
Rotor Pole Connections Assembly and Details; G, HDC"
8) Section 48 13 16.00 26 page 42, paragraph 3.25.2, Line 8, update CLIN reference to read “(CLIN 0081, Price Item 8101)”
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Proposals are to be submitted electronically as described in Section 00 22 00 PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS AND
EVALUATION.
4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 20 April 2021, as stated in the Request For Proposal.
Attachments: 00 10 00 pages 3 thru 14, Appendix A, Section 00 22 00, Section 01 22 00.00 10.
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
29 Mar 2021
MFS/2184
CLIN
Price Item
Description Quantity Unit
Measure Unit Price Amount
0001 0101 Design and Test Hydraulic Turbine Model 1 Job XXX $______________
0002 0201 Disassemble Generating Unit, Including Inspections of Components - 6 Each
1 Job XXX $______________
0202 Reassemble Generating Unit - 6 Each 1 Job XXX $______________
0203 Operational Testing After Reassembly - 6 Each 1 Job XXX $______________
0003 0301 Furnish Francis Turbine Runner - 6 Each 1 Job XXX $______________
0302 Furnish New Thrust Bearing Screw Jack 1 Job XXX $______________
0303 Pre-Disassembly Investigation - 6 Each 1 Job XXX $______________
0304 Line Bore Wicket Gate Stem Housing - 6 Each 1 Job XXX $______________
0305 Inspect Stay Ring - 6 Each 1 Job XXX $______________
0306 Furnish Stationary Sealing Rings - 6 Sets 1 Job XXX $______________
0307 Refurbish Headcover - 6 Each 1 Job XXX $______________
Refurbish Turbine Guide Bearing Housing and Head Cover Extension - 6 Each
1 Job XXX $______________
0309 Refurbish Bottom Ring - 6 Each 1 Job XXX $______________
0310 Refurbish Turbine Air Inlet Valve - 6 Each 1 Job XXX $______________
Furnish and Install All Self-Lubricating Bushings and Bearing Plates - 6 Each
1 Job XXX $______________
Perform Wicket Gate Operating Mechanism Analysis
1 Job XXX $______________
Fort Randall Major Unit Rehab, Fort Randall, SD FRE2
SECTION 00 10 00
Pricing Schedule
BASE ITEMS
TOTAL CLIN 0002
SECTION 00 10 00
(Am0004)
Furnish and Install Turbine Shaft Sleeve - 6 Each
1 Job XXX $______________
0314 Manufacture Spare Turbine Shaft Sleeve 1 Job XXX $______________
0315 Furnish Spare Wicket Gate Stem Seal - 1 Set 1 Job XXX $______________
Furnish Spare Servomotor Packing Box Stem Seals
- 1 Set
1 Job XXX $______________
0317 Refurbish Operating Ring - 6 Each 1 Job XXX $______________
0318 Inspect Turbine and Generator Shaft - 6 Each 1 Job XXX $______________
0319 Machine Turbine Shaft - 6 Each 1 Job XXX $______________
Furnish and Install Main Turbine Shaft Packing Box - 6 Each
1 Job XXX $______________
0321 Refurbish Wicket Gate Servomotor - 6 Sets 1 Job XXX $______________
0322 Inspect Thrust Runner Phase 1 - 6 Each 1 Job XXX $______________
0323 Inspect Thrust Bearing Shoe Phase 1 - 6 Sets 1 Job XXX $______________
Refurbish Turbine Guide Bearing (Installed and Spares) - 8 Each
1 Job XXX $______________
Inspect Turbine Guide Bearing Oil Pumps/Motor System 6 Each
1 Job XXX $______________
Furnish and Install Turbine Guide Bearing Oil Piping, Valves, and Filters - 6 Each
1 Job XXX $______________
Inspect, Clean, and Pressure Test Generator Air Coolers - 6 Sets
1 Job XXX $______________
Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly - 6 Each
1 Job XXX $______________
Furnish and Install the 6 Inch Cooling Water Strainer - 6 Each
1 Job XXX $______________
Furnish and Install the 6 Inch Cooling Water Valves - 6 Sets
1 Job XXX $______________
Replace Depression Air Diaphragm Valves - 6 Each
1 Job XXX $______________
0332 Provide Boring Bar 1 Job XXX $______________
Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces - 6 Each
1 Job XXX $______________
SECTION 00 10 00
0334 Inspect Spiral Case - 6 Each 1 Job XXX $______________
Inspect Discharge Ring and Draft Tube Liner - 6 Each
1 Job XXX $______________
0336 Inspect and Repair Piezometer Tap - 6 Each 1 Job XXX $______________
Replace 8-Path Penstock Flow Meter Transducers and Wiring - 4 Each
1 Job XXX $______________
Replace 4-Path Penstock Flow Meter Transducers and Wiring - 2 Each
1 Job XXX $______________
0339 Replace Runner Coupling Fasteners - 6 Sets 1 Job XXX $______________
Inspect and Test High Pressure Lift System - 6 Each
1 Job XXX $______________
0341 Furnish Hydraulic Jacking System - 6 Each 1 Job XXX $______________
Furnish and Install Vibration Monitoring System
- 6 Each
1 Job XXX $______________
Replace Turbine Pit Platform Decking and Stairway Steps - 6 Each
1 Job XXX $______________
Furnish Thrust Bearing Oil Cooler Assembly - 7 Each
1 Job XXX $______________
Furnish and Install Accumulator Tank and Associated Equipment - 6 Each
1 Job XXX $______________
Furnish and Install Turbine Pit Piping and Associated Equipment - 6 Each
1 Job XXX $______________
Measure Penstock Geometry and Report Flow Meter Paths - 6 Each
1 Job XXX $______________
Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare) - 7 Sets
1 Job XXX $______________
Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare) - 7 Sets
1 Job XXX $______________
Replace Upper Generator Guide Bearing Oil Fill Pipe - 6 Each
1 Job XXX $______________
0351 Inspect Generator Brake Rings - 6 Each 1 Job XXX $______________
0352 Replace Headcover Condensing Piping - 6 Each 1 Job XXX $______________
Furnish and Install Penstock Drain Valves - 12 Each
1 Job XXX $______________
Furnish and Install Thrust Bearing Cooler Actuators and Valves - 6 Sets
1 Job XXX $______________
SECTION 00 10 00
0355 Flush and Clean Headers and Oil Tanks 1 Job XXX $______________
0356 Flush and Clean Unit Piping and Tanks - 6 Each 1 Job XXX $______________
0357 Painting - 6 Each 1 Job XXX $______________
0004 0401 Re-Establish Stator Center - 6 Each 1 Job XXX $______________
Design Stator Core Assembly, Furnish Stamping Die, Furnish One Complete Stator Core Assembly
1 Job XXX $______________
Remove Existing Stator Core, Install and Test New Stator Core - One Generator Unit
1 Job XXX $______________
Furnish Complete Set of Stator Coils, Supplies, and Accessories - 6 Each
1 Job XXX $______________
Manufacture Prototype Coils Identical to Production Coils and Perform Prototype Testing
1 Job XXX $______________
Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils
1 Job XXX $______________
0407 Furnish Spare Generator Parts 1 Job XXX $______________
Replace Three Generator Neutral Current Transformers - 6 Each
1 Job XXX $______________
0409 Remove Stator Winding - 6 Each 1 Job XXX $______________
0410 Inspect, Clean, and Test Stator Core - 6 Each 1 Job XXX $______________
0411 Inspect, Clean, and Test Rotor - 6 Each 1 Job XXX $______________
0412 Install and Test Stator Winding - 6 Each 1 Job XXX $______________
Replace All Rotor Field Lead Bus Supports on a Per Unit Basis - 6 Each
1 Job XXX $______________
0414 Perform Special Field Tests 1 Job XXX $______________
0415 Perform Model Validation Testing 1 Job XXX $______________
0416 Perform Miscellaneous Electrical Work - 6 Each 1 Job XXX $______________
TOTAL CLIN 0003
TOTAL CLIN 0004
SECTION 00 10 00
0005 0501 All Remaining Work 1 Job XXX $______________
0006 0601 Furnish New Oil Est.
29,700
Gal $__________ $______________
0007 0701 Remove On-Site Lead-Based Paint Est.
12,000
Sq Ft $__________ $______________
0008 0801 Dispose of Oil Est.
29,900
Gal $__________ $______________
Economic Price Adjustment (EPA)
FFP
1 Lot XXX
0010 1001 Disassemble Generating Unit, Including Inspections of Components- 2 Each
1 Job XXX $______________
1002 Reassemble Generating Unit- 2 Each 1 Job XXX $______________
1003 Operational Testing After Reassembly- 2 Each 1 Job XXX $______________
OPTIONAL PRICING ITEMS
These items may be exercised up to the totals stated below per item or not at all at the discretion of the Government.
TOTAL BASE BID
The following CLIN/PRICE ITEMS are ESTIMATED QUANTITIES. These will be administered in accordance with the Variation in Estimated Quantity Clause 52.211-18.
The following CLIN/PRICE ITEMS is a LOT pricing item to be used for Economic Price Adjustment purposes. This CLIN will be administered in accordance with the Economic Price Adjustment Clause 52.216-2
0009 0901
Not Separately Priced
PROJECT NO.: _______
FOB: Destination
PURCHASE REQUEST NUMBER: ____________
The Government will make an EPA (limited to the Stainless Steel, Steel (Cold-Rolled and Standard Plate), and Copper) for the turbine runner, stator core, and stator windings as detailed in the EPA Clause. The Contractor shall fill in the following information with the exception of the index to be used:
Stainless Steel: $__________/lb.
