Rincon_Schedule_Rev01.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Fire Station and Barracks Federal contract opportunity
Solicitation number
AG-9702-S-10-0466
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Rincon Schedule Rev-01 Spread Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Fire Station and Barracks, newest first.
File Type Posted
New RFI Questions-Answers Rincon 8-17-10.doc DOC document
NEW 1442 Davis Bacon Rates.docx DOCX document
08-11-10 New Schedule of Items.pdf PDF
New 0466 Statement of Work.doc DOC document
New 0466 Statement of Work —
New Specs 08-11-10.zip ZIP file
08-10-10 Revised New Pre-Proposal Site Visit Q A.docx DOCX document
08-10-10 AG-9702-S-10-0466 Statement of Work —
08-10-10 1442 AG-9702-S-10-0466 CLAUSES page 4.rtf RTF text file
08-10-10 AG-9702-S-10-0466 1442.pdf PDF
ATTENTION.docx DOCX document
Rincon Fire Station Civil Specs.pdf PDF
Rincon Barracks Specs.pdf PDF
Drawings_Barracks.pdf PDF
CIVIL_DRAWINGS.pdf PDF
270000 Telecommunications Wiring System.pdf PDF
Rincon_Schedule_Rev01.pdf PDF
Drawings_Fire_Station.pdf PDF
AG-9702-S-10-0466 Site Attendees.pdf PDF
AG-9702-S-10-0466 Pre-Proposal - Remarks.docx DOCX document
Rincon_Specifications.zip ZIP file
Rincon_Conceptial_11_-_Standard.zip ZIP file
AG-9702-S-10-0466 Rincon Fire Station RFP.pdf PDF
AG-9702-S-10-0466 Solicitation page 3.rtf RTF text file
Rincon_Civil_Drawings_2.zip ZIP file
Schedule_Fire_Station_Rincon_03.xlsx XLSX spreadsheet
Schedule of Items.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SOLICITATION NO.:
Project:RINCON Fire Station
Angeles National Forest
SCHEDULE OF ITEMS
BIDDERS PLEASE NOTE: BEFORE PREPARING PROPOSAL, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION.
BIDDERS ARE FURTHER CAUTIONED TO INSPECT THE CONSTRUCTION SITE & INVESTIGATE TRANSPORTING,
WEATHER, AND LOCAL LABOR CONDITIONS.
ITEM NO.DESCRIPTIONESTD QNTYUNITUNIT PRICEAMOUNT
1GENERAL REQUIREMENTS
a)MOBILIZATION1JOB
2EXISTING CONDITIONS
a)DEMOLITION1JOB
3CONCRETE
a)CAST-IN-PLACE CONCRETE NOT INCLUDING BUILDINGS34CU.YD.
b)REINFORCED CONCRETE FOUNDATION FOR RELOCATED WAREHOUSE BLDG785CU.YD.
c)RECREATION BUILDING WALKWAY & LANDING (10'X10')6CU.YD.
d)LPG CONCRETE SLAB2CU.YD.
4WOOD, PLASTICS, AND COMPOSITES
a)RECREATION BUILDING STAIRS1JOB
5EQUIPMENT
a)AUDIO/VISUAL EQUIPMENT1JOB
6BUILDINGS
a)CONSTRUCTION OF NEW BARRACK BLDG (NEW BARRACK BLDG 1)1JOB
b)CONSTRUCTION OF NEW FIRE STATION1JOB
C)RELOCATION OF EXISTING WAREHOUSE BLDG1JOB
7STRUCTURES
a)TYPE 1 RAMADA SHADE STRUCTURE (56'X44')1EA
b)TYPE 2 RAMADA SHADE STRUCTURE (56'X37.33')2EA
8WATER DISTRIBUTION SYSTEMS
a)6" GATE VALVE2EA
b)4" GATE VALVE1EA
c)1" GATE VALVE4EA
d)VALVE BOX6EA
e)PRESSURE REDUCING VALVES3EA
f)HOSEBIB1EA
g)6" PVC (C900)3920L.FT.
h)4" PVC (C900)178L.FT.
i)2" PVC (SCHEDULE 80)6535L.FT.
j)1" PVC (SCHEDULE 80)280L.FT.
k)TRENCH EXCAVATION AND FILL FOR NEW WATER LINE10635L.FT.
9HYDRANTS AND SAMPLING STATIONS
a)WET BARREL FIRE HYDRANT2EA
b)SAMPLING STATION1EA
10SEWER SYSTEM
a)SELECT BACKFILL FOR TRENCHES & LEACH FIELD304CU.YD.
b)4" ABS424L.FT.
c)4' ABS WYE3EA
d)4" ABS BENDS 22.5º, 45º, 90º & CO15EA
e)PRECAST CONCRETE MANHOLES1JOB
f)SHORING1JOB
g)4" PERFORATED ABS261L.FT.
h)FILTER MATERIAL FOR LEACH FIELD50CU.YD.
i)PAPER (GEOTEXTILE) & MARKING TAPE1JOB
j)SEPTIC TANK1EA
11LIGHTING
a)EXTERIOR LIGHTING INCLUDING FOUNDATION25EA
12COMMUNICATIONS
a)TELECOMMUNICATIONS SYSTEMS (See Appendix)1JOB
b)SATELLITE TELEVISION DISTRIBUTION SYSTEMS1JOB
13ELECTRONIC SAFETY AND SECURITY
a)ACCESS CONTROL1JOB
b)FIRE ALARM SYSTEMS1JOB
14SITE DEVELOPMENT & GRADING
a)GRADING4150CU.YD.
b)TRENCHING895L.FT.
c)EROSION AND SEDIMENTATION CONTROL70CU.YD.
d)6" DG LAYER3290S.YD.
e)EXCAVATION & RECOMPACTION BELOW NEW BUILDINGS1949CU.YD.
15COMPACTED MILLED AGGREGATE BASE
a)6" MILLED AGGREGATE BASE, PLACED & COMPACTED6409S.YD.
16HOT BITUMINOUS PAVEMENT
a)3" DEPTH HOT BITUMINOUS PAVING979TON
17HOT BITUMINOUS CURBING
a)6" DEPTH AROUND NEW PAVED SURFACES545L.FT.
18PAINTED TRAFFIC MARKINGS
a)HANDICAP SYMBOLS6EA
b)PAVEMENT MARKINGS, TYPE B, FOR PARKING LOT LINES1089L.FT.
19SIGNS
a)FURNISH & INSTALL ENTRY "RINCON FIRE STATION"1EA
b)FURNISH & INSTALL HANDICAP PARKING SIGNS AT DESIGNATED LOCATION6EA
c)FURNISH & INSTALL "ARRA" SIGN1EA
20WHEEL STOPS
a)FURNISH & INSTALL31EA
21LIQUIFIED PETROLEUM GAS SYSTEM
a)1" LPG DISTRIBUTION PIPE285L.FT.
b)3/4" LPG DISTRIBUTION PIPE75L.FT.
c)1/2" LPG DISTRIBUTION PIPE410L.FT.
d)LINE CONNECTION ASSEMBLY1JOB
e)FURNISH & INSTALL 1000-GALLON LP GAS TANK1EA
f)BOLLARDS (INCLUDING FOUNDATION AND PAINT)7EA
22FENCING
a)8' CHAIN-LINK SLOTTED FENCING, INLCLUDING FOOTING720L.FT.
23SITE ELECTRICAL
a)ELECTRICAL SYSTEM & TELECOMMUNICATIONS1JOB
b)BOLLARDS (INCLUDING FOUNDATION AND PAINT)2EA

OPTIONAL ITEMS

24BUILDINGS - OPTION 1
a)CONSTRUCTION OF ADDITIONAL BARRACK BLDG (NEW BARRACK BLDG 2)1JOB
25COMPACTED AGGREGATE BASE - OPTION 2
a)NEW 6" LAYER AGGREGATE BASE, PLACED & COMPACTED735TON
16HOT BITUMINOUS PAVEMENT - OPTION 3
a)3" DEPTH HOT BITUMINOUS PAVING200TON
26FENCING - OPTION 4
a)8' CHAIN-LINK SLOTTED FENCING, INLCLUDING FOOTING759L.FT.
27LANDSCAPING - OPTION 5
a)PLANTING VEGETATION ADJACENT TO NEW BUILDINGS1JOB
TOTAL: