Am0004 W9128F-21-R-0005.pdf

PDF 2 MB Posted

Attached to
Fort Randall Major Unit Rehabilitation Project
Solicitation number
W9128F21R0005
Issued by

About this file

This is a solicitation for a major unit rehabilitation project at Fort Randall Dam. The solicitation closes on March 25, 2021 at 2:00 PM Central Time. The project involves refurbishing and replacing components of eight hydroelectric generating units, including Francis turbine runners over 150 inches in diameter, stator windings, stator cores, wicket gates, and other parts. Site visits will be held on January 12-13, 2021 with COVID-19 restrictions and requirements for contractors to submit non-U.S. citizen attendee information in advance. The solicitation is unrestricted and open to both large and small businesses. Offerors must submit technical and price proposals in two volumes following the specified structure and page limits. Evaluation will be based on experience, technical approach, past performance, project execution, small business participation, and price. Award will be made to the responsible offeror providing the best overall value to the government.

View the file

Other files

File Type Posted
Am0006 W9128F21R0005.pdf PDF
Am0005 W9128F-21-R-0005.pdf PDF
9104134 StandoffInsulator.pdf PDF
9040123 Penstock 16 inch.JPG JPG image
9040124 Air Depression Diaphragm Valve 1.jpg JPG image
9045637 Drawings_Headcover Access Inquiry.pdf PDF
9040124 Air Depression Diaphragm Valve 2 .jpg JPG image
9040123 Penstock 12 inch valve.JPG JPG image
Am0003 W9128F21R0005 FR MUR.pdf PDF
20210223_093629.jpg JPG image
20210223_091749.jpg JPG image
coc lab_250047.pdf PDF
0250047-PLM.pdf PDF
20210223_093204.jpg JPG image
20210223_092341.jpg JPG image
TMP_Existing Design_Component Overview.pdf PDF
Pages from Generator Test Report - Westinghouse.pdf PDF
TMP_Existing Design_Procedure.pdf PDF
TMP_Existing Design_Drawings.pdf PDF
Waterway Drawings.pdf PDF
Am0002 - W9128F21R0005.pdf PDF
195215A Pressure Tank.pdf PDF
195214A Pressure Tank.pdf PDF
18-C-5325_Stator Coil Windings.pdf PDF
AM0001_W9128F21R0005 - FR MUR.pdf PDF
Water Quality - Fort Randall.pdf PDF
12_13 Jan 21 Fort Randall Site Visit Presentation.pdf PDF
Site Visit Sign-In_13 Jan 21_FR Major Rehab.pdf PDF
Site Visit Sign-In_12 Jan 21_FR Major Rehab.pdf PDF
Part 1 of 2 Fort Randall MUR FINAL_ REFERENCE DRAWINGS 6-25-20.pdf PDF
Part 2 of 2 Fort Randall MUR FINAL_ REFERENCE DRAWINGS 6-25-20.pdf PDF
W9128F21R0005_Summary of Changes_Draft to Final Solicitation.pdf PDF
Fort Randall MUR FINAL_COLOR_ Contract Drawings Review 12-15-20 REDUCED.pdf PDF
Ft Randall Major Unit Rehab W9128F21R0005 Contract Specs .pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment 0004

Major Unit Rehab, Fort Randall Dam, SD

See attached documentation for content of the amendment revisions

New Date for receipt of Proposals is 20 April 2021 at 2:00 pm (local time)

Government Point of Contact: Jessica Jackson, Contract Specialist (402) 995-2052

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F21R0005

03/29/2021

12/15/2020

Am #0004 - 2 (Continuation SF 30)

29 March 2021 Solicitation No. W9128F21R0005

Date of Issue: 15 December 2020 Date of Receiving Proposals: 20 April 2021

SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package For Major Unit Rehab, Fort Randal Dam, SD.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

1) Section 00 10 00 pages 3 thru 14 are reissued with this amendment.

Changes appear in red; however, Contractors are responsible for reviewing the contents of the entire document.

2) Section 00 10 00 - Appendix A is reissued with this amendment.

Changes appear in red; however, Contractors are responsible for reviewing the contents of the entire document.

3) Section 00 22 00 is reissued with this amendment. Contractors are responsible for reviewing the contents of the entire document. A summary of the changes are as follows.

Paragraph 11.1, Table 00115-1, change following columns heading:

4th Column, change Epeak to Emidrange

5th Column, change Ppeak to Pmidrange

Table definitions, delete previous text for numbers 3 and 4, insert the following definitions:

3) Emidrange is the turbine efficiency at the specified power (Pmidrange) for a given head.

4) Pmidrange is a specified power output between minimum and maximum power outputs for a give head.

Weighted Efficiency Formula, change formula to read:

Weighted Efficiency (FR) = 0.005*Emin97 + 0.022*Emin110 + 0.049*Emin120 + 0.022*Emin130 + 0.002*Emin136 + 0.000*Emin142 + 0.025*Emid97 + 0.110*Emid110 + 0.245*Emid120 + 0.110*Emid130 + 0.010*Emid136 + 0.000*Emid142 + 0.020*Emax97 + 0.088*Emax110 + 0.196*Emax120 + 0.088*Emax130 + 0.008*Emax136 + 0.000*Emax142

Paragraph 13.1, line 4, Change sentence to “The PMP shall be limited to no more than 75 pages; therefore, any content beyond page 75 will not be evaluated.”

Paragraph 13.1.2, second paragraph:

Am #0004 - 3

After the first sentence, insert the sentence “A Gantt chart size of 11x17 is acceptable. Each 11x17 page will be counted as one (1) page.”

Last sentence, change non-binding Contract Notice to Proceed (NTP) date to October 13, 2021.

4) Section 01 22 00.00 10 is reissued with this amendment. A summary of the changes are as follows. However, Contractors are responsible for the contents of the specification.

Paragraph 1.2.82.1, replace “weighted milestone schedule” with “cost loaded schedule.”

Paragraph 1.3.71, Update CLIN description to be: Refurbish Thrust Bearing Shoes – Including Babbitting (Installed and Spares). Updated to include babbitting scope of work.

Add the following CLINS starting at paragraph 1.3.128 (CLIN 0076)

CLIN 0076, Price Item 7601: Rework Split Faces, Furnish Radial Keys and Perform Keyway Work, and Furnish New Bolts For Thrust Runner

CLIN 0077, Price Item 7701: Machine Backside of Thrust Bearing Shoes Set (Installed and Spares)

CLIN 0078, Price Item 7801: Machine Babbitt face of Thrust Bearing Shoes Set (Installed and Spares)

CLIN 0079, Price Item 7901: Paint Thrust Bearing Platform - 8 Each

Update the following CLINS:

All Remaining Work updated to CLIN 0080, Price Item 8001 Refurbish Field Pole Shipping updated to CLIN 0081, Price Item 8101

5) Section 48 13 13.00 26 page 15, delete paragraph 3.1.11.d and substitute the following:

“d. When operating at plant sigma, the magnitude of the peak-to-peak draft tube pulsations in the model water passage without air admission shall be measured at each individual sensor over the range of head and power levels defined in Table 3 of SECTION 48 13 13.01 26, unless otherwise approved. For power outputs less than 70% of the defined Maximum Power column in Table 3, the measured peak-to-peak pressure pulsations shall not exceed 13.5% of the 120 feet net head. For power outputs greater than 70% of the defined Maximum Power column in Table 3, the measured peak-to-peak pressure pulsations shall not exceed 9% of the 120 feet net head. This limit applies to the reading taken with and without air admission. Pressure pulsations shall be evaluated in the time domain and shall equal the total pressure pulsation amplitude in feet divided by 120 feet and multiplied by 100%.”

6) Section 48 13 13.04 26 page 19, paragraph 3.13, delete the existing paragraph and replace with the following:

“3.13 WICKET GATE REFURBISHMENT (OPTIONAL)

Am #0004 - 4

At the option of the Government, the existing wicket gates shall be refurbished. One set of new OEM designed wicket gates shall be fabricated within this option and shall be used in the first unit assembly and as spares for the powerhouse. The existing wicket gates from that first unit shall be refurbished to be used in the second unit reassembly. The existing wicket gates from the second unit shall be refurbished to be used in the third reassembly. This pattern will continue for the remaining units.”

7) Section 48 13 16.00 26 page 7, paragraph. 1.3, Under SD-02 revise the following submittals:

“Within 120 calendar days after receipt of written Notice to Proceed (NTP) for the rotor pole refurbishment:

Rotor Pole Assembly and Details; G, HDC

Rotor Pole Connections Assembly and Details; G, HDC"

8) Section 48 13 16.00 26 page 42, paragraph 3.25.2, Line 8, update CLIN reference to read “(CLIN 0081, Price Item 8101)”

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Proposals are to be submitted electronically as described in Section 00 22 00 PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS AND

EVALUATION.

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 20 April 2021, as stated in the Request For Proposal.

Attachments: 00 10 00 pages 3 thru 14, Appendix A, Section 00 22 00, Section 01 22 00.00 10.

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

29 Mar 2021

MFS/2184

CLIN

Price Item

Description Quantity Unit

Measure Unit Price Amount

0001 0101 Design and Test Hydraulic Turbine Model 1 Job XXX $______________

0002 0201 Disassemble Generating Unit, Including Inspections of Components - 6 Each

1 Job XXX $______________

0202 Reassemble Generating Unit - 6 Each 1 Job XXX $______________

0203 Operational Testing After Reassembly - 6 Each 1 Job XXX $______________

0003 0301 Furnish Francis Turbine Runner - 6 Each 1 Job XXX $______________

0302 Furnish New Thrust Bearing Screw Jack 1 Job XXX $______________

0303 Pre-Disassembly Investigation - 6 Each 1 Job XXX $______________

0304 Line Bore Wicket Gate Stem Housing - 6 Each 1 Job XXX $______________

0305 Inspect Stay Ring - 6 Each 1 Job XXX $______________

0306 Furnish Stationary Sealing Rings - 6 Sets 1 Job XXX $______________

0307 Refurbish Headcover - 6 Each 1 Job XXX $______________

Refurbish Turbine Guide Bearing Housing and Head Cover Extension - 6 Each

1 Job XXX $______________

0309 Refurbish Bottom Ring - 6 Each 1 Job XXX $______________

0310 Refurbish Turbine Air Inlet Valve - 6 Each 1 Job XXX $______________

Furnish and Install All Self-Lubricating Bushings and Bearing Plates - 6 Each

1 Job XXX $______________

Perform Wicket Gate Operating Mechanism Analysis

1 Job XXX $______________

Fort Randall Major Unit Rehab, Fort Randall, SD FRE2

SECTION 00 10 00

Pricing Schedule

BASE ITEMS

TOTAL CLIN 0002

SECTION 00 10 00

(Am0004)

Furnish and Install Turbine Shaft Sleeve - 6 Each

1 Job XXX $______________

0314 Manufacture Spare Turbine Shaft Sleeve 1 Job XXX $______________

0315 Furnish Spare Wicket Gate Stem Seal - 1 Set 1 Job XXX $______________

Furnish Spare Servomotor Packing Box Stem Seals

- 1 Set

1 Job XXX $______________

0317 Refurbish Operating Ring - 6 Each 1 Job XXX $______________

0318 Inspect Turbine and Generator Shaft - 6 Each 1 Job XXX $______________

0319 Machine Turbine Shaft - 6 Each 1 Job XXX $______________

Furnish and Install Main Turbine Shaft Packing Box - 6 Each

1 Job XXX $______________

0321 Refurbish Wicket Gate Servomotor - 6 Sets 1 Job XXX $______________

0322 Inspect Thrust Runner Phase 1 - 6 Each 1 Job XXX $______________

0323 Inspect Thrust Bearing Shoe Phase 1 - 6 Sets 1 Job XXX $______________

Refurbish Turbine Guide Bearing (Installed and Spares) - 8 Each

1 Job XXX $______________

Inspect Turbine Guide Bearing Oil Pumps/Motor System 6 Each

1 Job XXX $______________

Furnish and Install Turbine Guide Bearing Oil Piping, Valves, and Filters - 6 Each

1 Job XXX $______________

Inspect, Clean, and Pressure Test Generator Air Coolers - 6 Sets

1 Job XXX $______________

Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly - 6 Each

1 Job XXX $______________

Furnish and Install the 6 Inch Cooling Water Strainer - 6 Each

1 Job XXX $______________

Furnish and Install the 6 Inch Cooling Water Valves - 6 Sets

1 Job XXX $______________

Replace Depression Air Diaphragm Valves - 6 Each

1 Job XXX $______________

0332 Provide Boring Bar 1 Job XXX $______________

Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces - 6 Each

1 Job XXX $______________

SECTION 00 10 00

0334 Inspect Spiral Case - 6 Each 1 Job XXX $______________

Inspect Discharge Ring and Draft Tube Liner - 6 Each

1 Job XXX $______________

0336 Inspect and Repair Piezometer Tap - 6 Each 1 Job XXX $______________

Replace 8-Path Penstock Flow Meter Transducers and Wiring - 4 Each

1 Job XXX $______________

Replace 4-Path Penstock Flow Meter Transducers and Wiring - 2 Each

1 Job XXX $______________

0339 Replace Runner Coupling Fasteners - 6 Sets 1 Job XXX $______________

Inspect and Test High Pressure Lift System - 6 Each

1 Job XXX $______________

0341 Furnish Hydraulic Jacking System - 6 Each 1 Job XXX $______________

Furnish and Install Vibration Monitoring System

- 6 Each

1 Job XXX $______________

Replace Turbine Pit Platform Decking and Stairway Steps - 6 Each

1 Job XXX $______________

Furnish Thrust Bearing Oil Cooler Assembly - 7 Each

1 Job XXX $______________

Furnish and Install Accumulator Tank and Associated Equipment - 6 Each

1 Job XXX $______________

Furnish and Install Turbine Pit Piping and Associated Equipment - 6 Each

1 Job XXX $______________

Measure Penstock Geometry and Report Flow Meter Paths - 6 Each

1 Job XXX $______________

Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare) - 7 Sets

1 Job XXX $______________

Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare) - 7 Sets

1 Job XXX $______________

Replace Upper Generator Guide Bearing Oil Fill Pipe - 6 Each

1 Job XXX $______________

0351 Inspect Generator Brake Rings - 6 Each 1 Job XXX $______________

0352 Replace Headcover Condensing Piping - 6 Each 1 Job XXX $______________

Furnish and Install Penstock Drain Valves - 12 Each

1 Job XXX $______________

Furnish and Install Thrust Bearing Cooler Actuators and Valves - 6 Sets

1 Job XXX $______________

SECTION 00 10 00

0355 Flush and Clean Headers and Oil Tanks 1 Job XXX $______________

0356 Flush and Clean Unit Piping and Tanks - 6 Each 1 Job XXX $______________

0357 Painting - 6 Each 1 Job XXX $______________

0004 0401 Re-Establish Stator Center - 6 Each 1 Job XXX $______________

Design Stator Core Assembly, Furnish Stamping Die, Furnish One Complete Stator Core Assembly

1 Job XXX $______________

Remove Existing Stator Core, Install and Test New Stator Core - One Generator Unit

1 Job XXX $______________

Furnish Complete Set of Stator Coils, Supplies, and Accessories - 6 Each

1 Job XXX $______________

Manufacture Prototype Coils Identical to Production Coils and Perform Prototype Testing

1 Job XXX $______________

Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils

1 Job XXX $______________

0407 Furnish Spare Generator Parts 1 Job XXX $______________

Replace Three Generator Neutral Current Transformers - 6 Each

1 Job XXX $______________

0409 Remove Stator Winding - 6 Each 1 Job XXX $______________

0410 Inspect, Clean, and Test Stator Core - 6 Each 1 Job XXX $______________

0411 Inspect, Clean, and Test Rotor - 6 Each 1 Job XXX $______________

0412 Install and Test Stator Winding - 6 Each 1 Job XXX $______________

Replace All Rotor Field Lead Bus Supports on a Per Unit Basis - 6 Each

1 Job XXX $______________

0414 Perform Special Field Tests 1 Job XXX $______________

0415 Perform Model Validation Testing 1 Job XXX $______________

0416 Perform Miscellaneous Electrical Work - 6 Each 1 Job XXX $______________

TOTAL CLIN 0003

TOTAL CLIN 0004

SECTION 00 10 00

0005 0501 All Remaining Work 1 Job XXX $______________

0006 0601 Furnish New Oil Est.

29,700

Gal $__________ $______________

0007 0701 Remove On-Site Lead-Based Paint Est.

12,000

Sq Ft $__________ $______________

0008 0801 Dispose of Oil Est.

29,900

Gal $__________ $______________

Economic Price Adjustment (EPA)

FFP

1 Lot XXX

0010 1001 Disassemble Generating Unit, Including Inspections of Components- 2 Each

1 Job XXX $______________

1002 Reassemble Generating Unit- 2 Each 1 Job XXX $______________

1003 Operational Testing After Reassembly- 2 Each 1 Job XXX $______________

OPTIONAL PRICING ITEMS

These items may be exercised up to the totals stated below per item or not at all at the discretion of the Government.

TOTAL BASE BID

The following CLIN/PRICE ITEMS are ESTIMATED QUANTITIES. These will be administered in accordance with the Variation in Estimated Quantity Clause 52.211-18.

The following CLIN/PRICE ITEMS is a LOT pricing item to be used for Economic Price Adjustment purposes. This CLIN will be administered in accordance with the Economic Price Adjustment Clause 52.216-2

0009 0901

Not Separately Priced

PROJECT NO.: _______

FOB: Destination

PURCHASE REQUEST NUMBER: ____________

The Government will make an EPA (limited to the Stainless Steel, Steel (Cold-Rolled and Standard Plate), and Copper) for the turbine runner, stator core, and stator windings as detailed in the EPA Clause. The Contractor shall fill in the following information with the exception of the index to be used:

Stainless Steel: $__________/lb.

Total number of pounds of Stainless Steel: __________ lbs.

Total cost of Stainless Steel: $__________ Steel Index that shall be used to calculate the EPA for Stainless Steel:

WPU101508 (Bureau of Labor Statistics)

Steel: $__________/lb.

Total number of pounds of Steel: __________ lbs.

Total cost of Steel: $__________ Steel Index that shall be used to calculate the EPA for Steel:

WPU101707 (Cold Rolled Steel Sheet and Strip - Bureau of Labor Statistics)

Copper: $__________/lb.

Total number of pounds of copper: __________ lbs.

Total cost of copper: $__________ Copper Index that shall be used to calculate the EPA:

WPU102403 (Secondary copper, Alloyed and Unalloyed - Bureau of Labor Statistics)

SECTION 00 10 00

0011 1101 Furnish Francis Turbine Runner- 2 Each 1 Job XXX $______________

1102 Pre-Disassembly Investigation- 2 Each 1 Job XXX $______________

1103 Line Bore Wicket Gate Stem Housing- 2 Each 1 Job XXX $______________

1104 Inspect Stay Ring - 2 Each 1 Job XXX $______________

1105 Furnish Stationary Sealing Rings - 2 Sets 1 Job XXX $______________

1106 Refurbish Headcover - 2 Each 1 Job XXX $______________

Refurbish Turbine Guide Bearing Housing and Head Cover Extension - 2 Each

1 Job XXX $______________

1108 Refurbish Bottom Ring - 2 Each 1 Job XXX $______________

1109 Refurbish Turbine Air Inlet Valve - 2 Each 1 Job XXX $______________

Furnish and Install All Self-Lubricating Bushings and Bearing Plates - 2 Each

1 Job XXX $______________

Furnish and Install Turbine Shaft Sleeve - 2 Each

1 Job XXX $______________

1112 Refurbish Operating Ring - 2 Each 1 Job XXX $______________

1113 Inspect Turbine and Generator Shaft - 2 Each 1 Job XXX $______________

1114 Machine Turbine Shaft - 2 Each 1 Job XXX $______________

Furnish and Install Main Turbine Shaft Packing Box- 2 Each

1 Job XXX $______________

1116 Refurbish Wicket Gate Servomotor- 2 Sets 1 Job XXX $______________

1117 Inspect Thrust Runner Phase 1 - 2 Each 1 Job XXX $______________

1118 Inspect Thrust Bearing Shoe Phase 1 - 2 Sets 1 Job XXX $______________

Refurbish Turbine Guide Bearing (Installed and Spares)- 2 Each

1 Job XXX $______________

Inspect Turbine Guide Bearing Oil Pumps/Motor System - 2 Each

1 Job XXX $______________

TOTAL CLIN 0010

SECTION 00 10 00

Furnish and Install Turbine Guide Bearing Oil Piping, Valves, and Filters - 2 Each

1 Job XXX $______________

Inspect, Clean, and Pressure Test Generator Air Coolers - 2 Sets

1 Job XXX $______________

Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly - 2 Each

1 Job XXX $______________

Furnish and Install the 6 Inch Cooling Water Strainer - 2 Each

1 Job XXX $______________

Furnish and Install the 6 Inch Cooling Water Valves - 2 Sets

1 Job XXX $______________

Replace Depression Air Diaphragm Valves - 2 Each

1 Job XXX $______________

Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces - 2 Each

1 Job XXX $______________

1128 Inspect Spiral Case - 2 Each 1 Job XXX $______________

Inspect Discharge Ring and Draft Tube Liner- 2 Each

1 Job XXX $______________

1130 Inspect and Repair Piezometer Tap - 2 Each 1 Job XXX $______________

Replace 4-Path Penstock Flow Meter Transducers and Wiring - 2 Each

1 Job XXX $______________

1132 Replace Runner Coupling Fasteners - 2 Sets 1 Job XXX $______________

Inspect and Test High Pressure Lift System - 2 Each

1 Job XXX $______________

1134 Furnish Hydraulic Jacking System - 2 Each 1 Job XXX $______________

Furnish and Install Vibration Monitoring System

- 2 Each

1 Job XXX $______________

Replace Turbine Pit Platform Decking and Stairway Steps - 2 Each

1 Job XXX $______________

Furnish Thrust Bearing Oil Cooler Assembly - 2 Each

1 Job XXX $______________

Furnish and Install Accumulator Tank and Associated Equipment - 2 Each

1 Job XXX $______________

Furnish and Install Turbine Pit Piping and Associated Equipment - 2 Each

1 Job XXX $______________

Measure Penstock Geometry and Report Flow Meter Paths - 2 Each

1 Job XXX $______________

Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare) - 2 Sets

1 Job XXX $______________

SECTION 00 10 00

Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare) - 2 Sets

1 Job XXX $______________

Replace Upper Generator Guide Bearing Oil Fill Pipe - 2 Each

1 Job XXX $______________

1144 Inspect Generator Brake Rings - 2 Each 1 Job XXX $______________

1145 Replace Headcover Condensing Piping - 2 Each 1 Job XXX $______________

Furnish and Install Penstock Drain Valves - 4 Each

1 Job XXX $______________

Furnish and Install Thrust Bearing Cooler Actuators and Valves - 2 Sets

1 Job XXX $______________

1148 Flush and Clean Unit Piping and Tanks - 2 Each 1 Job XXX $______________

1149 Painting - 2 Each 1 Job XXX $______________

0012 1201 Re-Establish Stator Center - 2 Each 1 Job XXX $______________

Furnish Complete Set of Stator Coils, Supplies, and Accessories - 2 Each

1 Job XXX $______________

Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils

1 Job XXX $______________

Replace Three Generator Neutral Current Transformers - 2 Each

1 Job XXX $______________

1205 Remove Stator Winding - 2 Each 1 Job XXX $______________

1206 Inspect, Clean, and Test Stator Core 1 each 1 Job XXX $______________

1207 Inspect, Clean, and Test Rotor - 2 Each 1 Job XXX $______________

1208 Install and Test Stator Winding - 2 Each 1 Job XXX $______________

Replace All Rotor Field Lead Bus Supports on a Per Unit Basis - 2 Each

1 Job XXX $______________

1210 Perform Miscellaneous Electrical Work - 2 Each 1 Job XXX $______________

0013 1301 Perform Hydraulic Turbine Model Test with New Wicket Gates

1 Job XXX $______________

TOTAL CLIN 0011

TOTAL CLIN 0012

SECTION 00 10 00

0014 1401 Additional Stay Ring Mounting Surface Machining 8 Each $__________ $______________

0015 1501 Additional Head Cover Flange Machining 8 Each $__________ $______________

0016 1601 Additional Bottom Ring Flange Machining 8 Each $__________ $______________

0017 1701 Additional Bearing Housing Machining 8 Each $__________ $______________

0018 1801 Refurbish Generator Brake Rings 8 Each $__________ $______________

0019 1901 Inspect Thrust Bearing Shoes Phase 2 (Installed and Spares)

10 Set $__________ $______________

0020 2001 Inspect Thrust Runner and Generator Shaft Phase

8 Each $__________ $______________

0021 2101 Refurbish Thrust Bearing Shoes - Including Babbitting (Installed and Spares)

10 Set $__________ $______________

0022 2201 Resurface Thrust Bearing Runner and Backside 8 Each $__________ $______________

0023 2301 Resurface Thrust Bearing Runner Running Surface Only; Runner Separate from Generator Shaft

8 Each $__________ $______________

0024 2401 Resurface Thrust Bearing Runner Running Surface Only; Runner Mounted on Generator Shaft

8 Each $__________ $______________

0025 2501 Refurbish Generator Shaft 8 Each $__________ $______________

0026 2601 Furnish New Wicket Gates (Existing Design)- 1 Set

1 Job XXX $______________

2602 Refurbish Wicket Gates - 7 Sets 1 Job XXX $______________

0027 2701 Furnish New Wicket Gates (New Design)- 8 Sets 1 Job XXX $______________

Furnish New Wicket Gate Spares (New Design)- 3 Each

1 Job XXX $______________

0028 2801 Furnish New Wicket Gate Operating Mechanism -8 Each

1 Job XXX $______________

0029 2901 Refurbish Wicket Gate Operating Mechanism - 8 Each

1 Job XXX $______________

0030 3001 Bore Wicket Gate Servomotor Cylinders 16 Each $__________ $______________

0031 3101 Chrome Plate Wicket Gate Servomotor Piston Rod 16 Each $__________ $______________

SECTION 00 10 00

0032 3201 Design and Furnish Turbine Maintenance Platform and Gangway (Design 1)- 2 Sets

1 Job XXX $______________

0033 3301 Design and Furnish Turbine Maintenance Platform and Gangway (Design 2)- 2 Sets

1 Job XXX $______________

0034 3401 Perform Additional Stator Core Interlaminar Insulation Test

8 Each $__________ $______________

0035 3501 Re-Level Sole Plates 8 Each $__________ $______________

0036 3601 Furnish Main Shaft Packing Box Lantern Ring 8 Each $__________ $______________

0037 3701 Design, Furnish, and Install Thrust Bearing Platform - 8 Each

1 Job XXX $______________

0038 3801 Refurbish Rotor Field Poles 42 Each $__________ $______________

0039 3901 Refurbish Rotor Field Poles 42 Each $__________ $______________

0040 4001 Refurbish Rotor Field Poles 42 Each $__________ $______________

0041 4101 Refurbish Rotor Field Poles 42 Each $__________ $______________

0042 4201 Refurbish Rotor Field Poles 42 Each $__________ $______________

0043 4301 Refurbish Rotor Field Poles 42 Each $__________ $______________

0044 4401 Refurbish Rotor Field Poles 42 Each $__________ $______________

0045 4501 Refurbish Rotor Field Poles 42 Each $__________ $______________

0046 4601 Refurbish Rotor Field Poles - 1st Generator Unit

84 Each $__________ $______________

0047 4701 Refurbish Rotor Field Poles - 2nd Generator Unit

84 Each $__________ $______________

0048 4801 Refurbish Rotor Field Poles - 3rd Generator Unit

84 Each $__________ $______________

0049 4901 Refurbish Rotor Field Poles - 4th Generator Unit

84 Each $__________ $______________

0050 5001 Refurbish Rotor Field Poles - 5th Generator Unit

84 Each $__________ $______________

0051 5101 Refurbish Rotor Field Poles - 6th Generator Unit

84 Each $__________ $______________

0052 5201 Refurbish Rotor Field Poles - 7th Generator Unit

84 Each $__________ $______________

SECTION 00 10 00

0053 5301 Refurbish Rotor Field Poles - 8th Generator Unit

84 Each $__________ $______________

0054 5401 Furnish Segregated Phase Bus Stand-off Insulators -

125 Each $__________ $______________

0055 5501 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0056 5601 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0057 5701 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0058 5801 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0059 5901 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0060 6001 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0061 6101 Furnish Segregated Phase Bus Stand-off Insulators

125 Each $__________ $______________

0062 6201 Furnish One Complete Stator Core Assembly - 2nd Generator Unit

1 Job $__________ $______________

0063 6301 Furnish One Complete Stator Core Assembly - 3rd Generator Unit

1 Job $__________ $______________

0064 6401 Furnish One Complete Stator Core Assembly - 4th Generator Unit

1 Job $__________ $______________

0065 6501 Furnish One Complete Stator Core Assembly - 5th Generator Unit

1 Job XXX $______________

0066 6601 Furnish One Complete Stator Core Assembly - 6th Generator Unit

1 Job XXX $______________

0067 6701 Furnish One Complete Stator Core Assembly - 7th Generator Unit

1 Job XXX $______________

0068 6801 Furnish One Complete Stator Core Assembly - 8th Generator Unit

1 Job XXX $______________

0069 6901 Remove Existing Stator Core, Install and Test New Stator Core - 2nd Generator Unit

1 Job XXX $______________

0070 7001 Remove Existing Stator Core, Install and Test New Stator Core - 3rd Generator Unit

1 Job XXX $______________

0071 7101 Remove Existing Stator Core, Install and Test New Stator Core - 4th Generator Unit

1 Job XXX $______________

0072 7201 Remove Existing Stator Core, Install and Test New Stator Core - 5th Generator Unit

1 Job XXX $______________

0073 7301 Remove Existing Stator Core, Install and Test New Stator Core - 6th Generator Unit

1 Job XXX $______________

0074 7401 Remove Existing Stator Core, Install and Test New Stator Core - 7th Generator Unit

1 Job XXX $______________

SECTION 00 10 00

0075 7501 Remove Existing Stator Core, Install and Test New Stator Core - 8th Generator Unit

1 Job XXX $______________

0076 7601 Rework Split Faces, Furnish Radial Keys and Perform Keyway Work, and Furnish New Bolts For Thrust Runner

8 Each $__________ $______________

0077 7701 Machine Backside of Thrust Bearing Shoes Set (Installed and Spares)

10 Each $__________ $______________

0078 7801 Machine Babbitt face of Thrust Bearing Shoes Set (Installed and Spares)

10 Each $__________ $______________

0079 7901 Paint Thrust Bearing Platform - 8 Each 1 Job XXX $______________

0080 8001 All Remaining Work 1 Job XXX $______________

0081 8101 Refurbish Rotor Field Pole Shipping 1 Lot XXX $35,000

NOTES:

TOTAL BASE BID PLUS OPTIONS

1. See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options. The Government may exercise an option by written notice to the Contractor based on Appendix A, Fort Randall Major Unit Rehabilitation ‐ Optional Items

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump -sum) prices and the total amount, the lump -sum prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item Nos. 0001 thru 0008.

The following CLIN/PRICE ITEM is a COST REIMBURSABLE payment item and will be administered in accordance with Clauses 52.212-23, 52.236-18, 52.242-1 and 252.204-7004. Reference 01 22 00.00 10, MEASUREMENT AND PAYMENT, for additional documenation that must be submitted prior to invoicing.

TOTAL OPTIONAL BID ITEMS

SECTION 00 10 00

CLIN Price Item DESCRIPTION

TIMEFRAME WHEN

OPTIONAL ITEM MAY BE

EXERCISED

IF EXERCISED, TIME

EXTENSION TO

COMPLETE WORK FOR

ITEM

0010 1001 Disassemble Generating Unit, Including Inspections of Components- 2 Each

NLT 540 calendar days after contract award

365 additional calendar days

1002 Reassemble Generating Unit- 2 Each NLT 540 calendar days after contract award No additional time

Operational Testing After Reassembly- 2 Each

NLT 540 calendar days after contract award No additional time

0011 1101 Furnish Francis Turbine Runner- 2 Each

NLT 540 calendar days after contract award No additional time

Pre-Disassembly Investigation- 2 Each

NLT 540 calendar days after contract award No additional time

Line Bore Wicket Gate Stem Housing- 2 Each

NLT 540 calendar days after contract award No additional time

1104 Inspect Stay Ring - 2 Each NLT 540 calendar days after contract award No additional time

Furnish Stationary Sealing Rings - 2 Sets

NLT 540 calendar days after contract award No additional time

1106 Refurbish Headcover - 2 Each NLT 540 calendar days after contract award No additional time

Refurbish Turbine Guide Bearing Housing and Head Cover Extension - 2 Each

NLT 540 calendar days after contract award No additional time

1108 Refurbish Bottom Ring - 2 Each NLT 540 calendar days after contract award No additional time

Refurbish Turbine Air Inlet Valve - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install All Self- Lubricating Bushings and Bearing Plates - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install Turbine Shaft Sleeve - 2 Each

NLT 540 calendar days after contract award No additional time

1112 Refurbish Operating Ring - 2 Each NLT 540 calendar days after contract award No additional time

Inspect Turbine and Generator Shaft - 2 Each

NLT 540 calendar days after contract award No additional time

1114 Machine Turbine Shaft - 2 Each NLT 540 calendar days after contract award No additional time

Furnish and Install Main Turbine Shaft Packing Box- 2 Each

NLT 540 calendar days after contract award No additional time

Refurbish Wicket Gate Servomotor- 2 Sets

NLT 540 calendar days after contract award No additional time

Section 00 10 00

Appendix A

Fort Randall Major Unit Rehabilitation ‐ Optional Items

SECTION 00 10 00, APPENDIX A

Inspect Thrust Runner Phase 1 - 2 Each

NLT 540 calendar days after contract award No additional time

Inspect Thrust Bearing Shoe Phase 1 - 2 Sets

NLT 540 calendar days after contract award No additional time

Refurbish Turbine Guide Bearing (Installed and Spares)- 2 Each

NLT 540 calendar days after contract award No additional time

Inspect Turbine Guide Bearing Oil Pumps/Motor System - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install New Turbine Guide Bearing Oil Piping, Valves, and Filters - 2 Each

NLT 540 calendar days after contract award No additional time

Inspect, Clean, and Pressure Test Generator Air Coolers - 2 Sets

NLT 540 calendar days after contract award No additional time

Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install the 6 Inch Cooling Water Strainer - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install the 6 Inch Cooling Water Valves - 2 Sets

NLT 540 calendar days after contract award No additional time

Replace Depression Air Diaphragm Valves - 2 Each

NLT 540 calendar days after contract award No additional time

Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces - 2 Each

NLT 540 calendar days after contract award No additional time

1128 Inspect Spiral Case - 2 Each NLT 540 calendar days after contract award No additional time

Inspect Discharge Ring and Draft Tube Liner- 2 Each

NLT 540 calendar days after contract award No additional time

Inspect and Repair Piezometer Tap - 2 Each

NLT 540 calendar days after contract award No additional time

Replace 4-Path Penstock Flow Meter Transducers and Wiring - 2 Each

NLT 540 calendar days after contract award No additional time

Replace Runner Coupling Fasteners - 2 Sets

NLT 540 calendar days after contract award No additional time

Inspect and Test High Pressure Lift System - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish Hydraulic Jacking System - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install Vibration Monitoring System - 2 Each

NLT 540 calendar days after contract award No additional time

Replace Turbine Pit Platform Decking and Stairway Steps - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish Thrust Bearing Oil Cooler Assembly - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install Accumulator Tank and Associated Equipment - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install Turbine Pit Piping and Associated Equipment - 2 Each

NLT 540 calendar days after contract award No additional time

Measure Penstock Geometry and Report Flow Meter Paths - 2 Each

NLT 540 calendar days after contract award No additional time

Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare) calendar - 2 Sets

NLT 540 calendar days after contract award No additional time

Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare) calendar - 2 Sets

NLT 540 calendar days after contract award No additional time

Replace Upper Generator Guide Bearing Oil Fill Pipe - 2 Each

NLT 540 calendar days after contract award No additional time

Inspect Generator Brake Rings - 2 Each

NLT 540 calendar days after contract award No additional time

Replace Headcover Condensing Piping - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install Penstock Drain Valves - 4 Each

NLT 540 calendar days after contract award No additional time

Furnish and Install Thrust Bearing Cooler Actuators and Valves - 2 Sets

NLT 540 calendar days after contract award No additional time

Flush and Clean Unit Piping and Tanks - 2 Each

NLT 540 calendar days after contract award No additional time

1149 Painting - 2 Each NLT 540 calendar days after contract award No additional time

0012 1201 Re-Establish Stator Center - 2 Each NLT 540 calendar days after contract award No additional time

Furnish Complete Set of Stator Coils, Supplies, and Accessories - 2 Each

NLT 540 calendar days after contract award No additional time

Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils

NLT 540 calendar days after contract award No additional time

Replace Three Generator Neutral Current Transformers - 2 Each

NLT 540 calendar days after contract award No additional time

1205 Remove Stator Winding - 2 Each NLT 540 calendar days after contract award No additional time

Inspect, Clean, and Test Stator Core 1 each

NLT 540 calendar days after contract award No additional time

Inspect, Clean, and Test Rotor - 2 Each

NLT 540 calendar days after contract award No additional time

Install and Test Stator Winding - 2 Each

NLT 540 calendar days after contract award No additional time

Replace All Rotor Field Lead Bus Supports on a Per Unit Basis - 2 Each

NLT 540 calendar days after contract award No additional time

Perform Miscellaneous Electrical Work - 2 Each

NLT 540 calendar days after contract award No additional time

0013 1301 Perform Hydraulic Turbine Model Test with New Wicket Gates

NLT thirty (30) calendar calendar days after

Government Approval of the

Wicket Gate Mechanism

Condition Analysis Report and Recommendations

Thirty (30) additional calendar days

0014 1401 Additional Stay Ring Mounting Surface Machining

NLT twenty‐five (25) calendar days after Government

Approval of each unit's Stay

Ring As‐Found Inspection

Report

Five (5) additional calendar days

0015 1501 Additional Head Cover Flange Machining

NLT thirty (30) calendar calendar days after notification of base machining of head cover flange

No additional time

0016 1601 Additional Bottom Ring Flange Machining

NLT thirty (30) calendar calendar days after notification of base machining of bottom ring flange

No additional time

0017 1701 Additional Bearing Housing Machining

NLT thirty (30) calendar calendar days after notification of base machining of bearing housing

No additional time

0018 1801 Refurbish Generator Brake Rings

NLT twenty‐five (25) calendar calendar days after

Government Approval of each unit's Generator Brake

Inspection Report

No additional time

0019 1901 Inspect Thrust Bearing Shoes Phase 2 (Installed and Spares)

NLT twenty‐five (25) calendar days after Government

Approval of each unit's Phase

1 Inspection Report

No additional time

0020 2001 Inspect Thrust Runner and Generator Shaft Phase 2

NLT twenty‐five (25) calendar days after Government

Approval of each unit's Phase

1 Inspection Report

No additional time

0021 2101 Refurbish Set of Thrust Bearing Shoes (Installed and Spares)

NLT twenty‐five (25) calendar days after Government

Approval of each unit's

Thrust Bearing Site

Inspection Report

No additional time

0022 2201 Resurface Thrust Bearing Runner and Backside

NLT twenty‐five (25) calendar days after Government

Approval of each unit's

Thrust Bearing Site

Inspection Report

No additional time

0023 2301 Resurface Thrust Bearing Runner Running Surface Only; Runner Separate from Generator Shaft

NLT twenty‐five (25) calendar days after Government

Approval of each unit's

Thrust Bearing Site

Inspection Report

No additional time

0024 2401 Resurface Thrust Bearing Runner Running Surface Only; Runner Mounted on Generator Shaft

NLT twenty‐five (25) calendar days after Government

Approval of each unit's

Thrust Bearing Site

Inspection Report

No additional time

0025 2501 Refurbish Generator Shaft

NLT twenty‐five (25) calendar days after Government

Approval of each unit's

Generator Shaft Site

Inspection Report

No additional time

0026 2601 Furnish New Wicket Gates (Existing Design)- 1 Set

NLT twenty‐five (25) calendar days after the completion of the Government Witnessed

Model Test

No additional time

2602 Refurbish Wicket Gates - 7 Sets NLT twenty‐five (25) calendar days after the completion of the Government Witnessed

Model Test

No additional time

0027 2701 Furnish New Wicket Gates (New Design)- 8 Sets

NLT twenty‐five (25) calendar days after the completion of the Government Witnessed

Model Test

No additional time

Furnish New Wicket Gate Spares (New Design)- 3 Each

NLT twenty‐five (25) calendar days after the completion of the Government Witnessed

Model Test

No additional time

0028 2801 Furnish New Wicket Gate Operating Mechanism -8 Each

NLT sixty (60) calendar days after Government Approval of the Wicket Gate

Mechanism Condition

Analysis Report and

Recommendations

No additional time

0029 2901 Refurbish Wicket Gate Operating Mechanism - 8 Each

NLT sixty (60) calendar days after Government Approval of the Wicket Gate

Mechanism Condition

Analysis Report and

Recommendations

No additional time

0030 3001 Bore Wicket Gate Servomotor Cylinders

NLT twenty‐five (25) calendar days after Government approval of each unit's wicket gate servomotor inspection report

No additional time

0031 3101 Chrome Plate Wicket Gate Servomotor Piston Rod

NLT twenty‐five (25) calendar days after Government approval of each unit's wicket gate servomotor inspection report

No additional time

0032 3201 Design and Furnish Turbine Maintenance Platform and Gangway (Design 1)- 2 Sets

NLT ninety (90) calendar days after Government approval of the turbine Final

Model Test Report

No additional time

0033 3301 Design and Furnish Turbine Maintenance Platform and Gangway (Design 2)- 2 Sets

NLT ninety (90) calendar days after Government approval of the turbine Final

Model Test Report

No additional time

0034 3401 Perform Additional Stator Core Interlaminar Insulation Test NLT thirty (30) calendar days after execution of repairs

Thirty (30) additional calendar days

0035 3501 Re-Level Sole Plates NLT thirty (30) calendar days after Government exercise of option to replace new stator core on each unit

Twenty‐one (21) additional calendar days

0036 3601 Furnish Main Shaft Packing Box Lantern Ring

NLT twenty‐five (25) calendar days after Government approval of each unit's lantern ring inspection report

No additional time

0037 3701 Design, Furnish, and Install Thrust Bearing Platform - 8 Each

NLT 540 calendar days after contract award No additional time

0038 3801 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0039 3901 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0040 4001 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0041 4101 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0042 4201 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0043 4301 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0044 4401 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0045 4501 Refurbish Rotor Field Poles NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0046 4601 Refurbish Rotor Field Poles - 1st Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0047 4701 Refurbish Rotor Field Poles - 2nd Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0048 4801 Refurbish Rotor Field Poles - 3rd Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0049 4901 Refurbish Rotor Field Poles - 4th Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0050 5001 Refurbish Rotor Field Poles - 5th Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0051 5101 Refurbish Rotor Field Poles - 6th Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0052 5201 Refurbish Rotor Field Poles - 7th Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0053 5301 Refurbish Rotor Field Poles - 8th Generator Unit

NLT twenty‐five (25) calendar days after Government

Approval of the Field

Winding Final Test Report

No additional time

0054 5401 Furnish Segregated Phase Bus Stand-off Insulators -

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0055 5501 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0056 5601 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0057 5701 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0058 5801 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0059 5901 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0060 6001 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0061 6101 Furnish Segregated Phase Bus Stand-off Insulators

NLT thirty (30) calendar days after Government Approval of the Bus Duct as‐found report

No additional time

0062 6201 Furnish One Complete Stator Core Assembly - 2nd Generator Unit

NLT eight (8) calendar years after contract award No additional time

0063 6301 Furnish One Complete Stator Core Assembly - 3rd Generator Unit

NLT eight (8) calendar years after contract award No additional time

0064 6401 Furnish One Complete Stator Core Assembly - 4th Generator Unit

NLT eight (8) calendar years after contract award No additional time

0065 6501 Furnish One Complete Stator Core Assembly - 5th Generator Unit

NLT eight (8) calendar years after contract award No additional time

0066 6601 Furnish One Complete Stator Core Assembly - 6th Generator Unit

NLT eight (8) calendar years after contract award No additional time

0067 6701 Furnish One Complete Stator Core Assembly - 7th Generator Unit

NLT eight (8) calendar years after contract award No additional time

0068 6801 Furnish One Complete Stator Core Assembly - 8th Generator Unit

NLT eight (8) calendar years after contract award No additional time

0069 6901 Remove Existing Stator Core, Install and Test New Stator Core - 2nd Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0070 7001 Remove Existing Stator Core, Install and Test New Stator Core - 3rd Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0071 7101 Remove Existing Stator Core, Install and Test New Stator Core - 4th Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0072 7201 Remove Existing Stator Core, Install and Test New Stator Core - 5th Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0073 7301 Remove Existing Stator Core, Install and Test New Stator Core - 6th Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0074 7401 Remove Existing Stator Core, Install and Test New Stator Core - 7th Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0075 7501 Remove Existing Stator Core, Install and Test New Stator Core - 8th Generator Unit

NLT thirty (30) calendar days after each stator core

Interlaminar Insulation Test

Report approved

Ninety (90) additional calendar days

0076 7601 Rework Split Faces, Furnish Radial Keys and Perform Keyway Work, and Furnish New Bolts for Thrust Runner

NLT twenty‐five (25) calendar days after Government

Approval of each unit's

Thrust Bearing Site

Inspection Report

No additional time

0077 7701 Machine Backside of Thrust Bearing Shoes Set (Installed and Spares)

NLT…

This is the start of the file's text. The full file is on GovTribe.