Total number of pounds of Stainless Steel: __________ lbs.
Total cost of Stainless Steel: $__________ Steel Index that shall be used to calculate the EPA for Stainless Steel:
WPU101508 (Bureau of Labor Statistics)
Steel: $__________/lb.
Total number of pounds of Steel: __________ lbs.
Total cost of Steel: $__________ Steel Index that shall be used to calculate the EPA for Steel:
WPU101707 (Cold Rolled Steel Sheet and Strip - Bureau of Labor Statistics)
Copper: $__________/lb.
Total number of pounds of copper: __________ lbs.
Total cost of copper: $__________ Copper Index that shall be used to calculate the EPA:
WPU102403 (Secondary copper, Alloyed and Unalloyed - Bureau of Labor Statistics)
SECTION 00 10 00
0011 1101 Furnish Francis Turbine Runner- 2 Each 1 Job XXX $______________
1102 Pre-Disassembly Investigation- 2 Each 1 Job XXX $______________
1103 Line Bore Wicket Gate Stem Housing- 2 Each 1 Job XXX $______________
1104 Inspect Stay Ring - 2 Each 1 Job XXX $______________
1105 Furnish Stationary Sealing Rings - 2 Sets 1 Job XXX $______________
1106 Refurbish Headcover - 2 Each 1 Job XXX $______________
Refurbish Turbine Guide Bearing Housing and Head Cover Extension - 2 Each
1 Job XXX $______________
1108 Refurbish Bottom Ring - 2 Each 1 Job XXX $______________
1109 Refurbish Turbine Air Inlet Valve - 2 Each 1 Job XXX $______________
Furnish and Install All Self-Lubricating Bushings and Bearing Plates - 2 Each
1 Job XXX $______________
Furnish and Install Turbine Shaft Sleeve - 2 Each
1 Job XXX $______________
1112 Refurbish Operating Ring - 2 Each 1 Job XXX $______________
1113 Inspect Turbine and Generator Shaft - 2 Each 1 Job XXX $______________
1114 Machine Turbine Shaft - 2 Each 1 Job XXX $______________
Furnish and Install Main Turbine Shaft Packing Box- 2 Each
1 Job XXX $______________
1116 Refurbish Wicket Gate Servomotor- 2 Sets 1 Job XXX $______________
1117 Inspect Thrust Runner Phase 1 - 2 Each 1 Job XXX $______________
1118 Inspect Thrust Bearing Shoe Phase 1 - 2 Sets 1 Job XXX $______________
Refurbish Turbine Guide Bearing (Installed and Spares)- 2 Each
1 Job XXX $______________
Inspect Turbine Guide Bearing Oil Pumps/Motor System - 2 Each
1 Job XXX $______________
TOTAL CLIN 0010
SECTION 00 10 00
Furnish and Install Turbine Guide Bearing Oil Piping, Valves, and Filters - 2 Each
1 Job XXX $______________
Inspect, Clean, and Pressure Test Generator Air Coolers - 2 Sets
1 Job XXX $______________
Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly - 2 Each
1 Job XXX $______________
Furnish and Install the 6 Inch Cooling Water Strainer - 2 Each
1 Job XXX $______________
Furnish and Install the 6 Inch Cooling Water Valves - 2 Sets
1 Job XXX $______________
Replace Depression Air Diaphragm Valves - 2 Each
1 Job XXX $______________
Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces - 2 Each
1 Job XXX $______________
1128 Inspect Spiral Case - 2 Each 1 Job XXX $______________
Inspect Discharge Ring and Draft Tube Liner- 2 Each
1 Job XXX $______________
1130 Inspect and Repair Piezometer Tap - 2 Each 1 Job XXX $______________
Replace 4-Path Penstock Flow Meter Transducers and Wiring - 2 Each
1 Job XXX $______________
1132 Replace Runner Coupling Fasteners - 2 Sets 1 Job XXX $______________
Inspect and Test High Pressure Lift System - 2 Each
1 Job XXX $______________
1134 Furnish Hydraulic Jacking System - 2 Each 1 Job XXX $______________
Furnish and Install Vibration Monitoring System
- 2 Each
1 Job XXX $______________
Replace Turbine Pit Platform Decking and Stairway Steps - 2 Each
1 Job XXX $______________
Furnish Thrust Bearing Oil Cooler Assembly - 2 Each
1 Job XXX $______________
Furnish and Install Accumulator Tank and Associated Equipment - 2 Each
1 Job XXX $______________
Furnish and Install Turbine Pit Piping and Associated Equipment - 2 Each
1 Job XXX $______________
Measure Penstock Geometry and Report Flow Meter Paths - 2 Each
1 Job XXX $______________
Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare) - 2 Sets
1 Job XXX $______________
SECTION 00 10 00
Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare) - 2 Sets
1 Job XXX $______________
Replace Upper Generator Guide Bearing Oil Fill Pipe - 2 Each
1 Job XXX $______________
1144 Inspect Generator Brake Rings - 2 Each 1 Job XXX $______________
1145 Replace Headcover Condensing Piping - 2 Each 1 Job XXX $______________
Furnish and Install Penstock Drain Valves - 4 Each
1 Job XXX $______________
Furnish and Install Thrust Bearing Cooler Actuators and Valves - 2 Sets
1 Job XXX $______________
1148 Flush and Clean Unit Piping and Tanks - 2 Each 1 Job XXX $______________
1149 Painting - 2 Each 1 Job XXX $______________
0012 1201 Re-Establish Stator Center - 2 Each 1 Job XXX $______________
Furnish Complete Set of Stator Coils, Supplies, and Accessories - 2 Each
1 Job XXX $______________
Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils
1 Job XXX $______________
Replace Three Generator Neutral Current Transformers - 2 Each
1 Job XXX $______________
1205 Remove Stator Winding - 2 Each 1 Job XXX $______________
1206 Inspect, Clean, and Test Stator Core 1 each 1 Job XXX $______________
1207 Inspect, Clean, and Test Rotor - 2 Each 1 Job XXX $______________
1208 Install and Test Stator Winding - 2 Each 1 Job XXX $______________
Replace All Rotor Field Lead Bus Supports on a Per Unit Basis - 2 Each
1 Job XXX $______________
1210 Perform Miscellaneous Electrical Work - 2 Each 1 Job XXX $______________
0013 1301 Perform Hydraulic Turbine Model Test with New Wicket Gates
1 Job XXX $______________
TOTAL CLIN 0011
TOTAL CLIN 0012
SECTION 00 10 00
0014 1401 Additional Stay Ring Mounting Surface Machining 8 Each $__________ $______________
0015 1501 Additional Head Cover Flange Machining 8 Each $__________ $______________
0016 1601 Additional Bottom Ring Flange Machining 8 Each $__________ $______________
0017 1701 Additional Bearing Housing Machining 8 Each $__________ $______________
0018 1801 Refurbish Generator Brake Rings 8 Each $__________ $______________
0019 1901 Inspect Thrust Bearing Shoes Phase 2 (Installed and Spares)
10 Set $__________ $______________
0020 2001 Inspect Thrust Runner and Generator Shaft Phase
8 Each $__________ $______________
0021 2101 Refurbish Thrust Bearing Shoes - Including Babbitting (Installed and Spares)
10 Set $__________ $______________
0022 2201 Resurface Thrust Bearing Runner and Backside 8 Each $__________ $______________
0023 2301 Resurface Thrust Bearing Runner Running Surface Only; Runner Separate from Generator Shaft
8 Each $__________ $______________
0024 2401 Resurface Thrust Bearing Runner Running Surface Only; Runner Mounted on Generator Shaft
8 Each $__________ $______________
0025 2501 Refurbish Generator Shaft 8 Each $__________ $______________
0026 2601 Furnish New Wicket Gates (Existing Design)- 1 Set
1 Job XXX $______________
2602 Refurbish Wicket Gates - 7 Sets 1 Job XXX $______________
0027 2701 Furnish New Wicket Gates (New Design)- 8 Sets 1 Job XXX $______________
Furnish New Wicket Gate Spares (New Design)- 3 Each
1 Job XXX $______________
0028 2801 Furnish New Wicket Gate Operating Mechanism -8 Each
1 Job XXX $______________
0029 2901 Refurbish Wicket Gate Operating Mechanism - 8 Each
1 Job XXX $______________
0030 3001 Bore Wicket Gate Servomotor Cylinders 16 Each $__________ $______________
0031 3101 Chrome Plate Wicket Gate Servomotor Piston Rod 16 Each $__________ $______________
SECTION 00 10 00
0032 3201 Design and Furnish Turbine Maintenance Platform and Gangway (Design 1)- 2 Sets
1 Job XXX $______________
0033 3301 Design and Furnish Turbine Maintenance Platform and Gangway (Design 2)- 2 Sets
1 Job XXX $______________
0034 3401 Perform Additional Stator Core Interlaminar Insulation Test
8 Each $__________ $______________
0035 3501 Re-Level Sole Plates 8 Each $__________ $______________
0036 3601 Furnish Main Shaft Packing Box Lantern Ring 8 Each $__________ $______________
0037 3701 Design, Furnish, and Install Thrust Bearing Platform - 8 Each
1 Job XXX $______________
0038 3801 Refurbish Rotor Field Poles 42 Each $__________ $______________
0039 3901 Refurbish Rotor Field Poles 42 Each $__________ $______________
0040 4001 Refurbish Rotor Field Poles 42 Each $__________ $______________
0041 4101 Refurbish Rotor Field Poles 42 Each $__________ $______________
0042 4201 Refurbish Rotor Field Poles 42 Each $__________ $______________
0043 4301 Refurbish Rotor Field Poles 42 Each $__________ $______________
0044 4401 Refurbish Rotor Field Poles 42 Each $__________ $______________
0045 4501 Refurbish Rotor Field Poles 42 Each $__________ $______________
0046 4601 Refurbish Rotor Field Poles - 1st Generator Unit
84 Each $__________ $______________
0047 4701 Refurbish Rotor Field Poles - 2nd Generator Unit
84 Each $__________ $______________
0048 4801 Refurbish Rotor Field Poles - 3rd Generator Unit
84 Each $__________ $______________
0049 4901 Refurbish Rotor Field Poles - 4th Generator Unit
84 Each $__________ $______________
0050 5001 Refurbish Rotor Field Poles - 5th Generator Unit
84 Each $__________ $______________
0051 5101 Refurbish Rotor Field Poles - 6th Generator Unit
84 Each $__________ $______________
0052 5201 Refurbish Rotor Field Poles - 7th Generator Unit
84 Each $__________ $______________
SECTION 00 10 00
0053 5301 Refurbish Rotor Field Poles - 8th Generator Unit
84 Each $__________ $______________
0054 5401 Furnish Segregated Phase Bus Stand-off Insulators -
125 Each $__________ $______________
0055 5501 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0056 5601 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0057 5701 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0058 5801 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0059 5901 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0060 6001 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0061 6101 Furnish Segregated Phase Bus Stand-off Insulators
125 Each $__________ $______________
0062 6201 Furnish One Complete Stator Core Assembly - 2nd Generator Unit
1 Job $__________ $______________
0063 6301 Furnish One Complete Stator Core Assembly - 3rd Generator Unit
1 Job $__________ $______________
0064 6401 Furnish One Complete Stator Core Assembly - 4th Generator Unit
1 Job $__________ $______________
0065 6501 Furnish One Complete Stator Core Assembly - 5th Generator Unit
1 Job XXX $______________
0066 6601 Furnish One Complete Stator Core Assembly - 6th Generator Unit
1 Job XXX $______________
0067 6701 Furnish One Complete Stator Core Assembly - 7th Generator Unit
1 Job XXX $______________
0068 6801 Furnish One Complete Stator Core Assembly - 8th Generator Unit
1 Job XXX $______________
0069 6901 Remove Existing Stator Core, Install and Test New Stator Core - 2nd Generator Unit
1 Job XXX $______________
0070 7001 Remove Existing Stator Core, Install and Test New Stator Core - 3rd Generator Unit
1 Job XXX $______________
0071 7101 Remove Existing Stator Core, Install and Test New Stator Core - 4th Generator Unit
1 Job XXX $______________
0072 7201 Remove Existing Stator Core, Install and Test New Stator Core - 5th Generator Unit
1 Job XXX $______________
0073 7301 Remove Existing Stator Core, Install and Test New Stator Core - 6th Generator Unit
1 Job XXX $______________
0074 7401 Remove Existing Stator Core, Install and Test New Stator Core - 7th Generator Unit
1 Job XXX $______________
SECTION 00 10 00
0075 7501 Remove Existing Stator Core, Install and Test New Stator Core - 8th Generator Unit
1 Job XXX $______________
0076 7601 Rework Split Faces, Furnish Radial Keys and Perform Keyway Work, and Furnish New Bolts For Thrust Runner
8 Each $__________ $______________
0077 7701 Machine Backside of Thrust Bearing Shoes Set (Installed and Spares)
10 Each $__________ $______________
0078 7801 Machine Babbitt face of Thrust Bearing Shoes Set (Installed and Spares)
10 Each $__________ $______________
0079 7901 Paint Thrust Bearing Platform - 8 Each 1 Job XXX $______________
0080 8001 All Remaining Work 1 Job XXX $______________
0081 8101 Refurbish Rotor Field Pole Shipping 1 Lot XXX $35,000
NOTES:
TOTAL BASE BID PLUS OPTIONS
1. See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options. The Government may exercise an option by written notice to the Contractor based on Appendix A, Fort Randall Major Unit Rehabilitation ‐ Optional Items
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump -sum) prices and the total amount, the lump -sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item Nos. 0001 thru 0008.
The following CLIN/PRICE ITEM is a COST REIMBURSABLE payment item and will be administered in accordance with Clauses 52.212-23, 52.236-18, 52.242-1 and 252.204-7004. Reference 01 22 00.00 10, MEASUREMENT AND PAYMENT, for additional documenation that must be submitted prior to invoicing.
TOTAL OPTIONAL BID ITEMS
SECTION 00 10 00
CLIN Price Item DESCRIPTION
TIMEFRAME WHEN
OPTIONAL ITEM MAY BE
EXERCISED
IF EXERCISED, TIME
EXTENSION TO
COMPLETE WORK FOR
ITEM
0010 1001 Disassemble Generating Unit, Including Inspections of Components- 2 Each
NLT 540 calendar days after contract award
365 additional calendar days
1002 Reassemble Generating Unit- 2 Each NLT 540 calendar days after contract award No additional time
Operational Testing After Reassembly- 2 Each
NLT 540 calendar days after contract award No additional time
0011 1101 Furnish Francis Turbine Runner- 2 Each
NLT 540 calendar days after contract award No additional time
Pre-Disassembly Investigation- 2 Each
NLT 540 calendar days after contract award No additional time
Line Bore Wicket Gate Stem Housing- 2 Each
NLT 540 calendar days after contract award No additional time
1104 Inspect Stay Ring - 2 Each NLT 540 calendar days after contract award No additional time
Furnish Stationary Sealing Rings - 2 Sets
NLT 540 calendar days after contract award No additional time
1106 Refurbish Headcover - 2 Each NLT 540 calendar days after contract award No additional time
Refurbish Turbine Guide Bearing Housing and Head Cover Extension - 2 Each
NLT 540 calendar days after contract award No additional time
1108 Refurbish Bottom Ring - 2 Each NLT 540 calendar days after contract award No additional time
Refurbish Turbine Air Inlet Valve - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install All Self- Lubricating Bushings and Bearing Plates - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install Turbine Shaft Sleeve - 2 Each
NLT 540 calendar days after contract award No additional time
1112 Refurbish Operating Ring - 2 Each NLT 540 calendar days after contract award No additional time
Inspect Turbine and Generator Shaft - 2 Each
NLT 540 calendar days after contract award No additional time
1114 Machine Turbine Shaft - 2 Each NLT 540 calendar days after contract award No additional time
Furnish and Install Main Turbine Shaft Packing Box- 2 Each
NLT 540 calendar days after contract award No additional time
Refurbish Wicket Gate Servomotor- 2 Sets
NLT 540 calendar days after contract award No additional time
Section 00 10 00
Appendix A
Fort Randall Major Unit Rehabilitation ‐ Optional Items
SECTION 00 10 00, APPENDIX A
Inspect Thrust Runner Phase 1 - 2 Each
NLT 540 calendar days after contract award No additional time
Inspect Thrust Bearing Shoe Phase 1 - 2 Sets
NLT 540 calendar days after contract award No additional time
Refurbish Turbine Guide Bearing (Installed and Spares)- 2 Each
NLT 540 calendar days after contract award No additional time
Inspect Turbine Guide Bearing Oil Pumps/Motor System - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install New Turbine Guide Bearing Oil Piping, Valves, and Filters - 2 Each
NLT 540 calendar days after contract award No additional time
Inspect, Clean, and Pressure Test Generator Air Coolers - 2 Sets
NLT 540 calendar days after contract award No additional time
Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install the 6 Inch Cooling Water Strainer - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install the 6 Inch Cooling Water Valves - 2 Sets
NLT 540 calendar days after contract award No additional time
Replace Depression Air Diaphragm Valves - 2 Each
NLT 540 calendar days after contract award No additional time
Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces - 2 Each
NLT 540 calendar days after contract award No additional time
1128 Inspect Spiral Case - 2 Each NLT 540 calendar days after contract award No additional time
Inspect Discharge Ring and Draft Tube Liner- 2 Each
NLT 540 calendar days after contract award No additional time
Inspect and Repair Piezometer Tap - 2 Each
NLT 540 calendar days after contract award No additional time
Replace 4-Path Penstock Flow Meter Transducers and Wiring - 2 Each
NLT 540 calendar days after contract award No additional time
Replace Runner Coupling Fasteners - 2 Sets
NLT 540 calendar days after contract award No additional time
Inspect and Test High Pressure Lift System - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish Hydraulic Jacking System - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install Vibration Monitoring System - 2 Each
NLT 540 calendar days after contract award No additional time
Replace Turbine Pit Platform Decking and Stairway Steps - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish Thrust Bearing Oil Cooler Assembly - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install Accumulator Tank and Associated Equipment - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install Turbine Pit Piping and Associated Equipment - 2 Each
NLT 540 calendar days after contract award No additional time
Measure Penstock Geometry and Report Flow Meter Paths - 2 Each
NLT 540 calendar days after contract award No additional time
Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare) calendar - 2 Sets
NLT 540 calendar days after contract award No additional time
Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare) calendar - 2 Sets
NLT 540 calendar days after contract award No additional time
Replace Upper Generator Guide Bearing Oil Fill Pipe - 2 Each
NLT 540 calendar days after contract award No additional time
Inspect Generator Brake Rings - 2 Each
NLT 540 calendar days after contract award No additional time
Replace Headcover Condensing Piping - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install Penstock Drain Valves - 4 Each
NLT 540 calendar days after contract award No additional time
Furnish and Install Thrust Bearing Cooler Actuators and Valves - 2 Sets
NLT 540 calendar days after contract award No additional time
Flush and Clean Unit Piping and Tanks - 2 Each
NLT 540 calendar days after contract award No additional time
1149 Painting - 2 Each NLT 540 calendar days after contract award No additional time
0012 1201 Re-Establish Stator Center - 2 Each NLT 540 calendar days after contract award No additional time
Furnish Complete Set of Stator Coils, Supplies, and Accessories - 2 Each
NLT 540 calendar days after contract award No additional time
Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils
NLT 540 calendar days after contract award No additional time
Replace Three Generator Neutral Current Transformers - 2 Each
NLT 540 calendar days after contract award No additional time
1205 Remove Stator Winding - 2 Each NLT 540 calendar days after contract award No additional time
Inspect, Clean, and Test Stator Core 1 each
NLT 540 calendar days after contract award No additional time
Inspect, Clean, and Test Rotor - 2 Each
NLT 540 calendar days after contract award No additional time
Install and Test Stator Winding - 2 Each
NLT 540 calendar days after contract award No additional time
Replace All Rotor Field Lead Bus Supports on a Per Unit Basis - 2 Each
NLT 540 calendar days after contract award No additional time
Perform Miscellaneous Electrical Work - 2 Each
NLT 540 calendar days after contract award No additional time
0013 1301 Perform Hydraulic Turbine Model Test with New Wicket Gates
NLT thirty (30) calendar calendar days after
Government Approval of the
Wicket Gate Mechanism
Condition Analysis Report and Recommendations
Thirty (30) additional calendar days
0014 1401 Additional Stay Ring Mounting Surface Machining
NLT twenty‐five (25) calendar days after Government
Approval of each unit's Stay
Ring As‐Found Inspection
Report
Five (5) additional calendar days
0015 1501 Additional Head Cover Flange Machining
NLT thirty (30) calendar calendar days after notification of base machining of head cover flange
No additional time
0016 1601 Additional Bottom Ring Flange Machining
NLT thirty (30) calendar calendar days after notification of base machining of bottom ring flange
No additional time
0017 1701 Additional Bearing Housing Machining
NLT thirty (30) calendar calendar days after notification of base machining of bearing housing
No additional time
0018 1801 Refurbish Generator Brake Rings
NLT twenty‐five (25) calendar calendar days after
Government Approval of each unit's Generator Brake
Inspection Report
No additional time
0019 1901 Inspect Thrust Bearing Shoes Phase 2 (Installed and Spares)
NLT twenty‐five (25) calendar days after Government
Approval of each unit's Phase
1 Inspection Report
No additional time
0020 2001 Inspect Thrust Runner and Generator Shaft Phase 2
NLT twenty‐five (25) calendar days after Government
Approval of each unit's Phase
1 Inspection Report
No additional time
0021 2101 Refurbish Set of Thrust Bearing Shoes (Installed and Spares)
NLT twenty‐five (25) calendar days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report
No additional time
0022 2201 Resurface Thrust Bearing Runner and Backside
NLT twenty‐five (25) calendar days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report
No additional time
0023 2301 Resurface Thrust Bearing Runner Running Surface Only; Runner Separate from Generator Shaft
NLT twenty‐five (25) calendar days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report
No additional time
0024 2401 Resurface Thrust Bearing Runner Running Surface Only; Runner Mounted on Generator Shaft
NLT twenty‐five (25) calendar days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report
No additional time
0025 2501 Refurbish Generator Shaft
NLT twenty‐five (25) calendar days after Government
Approval of each unit's
Generator Shaft Site
Inspection Report
No additional time
0026 2601 Furnish New Wicket Gates (Existing Design)- 1 Set
NLT twenty‐five (25) calendar days after the completion of the Government Witnessed
Model Test
No additional time
2602 Refurbish Wicket Gates - 7 Sets NLT twenty‐five (25) calendar days after the completion of the Government Witnessed
Model Test
No additional time
0027 2701 Furnish New Wicket Gates (New Design)- 8 Sets
NLT twenty‐five (25) calendar days after the completion of the Government Witnessed
Model Test
No additional time
Furnish New Wicket Gate Spares (New Design)- 3 Each
NLT twenty‐five (25) calendar days after the completion of the Government Witnessed
Model Test
No additional time
0028 2801 Furnish New Wicket Gate Operating Mechanism -8 Each
NLT sixty (60) calendar days after Government Approval of the Wicket Gate
Mechanism Condition
Analysis Report and
Recommendations
No additional time
0029 2901 Refurbish Wicket Gate Operating Mechanism - 8 Each
NLT sixty (60) calendar days after Government Approval of the Wicket Gate
Mechanism Condition
Analysis Report and
Recommendations
No additional time
0030 3001 Bore Wicket Gate Servomotor Cylinders
NLT twenty‐five (25) calendar days after Government approval of each unit's wicket gate servomotor inspection report
No additional time
0031 3101 Chrome Plate Wicket Gate Servomotor Piston Rod
NLT twenty‐five (25) calendar days after Government approval of each unit's wicket gate servomotor inspection report
No additional time
0032 3201 Design and Furnish Turbine Maintenance Platform and Gangway (Design 1)- 2 Sets
NLT ninety (90) calendar days after Government approval of the turbine Final
Model Test Report
No additional time
0033 3301 Design and Furnish Turbine Maintenance Platform and Gangway (Design 2)- 2 Sets
NLT ninety (90) calendar days after Government approval of the turbine Final
Model Test Report
No additional time
0034 3401 Perform Additional Stator Core Interlaminar Insulation Test NLT thirty (30) calendar days after execution of repairs
Thirty (30) additional calendar days
0035 3501 Re-Level Sole Plates NLT thirty (30) calendar days after Government exercise of option to replace new stator core on each unit
Twenty‐one (21) additional calendar days
0036 3601 Furnish Main Shaft Packing Box Lantern Ring
NLT twenty‐five (25) calendar days after Government approval of each unit's lantern ring inspection report
No additional time
0037 3701 Design, Furnish, and Install Thrust Bearing Platform - 8 Each
NLT 540 calendar days after contract award No additional time
0038 3801 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0039 3901 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0040 4001 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0041 4101 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0042 4201 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0043 4301 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0044 4401 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0045 4501 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0046 4601 Refurbish Rotor Field Poles - 1st Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0047 4701 Refurbish Rotor Field Poles - 2nd Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0048 4801 Refurbish Rotor Field Poles - 3rd Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0049 4901 Refurbish Rotor Field Poles - 4th Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0050 5001 Refurbish Rotor Field Poles - 5th Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0051 5101 Refurbish Rotor Field Poles - 6th Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0052 5201 Refurbish Rotor Field Poles - 7th Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0053 5301 Refurbish Rotor Field Poles - 8th Generator Unit
NLT twenty‐five (25) calendar days after Government
Approval of the Field
Winding Final Test Report
No additional time
0054 5401 Furnish Segregated Phase Bus Stand-off Insulators -
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0055 5501 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0056 5601 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0057 5701 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0058 5801 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0059 5901 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0060 6001 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0061 6101 Furnish Segregated Phase Bus Stand-off Insulators
NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report
No additional time
0062 6201 Furnish One Complete Stator Core Assembly - 2nd Generator Unit
NLT eight (8) calendar years after contract award No additional time
0063 6301 Furnish One Complete Stator Core Assembly - 3rd Generator Unit
NLT eight (8) calendar years after contract award No additional time
0064 6401 Furnish One Complete Stator Core Assembly - 4th Generator Unit
NLT eight (8) calendar years after contract award No additional time
0065 6501 Furnish One Complete Stator Core Assembly - 5th Generator Unit
NLT eight (8) calendar years after contract award No additional time
0066 6601 Furnish One Complete Stator Core Assembly - 6th Generator Unit
NLT eight (8) calendar years after contract award No additional time
0067 6701 Furnish One Complete Stator Core Assembly - 7th Generator Unit
NLT eight (8) calendar years after contract award No additional time
0068 6801 Furnish One Complete Stator Core Assembly - 8th Generator Unit
NLT eight (8) calendar years after contract award No additional time
0069 6901 Remove Existing Stator Core, Install and Test New Stator Core - 2nd Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0070 7001 Remove Existing Stator Core, Install and Test New Stator Core - 3rd Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0071 7101 Remove Existing Stator Core, Install and Test New Stator Core - 4th Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0072 7201 Remove Existing Stator Core, Install and Test New Stator Core - 5th Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0073 7301 Remove Existing Stator Core, Install and Test New Stator Core - 6th Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0074 7401 Remove Existing Stator Core, Install and Test New Stator Core - 7th Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0075 7501 Remove Existing Stator Core, Install and Test New Stator Core - 8th Generator Unit
NLT thirty (30) calendar days after each stator core
Interlaminar Insulation Test
Report approved
Ninety (90) additional calendar days
0076 7601 Rework Split Faces, Furnish Radial Keys and Perform Keyway Work, and Furnish New Bolts for Thrust Runner
NLT twenty‐five (25) calendar days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report
No additional time
0077 7701 Machine Backside of Thrust Bearing Shoes Set (Installed and Spares)
NLT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .