Fire Station and Barracks

Awarded Award Notice Posted

Solicitation number
AG-9702-S-10-0466
Agency
Operations Center Southwest Economic Recovery Operations, Department of Agriculture
Awarded
to Swinerton Builders
Set-aside
No set-aside

Opportunity facts

Contract number
AG-9702-C-10-0315 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Angeles National Forest 701 N. Santa Anita Ave Arcadia, California 91006, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Sep 21, 2010 5:21 pm Award made for 3-bay fire station, one barracks, warehouse and associated items. (sitework, landscaping, etc.) 

Update #5 ·

Added: Jun 30, 2010 5:08 pm Modified: Jul 27, 2010 4:31 pmTrack Changes "RECOVERY" - ARRA (AMERICAN RECOVERY and REINVESTMENT ACT) - This is a PRE-SOLICITATION SYNOPSIS. The USDA Forest Service, Angeles National Forest (hereafter "the Government", "Forest Service", or "Angeles national Forest (NF)") announces a requirement for the Architectural and Engineering Services, followed by construction of a 3 (three) Bay Fire Station and 10 man Barracks with a possible option of one (1) more Barracks and site improvements, on land owned by the US Forest Service in the County of Los Angeles, California. The Fire Center will act as a station and staging area allowing for the increase and decrease of fire resources based on funding and need; and it will serve as home base for fire resources that can be strategically moved in the San Gabriel Canyon to provide coverage for high risk areas. The new Rincon Fire Station is designated to house three fire engines (Rincon, Crystal Lake, and East Fork). The current Rincon engine will remain at the Rincon Fire Station. The Crystal Lake and East Fork engines will be moved to the Rincon site. The water tender, fire prevention technician, and recreation personnel will continue to be co-located at the site. New facilities will be constructed at the Rincon site to house the three engines with personnel, the water tender with personnel, and the fire prevention technician with the Rincon, Crystal Lake, and East Fork engines. The A&E will apply the values of true integrated design that balances aesthetics, cost, sustainability and reliability creates environmentally responsible and superior workplaces for civilian Federal employees; and gives public expression to the Agency's values. The facility will meet Federal Energy Goals, security requirements and current codes governing the design. The proposed action will consist of the following: The existing Rincon, Crystal Lake, and East fork facilities will be demolished and replaced with a newly constructed approximately 5026 square foot energy efficient office/garage building, and one 10-person barracks at Rincon (with a possible option of second 10 person Barracks). The office/garage will include two tandem garage bays, offices, meeting room, weight room, training room, storage rooms and restroom facilities. The work will also include the installation of a new septic system and connection into existing power and water systems. The buildings and site will comply with the Forest Service architectural guidelines, and the relocation of an existing pre-fabricated metal warehouse to a new location at the west area of the site and all site improvements. The work includes the furnishing of labor, equipment, supervision, transportation, lodging, supplies (except those designated as Government furnished), and incidentals to perform all work required under the terms and conditions of the resulting contract. Funds are from the 2009 American recovery and Reinvestment Act (ARRA) and shall be utilized for this project. This acquisition is being advertised as FULL and OPEN COMPETITION to all qualified vendors without restrictions. Contract period of performance time is 16 months after issuance of Notice to Proceed (NTP). The applicable North American Industry Classification System (NAICS) Code is 236220. Contractors are required to be actively registered with the Central Contractors Registration (CCR) system and the Online Representations and Certifications Application (ORCA). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement shall be made for any cost associated with providing information in response to this synopsis, the pending solicitation or any follow up information request. The solicitation with supporting documents (if any) shall be posted to the FedBizOpps.com website on or before July 20, 2010. No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offeror's must download them from the FedBizOpps.com website. This project is located in the Angeles National Forest, 701 N. Santa Anita Ave. Arcadia, CA. 91006. The Government intends to award a Firm-Fixed Price Contract. A best value concept will be applied for evaluation of offers for the procurement. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest-priced or the highest technical-ranked. The Forest Service shall select the proposal that represents the best value based on the evaluation of technical factors and price. Technical factors consist of past performance and technical capability. Technical factors when combined are approximately equal when compared to cost or price. Therefore, the offeror's proposal contain the offeror's best terms. Site visit is scheduled for 10am, July 21, 2010. For technical information or site visit information contact: Mr. George Farra, 626-574-5301. Sit Location: Exit I-210 Azusa offramp in the city of Azusa, CA. Travel North into the forest for approximately 15 miles. Pass East Fork Road, oass the OHV staging area. The Rincon Fire Station will be on the right. Allow approximately 45 min. of travel from I-210 exit. PRE-REGISTRATION IS NOT REQUIRED. SITE VISIT IS NOT MANDATORY. REQUEST FOR INFORMATION (RFI's) SHALL BE ACCEPTED UNTIL: 08-20-2010

Update #4 ·

Added: Jun 30, 2010 5:08 pm Modified: Jul 20, 2010 9:47 amTrack Changes "RECOVERY" - ARRA (AMERICAN RECOVERY and REINVESTMENT ACT) - This is a PRE-SOLICITATION SYNOPSIS. The USDA Forest Service, Angeles National Forest (hereafter "the Government", "Forest Service", or "Angeles national Forest (NF)") announces a requirement for the Architectural and Engineering Services, followed by construction of a 3 (three) Bay Fire Station and 10 man Barracks with a possible option of one (1) more Barracks and site improvements, on land owned by the US Forest Service in the County of Los Angeles, California. The Fire Center will act as a station and staging area allowing for the increase and decrease of fire resources based on funding and need; and it will serve as home base for fire resources that can be strategically moved in the San Gabriel Canyon to provide coverage for high risk areas. The new Rincon Fire Station is designated to house three fire engines (Rincon, Crystal Lake, and East Fork). The current Rincon engine will remain at the Rincon Fire Station. The Crystal Lake and East Fork engines will be moved to the Rincon site. The water tender, fire prevention technician, and recreation personnel will continue to be co-located at the site. New facilities will be constructed at the Rincon site to house the three engines with personnel, the water tender with personnel, and the fire prevention technician with the Rincon, Crystal Lake, and East Fork engines. The A&E will apply the values of true integrated design that balances aesthetics, cost, sustainability and reliability creates environmentally responsible and superior workplaces for civilian Federal employees; and gives public expression to the Agency's values. The facility will meet Federal Energy Goals, security requirements and current codes governing the design. The proposed action will consist of the following: The existing Rincon, Crystal Lake, and East fork facilities will be demolished and replaced with a newly constructed approximately 5026 square foot energy efficient office/garage building, and one 10-person barracks at Rincon (with a possible option of second 10 person Barracks). The office/garage will include two tandem garage bays, offices, meeting room, weight room, training room, storage rooms and restroom facilities. The work will also include the installation of a new septic system and connection into existing power and water systems. The buildings and site will comply with the Forest Service architectural guidelines, and the relocation of an existing pre-fabricated metal warehouse to a new location at the west area of the site and all site improvements. The work includes the furnishing of labor, equipment, supervision, transportation, lodging, supplies (except those designated as Government furnished), and incidentals to perform all work required under the terms and conditions of the resulting contract. Funds are from the 2009 American recovery and Reinvestment Act (ARRA) and shall be utilized for this project. This acquisition is being advertised as FULL and OPEN COMPETITION to all qualified vendors without restrictions. Contract period of performance time is 16 months after issuance of Notice to Proceed (NTP). The applicable North American Industry Classification System (NAICS) Code is 236220. Contractors are required to be actively registered with the Central Contractors Registration (CCR) system and the Online Representations and Certifications Application (ORCA). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement shall be made for any cost associated with providing information in response to this synopsis, the pending solicitation or any follow up information request. The solicitation with supporting documents (if any) shall be posted to the FedBizOpps.com website on or before July 20, 2010. No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offeror's must download them from the FedBizOpps.com website. This project is located in the Angeles National Forest, 701 N. Santa Anita Ave. Arcadia, CA. 91006. The Government intends to award a Firm-Fixed Price Contract. A best value concept will be applied for evaluation of offers for the procurement. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest-priced or the highest technical-ranked. The Forest Service shall select the proposal that represents the best value based on the evaluation of technical factors and price. Technical factors consist of past performance and technical capability. Technical factors when combined are approximately equal when compared to cost or price. Therefore, the offeror's proposal contain the offeror's best terms. Site visit is scheduled for 10am, July 21, 2010. For technical information or site visit information contact: Mr. George Farra, 626-574-5301. Sit Location: Exit I-210 Azusa offramp in the city of Azusa, CA. Travel North into the forest for approximately 15 miles. Pass East Fork Road, oass the OHV staging area. The Rincon Fire Station will be on the right. Allow approximately 45 min. of travel from I-210 exit. PRE-REGISTRATION IS NOT REQUIRED. SITE VISIT IS NOT MANDATORY. 

Update #3 ·

Added: Jun 30, 2010 5:08 pm Modified: Jul 19, 2010 2:32 pmTrack Changes "RECOVERY" - ARRA (AMERICAN RECOVERY and REINVESTMENT ACT) - This is a PRE-SOLICITATION SYNOPSIS. The USDA Forest Service, Angeles National Forest (hereafter "the Government", "Forest Service", or "Angeles national Forest (NF)") announces a requirement for the Architectural and Engineering Services, followed by construction of a 3 (three) Bay Fire Station and 10 man Barracks with a possible option of one (1) more Barracks and site improvements, on land owned by the US Forest Service in the County of Los Angeles, California. The Fire Center will act as a station and staging area allowing for the increase and decrease of fire resources based on funding and need; and it will serve as home base for fire resources that can be strategically moved in the San Gabriel Canyon to provide coverage for high risk areas. The new Rincon Fire Station is designated to house three fire engines (Rincon, Crystal Lake, and East Fork). The current Rincon engine will remain at the Rincon Fire Station. The Crystal Lake and East Fork engines will be moved to the Rincon site. The water tender, fire prevention technician, and recreation personnel will continue to be co-located at the site. New facilities will be constructed at the Rincon site to house the three engines with personnel, the water tender with personnel, and the fire prevention technician with the Rincon, Crystal Lake, and East Fork engines. The A&E will apply the values of true integrated design that balances aesthetics, cost, sustainability and reliability creates environmentally responsible and superior workplaces for civilian Federal employees; and gives public expression to the Agency's values. The facility will meet Federal Energy Goals, security requirements and current codes governing the design. The proposed action will consist of the following: The existing Rincon, Crystal Lake, and East fork facilities will be demolished and replaced with a newly constructed approximately 5026 square foot energy efficient office/garage building, and one 10-person barracks at Rincon (with a possible option of second 10 person Barracks). The office/garage will include two tandem garage bays, offices, meeting room, weight room, training room, storage rooms and restroom facilities. The work will also include the installation of a new septic system and connection into existing power and water systems. The buildings and site will comply with the Forest Service architectural guidelines, and the relocation of an existing pre-fabricated metal warehouse to a new location at the west area of the site and all site improvements. The work includes the furnishing of labor, equipment, supervision, transportation, lodging, supplies (except those designated as Government furnished), and incidentals to perform all work required under the terms and conditions of the resulting contract. Funds are from the 2009 American recovery and Reinvestment Act (ARRA) and shall be utilized for this project. This acquisition is being advertised as FULL and OPEN COMPETITION to all qualified vendors without restrictions. Contract period of performance time is 16 months after issuance of Notice to Proceed (NTP). The applicable North American Industry Classification System (NAICS) Code is 236220. Contractors are required to be actively registered with the Central Contractors Registration (CCR) system and the Online Representations and Certifications Application (ORCA). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement shall be made for any cost associated with providing information in response to this synopsis, the pending solicitation or any follow up information request. The solicitation with supporting documents (if any) shall be posted to the FedBizOpps.com website on or before July 20, 2010. No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offeror's must download them from the FedBizOpps.com website. This project is located in the Angeles National Forest, 701 N. Santa Anita Ave. Arcadia, CA. 91006. The Government intends to award a Firm-Fixed Price Contract. A best value concept will be applied for evaluation of offers for the procurement. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest-priced or the highest technical-ranked. The Forest Service shall select the proposal that represents the best value based on the evaluation of technical factors and price. Technical factors consist of past performance and technical capability. Technical factors when combined are approximately equal when compared to cost or price. Therefore, the offeror's proposal contain the offeror's best terms. Site visit is scheduled for July 21, 2010. For technical information or site visit information contact: Mr. George Farra, 626-574-5301. Sit Location: Exit I-210 Azusa offramp in the city of Azusa, CA. Travel North into the forest for approximately 15 miles. Pass East Fork Road, oass the OHV staging area. The Rincon Fire Station will be on the right. Allow approximately 45 min. of travel from I-210 exit. PRE-REGISTRATION IS NOT REQUIRED. SITE VISIT IS NOT MANDATORY. 

Update #2 ·

Added: Jun 30, 2010 5:08 pm Modified: Jul 19, 2010 2:19 pmTrack Changes "RECOVERY" - ARRA (AMERICAN RECOVERY and REINVESTMENT ACT) - This is a PRE-SOLICITATION SYNOPSIS. The USDA Forest Service, Angeles National Forest (hereafter "the Government", "Forest Service", or "Angeles national Forest (NF)") announces a requirement for the Architectural and Engineering Services, followed by construction of a 3 (three) Bay Fire Station and 10 man Barracks with a possible option of one (1) more Barracks and site improvements, on land owned by the US Forest Service in the County of Los Angeles, California. The Fire Center will act as a station and staging area allowing for the increase and decrease of fire resources based on funding and need; and it will serve as home base for fire resources that can be strategically moved in the San Gabriel Canyon to provide coverage for high risk areas. The new Rincon Fire Station is designated to house three fire engines (Rincon, Crystal Lake, and East Fork). The current Rincon engine will remain at the Rincon Fire Station. The Crystal Lake and East Fork engines will be moved to the Rincon site. The water tender, fire prevention technician, and recreation personnel will continue to be co-located at the site. New facilities will be constructed at the Rincon site to house the three engines with personnel, the water tender with personnel, and the fire prevention technician with the Rincon, Crystal Lake, and East Fork engines. The A&E will apply the values of true integrated design that balances aesthetics, cost, sustainability and reliability creates environmentally responsible and superior workplaces for civilian Federal employees; and gives public expression to the Agency's values. The facility will meet Federal Energy Goals, security requirements and current codes governing the design. The proposed action will consist of the following: The existing Rincon, Crystal Lake, and East fork facilities will be demolished and replaced with a newly constructed approximately 5026 square foot energy efficient office/garage building, and one 10-person barracks at Rincon (with a possible option of second 10 person Barracks). The office/garage will include two tandem garage bays, offices, meeting room, weight room, training room, storage rooms and restroom facilities. The work will also include the installation of a new septic system and connection into existing power and water systems. The buildings and site will comply with the Forest Service architectural guidelines, and the relocation of an existing pre-fabricated metal warehouse to a new location at the west area of the site and all site improvements. The work includes the furnishing of labor, equipment, supervision, transportation, lodging, supplies (except those designated as Government furnished), and incidentals to perform all work required under the terms and conditions of the resulting contract. Funds are from the 2009 American recovery and Reinvestment Act (ARRA) and shall be utilized for this project. This acquisition is being advertised as FULL and OPEN COMPETITION to all qualified vendors without restrictions. Contract period of performance time is 16 months after issuance of Notice to Proceed (NTP). The applicable North American Industry Classification System (NAICS) Code is 236220. Contractors are required to be actively registered with the Central Contractors Registration (CCR) system and the Online Representations and Certifications Application (ORCA). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement shall be made for any cost associated with providing information in response to this synopsis, the pending solicitation or any follow up information request. The solicitation with supporting documents (if any) shall be posted to the FedBizOpps.com website on or before July 20, 2010. No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offeror's must download them from the FedBizOpps.com website. This project is located in the Angeles National Forest, 701 N. Santa Anita Ave. Arcadia, CA. 91006. The Government intends to award a Firm-Fixed Price Contract. A best value concept will be applied for evaluation of offers for the procurement. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest-priced or the highest technical-ranked. The Forest Service shall select the proposal that represents the best value based on the evaluation of technical factors and price. Technical factors consist of past performance and technical capability. Technical factors when combined are approximately equal when compared to cost or price. Therefore, the offeror's proposal contain the offeror's best terms. Site visit is scheduled for July 21, 2010. For technical information or site visit information contact: Mr. George Farra, 626-574-5301

Update #1 ·

Added: Jun 30, 2010 5:08 pm "RECOVERY" - ARRA (AMERICAN RECOVERY and REINVESTMENT ACT) - This is a PRE-SOLICITATION SYNOPSIS. The USDA Forest Service, Angeles National Forest (hereafter "the Government", "Forest Service", or "Angeles national Forest (NF)") announces a requirement for the Architectural and Engineering Services, followed by construction of a 3 (three) Bay Fire Station and 10 man Barracks with a possible option of one (1) more Barracks and site improvements, on land owned by the US Forest Service in the County of Los Angeles, California. The Fire Center will act as a station and staging area allowing for the increase and decrease of fire resources based on funding and need; and it will serve as home base for fire resources that can be strategically moved in the San Gabriel Canyon to provide coverage for high risk areas. The new Rincon Fire Station is designated to house three fire engines (Rincon, Crystal Lake, and East Fork). The current Rincon engine will remain at the Rincon Fire Station. The Crystal Lake and East Fork engines will be moved to the Rincon site. The water tender, fire prevention technician, and recreation personnel will continue to be co-located at the site. New facilities will be constructed at the Rincon site to house the three engines with personnel, the water tender with personnel, and the fire prevention technician with the Rincon, Crystal Lake, and East Fork engines. The A&E will apply the values of true integrated design that balances aesthetics, cost, sustainability and reliability creates environmentally responsible and superior workplaces for civilian Federal employees; and gives public expression to the Agency's values. The facility will meet Federal Energy Goals, security requirements and current codes governing the design. The proposed action will consist of the following: The existing Rincon, Crystal Lake, and East fork facilities will be demolished and replaced with a newly constructed approximately 5026 square foot energy efficient office/garage building, and one 10-person barracks at Rincon (with a possible option of second 10 person Barracks). The office/garage will include two tandem garage bays, offices, meeting room, weight room, training room, storage rooms and restroom facilities. The work will also include the installation of a new septic system and connection into existing power and water systems. The buildings and site will comply with the Forest Service architectural guidelines, and the relocation of an existing pre-fabricated metal warehouse to a new location at the west area of the site and all site improvements. The work includes the furnishing of labor, equipment, supervision, transportation, lodging, supplies (except those designated as Government furnished), and incidentals to perform all work required under the terms and conditions of the resulting contract. Funds are from the 2009 American recovery and Reinvestment Act (ARRA) and shall be utilized for this project. This acquisition is being advertised as FULL and OPEN COMPETITION to all qualified vendors without restrictions. Contract period of performance time is 16 months after issuance of Notice to Proceed (NTP). The applicable North American Industry Classification System (NAICS) Code is 236220. Contractors are required to be actively registered with the Central Contractors Registration (CCR) system and the Online Representations and Certifications Application (ORCA). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement shall be made for any cost associated with providing information in response to this synopsis, the pending solicitation or any follow up information request. The solicitation with supporting documents (if any) shall be posted to the FedBizOpps.com website on or before July 14, 2010. No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offeror's must download them from the FedBizOpps.com website. This project is located in the Angeles National Forest, 701 N. Santa Anita Ave. Arcadia, CA. 91006. The Government intends to award a Firm-Fixed Price Contract. A best value concept will be applied for evaluation of offers for the procurement. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest-priced or the highest technical-ranked. The Forest Service shall select the proposal that represents the best value based on the evaluation of technical factors and price. Technical factors consist of past performance and technical capability. Technical factors when combined are approximately equal when compared to cost or price. Therefore, the offeror's proposal contain the offeror's best terms. Site visit is scheduled for July 21, 2010. For technical information or site visit information contact: Mr. George Farra, 626-574-5301

Attachments

Files attached to this notice, newest first
File Type Posted
New RFI Questions-Answers Rincon 8-17-10.doc DOC document
NEW 1442 Davis Bacon Rates.docx DOCX document
New 0466 Statement of Work.doc DOC document
08-11-10 New Schedule of Items.pdf PDF
New 0466 Statement of Work —
New Specs 08-11-10.zip ZIP file
08-10-10 Revised New Pre-Proposal Site Visit Q A.docx DOCX document
08-10-10 AG-9702-S-10-0466 Statement of Work —
08-10-10 1442 AG-9702-S-10-0466 CLAUSES page 4.rtf RTF text file
08-10-10 AG-9702-S-10-0466 1442.pdf PDF
ATTENTION.docx DOCX document
Rincon Barracks Specs.pdf PDF
Rincon Fire Station Civil Specs.pdf PDF
Rincon_Schedule_Rev01.xlsx XLSX spreadsheet
Drawings_Barracks.pdf PDF
CIVIL_DRAWINGS.pdf PDF
270000 Telecommunications Wiring System.pdf PDF
Rincon_Schedule_Rev01.pdf PDF
Drawings_Fire_Station.pdf PDF
AG-9702-S-10-0466 Site Attendees.pdf PDF
AG-9702-S-10-0466 Pre-Proposal - Remarks.docx DOCX document
Rincon_Specifications.zip ZIP file
Rincon_Conceptial_11_-_Standard.zip ZIP file
AG-9702-S-10-0466 Rincon Fire Station RFP.pdf PDF
AG-9702-S-10-0466 Solicitation page 3.rtf RTF text file
Rincon_Civil_Drawings_2.zip ZIP file
Schedule_Fire_Station_Rincon_03.xlsx XLSX spreadsheet
Schedule of Items.pdf PDF
Show all 28

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity