REVISED Flow Sensor Test Article (F-STAr) pump

Closed Solicitation Posted

Solicitation number
4-B176-Q-00517-00
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Lemont, Illinois 60439, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Argonne National Laboratory, under the Department of Energy Office of Science, is seeking a source to provide a Flow Sensor Test Article (F-STAr) pump that will be installed in their Mechanisms Engineering Test Loop (METL) facility. The pump is designed to provide submerged high-flowrate experimental testing capabilities for sensor and component testing and development, and to perform fluid studies, in support of sodium-cooled nuclear reactor development. The work includes the design, fabrication, testing, documentation, and delivery of the pump in accordance with detailed technical, fabrication, testing, quality assurance, and documentation requirements. The evaluation will be based on lowest price, technical acceptability.

The solicitation has no set-aside designation. Offerors must provide a signed and completed ANL-70 Request for Quotation, signed and completed ANL-70B Pre-Award Information, and evidence of technical capability. The quotation is due by August 19, 2024. The pump must meet the Buy American requirements and will be delivered to Argonne National Laboratory in Lemont, Illinois.

Notice text

5 versions

Update #5 · Latest ·

AN ADDENDUM HAS BEEN INCORPORATED INTO THIS AWARD. 

THIS SOLICITATION HAS BEEN REVISED WITH A NEW STATEMENT OF WORK AND DRAWINGS. 

PLEASE USE AND REVIEW ALL NEW VERSIONS OF THE APPLICABLE DOCUMENTATION. OFFER DEADLINE HAS BEEN REACTIVATED TO AUGUST 19, 2024. 

Argonne National Laboratory is seeking a source for a Flow Sensor Test Article (F-STAr) pump that will be installed in Argonne National Laboratory’s (ANL) Mechanisms Engineering Test Loop (METL). F-STAr is designed to provide submerged high-flowrate experimental testing capabilities for sensor and component testing and development, and to perform fluid studies, in support of sodium-cooled nuclear reactor development. 

*EVALUATION WILL BE BASED ON BEST VALUE METHODOLOGY*

The Contractor shall provide a pump that can develop the highest reasonable flowrate in accordance with the requirements stated in this specification. If the Contractor cannot meet all the requirements, the Contractor can offer a pump that achieves as many requirements as possible, but explicitly listing the requirements that cannot be met.

Please help to provide:

  1. Signed and completed ANL-70 Request for Quotation
  2. Signed and completed ANL-70B Pre-Award Information
  3. Technical Proposal with proof of Adherence to each section of the Evaluation Criteria
  4. Business Proposal
  5. Price Proposal 
  6. Signed and completed Addendums (if any)

Please send any questions to the Contracting Officer.

Update #4 ·

THIS SOLICITATION HAS BEEN REVISED WITH A NEW STATEMENT OF WORK AND DRAWINGS. 

PLEASE USE AND REVIEW ALL NEW VERSIONS OF THE APPLICABLE DOCUMENTATION. OFFER DEADLINE HAS BEEN REACTIVATED TO AUGUST 19, 2024. 

Argonne National Laboratory is seeking a source for a Flow Sensor Test Article (F-STAr) pump that will be installed in Argonne National Laboratory’s (ANL) Mechanisms Engineering Test Loop (METL). F-STAr is designed to provide submerged high-flowrate experimental testing capabilities for sensor and component testing and development, and to perform fluid studies, in support of sodium-cooled nuclear reactor development. 

*EVALUATION WILL BE BASED ON BEST VALUE METHODOLOGY*

The Contractor shall provide a pump that can develop the highest reasonable flowrate in accordance with the requirements stated in this specification. If the Contractor cannot meet all the requirements, the Contractor can offer a pump that achieves as many requirements as possible, but explicitly listing the requirements that cannot be met.

Please help to provide:

  1. Signed and completed ANL-70 Request for Quotation
  2. Signed and completed ANL-70B Pre-Award Information
  3. Technical Proposal with proof of Adherence to each section of the Evaluation Criteria
  4. Business Proposal
  5. Price Proposal 
  6. Signed and completed Addendums (if any)

Please send any questions to the Contracting Officer.

Update #3 ·

ADDENDUMS HAVE BEEN INCORPORATED INTO THIS SOLICITATION. PLEASE USE AND REVIEW ALL NEW VERSIONS OF THE APPLICABLE DOCUMENTATION. OFFER DEADLINE HAS BEEN EXTENDED TO JULY 9, 2024. 

Argonne National Laboratory is seeking a source for a Flow Sensor Test Article (F-STAr) pump that will be installed in Argonne National Laboratory’s (ANL) Mechanisms Engineering Test Loop (METL). F-STAr is designed to provide submerged high-flowrate experimental testing capabilities for sensor and component testing and development, and to perform fluid studies, in support of sodium-cooled nuclear reactor development. 

*EVALUATION WILL BE BASED ON BEST VALUE METHODOLOGY*

The work shall include the following referenced in the Specification Document dated JUNE 6 ,2024 and attached to this solicitation:

2.1.1 Design and develop the pump in accordance with the Design Requirements in Section 4.
2.1.2 Fabricate the pump in accordance with the Fabrication Requirements in Section 5.
2.1.3 Perform tests in accordance with the Testing Requirements in Section 6.
2.1.4 Perform and document all required certifications, examinations and inspections, control of material, testing, cleaning records, and certifications specified throughout this document.
2.1.5 Provide documentation in accordance with the Quality Assurance and Documentation Requirements in Section 7
2.1.6 Ship and deliver the fabricated items and documentation to Argonne National Laboratory as specified in Section 9.

Please help to provide:

  1. Signed and completed ANL-70 Request for Quotation
  2. Signed and completed ANL-70B Pre-Award Information
  3. Business and Price Proposal 
  4. Technical Proposal
  5. Proof of Adherence to the Evaluation Criteria

Please send any questions to the Contracting Officer.

Update #2 ·

AN ADDENDUM HAS BEEN INCORPORATED INTO THIS SOLICITATION. PLEASE USE AND REVIEW ALL NEW VERSIONS OF THE APPLICABLE DOCUMENTATION. 

Argonne National Laboratory is seeking a source for a Flow Sensor Test Article (F-STAr) pump that will be installed in Argonne National Laboratory’s (ANL) Mechanisms Engineering Test Loop (METL). F-STAr is designed to provide submerged high-flowrate experimental testing capabilities for sensor and component testing and development, and to perform fluid studies, in support of sodium-cooled nuclear reactor development. 

*EVALUATION WILL BE BASED ON BEST VALUE METHODOLOGY*

The work shall include the following referenced in the Specification Document dated JUNE 6 ,2024 and attached to this solicitation:

2.1.1 Design and develop the pump in accordance with the Design Requirements in Section 4.
2.1.2 Fabricate the pump in accordance with the Fabrication Requirements in Section 5.
2.1.3 Perform tests in accordance with the Testing Requirements in Section 6.
2.1.4 Perform and document all required certifications, examinations and inspections, control of material, testing, cleaning records, and certifications specified throughout this document.
2.1.5 Provide documentation in accordance with the Quality Assurance and Documentation Requirements in Section 7
2.1.6 Ship and deliver the fabricated items and documentation to Argonne National Laboratory as specified in Section 9.

Please help to provide:

  1. Signed and completed ANL-70 Request for Quotation
  2. Signed and completed ANL-70B Pre-Award Information
  3. Business and Price Proposal 
  4. Technical Proposal
  5. Proof of Adherence to the Evaluation Criteria

Please send any questions to the Contracting Officer.

Update #1 ·

Argonne National Laboratory is seeking a source for a Flow Sensor Test Article (F-STAr) pump that will be installed in Argonne National Laboratory’s (ANL) Mechanisms Engineering Test Loop (METL). F-STAr is designed to provide submerged high-flowrate experimental testing capabilities for sensor and component testing and development, and to perform fluid studies, in support of sodium-cooled nuclear reactor development. 

*EVALUATION WILL BE BASED ON LOWEST PRICE, TECHNICAL ACCEPTABILITY*

The work shall include the following referenced in the Specification Document dated May 8,2024 and attached to this solicitation:
2.1.1 Design and develop the pump in accordance with the Technical Requirements in Section 4.
2.1.2 Fabricate the pump in accordance with the Fabrication Requirements in Section 5.
2.1.3 Perform tests in accordance with the Testing Requirements in Section 5.2.6.
2.1.4 Perform and document all required certifications, examinations and inspections, control of material, testing, cleaning records, and certifications specified throughout this document.
2.1.5 Provide documentation in accordance with the Quality Assurance and Documentation Requirements in Section 7
2.1.6 Ship and deliver the fabricated items and documentation to Argonne National Laboratory as specified in Section 9.

Please help to provide:

  1. Signed and completed ANL-70 Request for Quotation
  2. Signed and completed ANL-70B Pre-Award Information
  3. Evidence of Technical Capability

Please send any questions to the Contracting Officer.

Files

Show all 20

Similar open opportunities

Opportunity Agency Set-aside Responses due
Pump, centrifugal NAICS 333914 Land and Maritime No set-aside
Pump, centrifugal NAICS 333914 Naval Supply Systems Command No set-aside
Pump, centrifugal NAICS 333996 Land and Maritime No set-aside
Pump, MSW NAICS 333914 Naval Supply Systems Command No set-aside
Flowmeter, calibration, and signal conditioners needed for panel modification for ESR United States · NAICS 541380 Shared Services Center Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity