AG-9702-S-10-0466 Pre-Proposal - Remarks.docx

DOCX document 21 KB Posted

Attached to
Fire Station and Barracks Federal contract opportunity
Solicitation number
AG-9702-S-10-0466
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

View the file

Other files for this federal contract opportunity

Other files attached to Fire Station and Barracks, newest first.
File Type Posted
New RFI Questions-Answers Rincon 8-17-10.doc DOC document
New 0466 Statement of Work.doc DOC document
NEW 1442 Davis Bacon Rates.docx DOCX document
08-11-10 New Schedule of Items.pdf PDF
New 0466 Statement of Work —
New Specs 08-11-10.zip ZIP file
08-10-10 Revised New Pre-Proposal Site Visit Q A.docx DOCX document
08-10-10 AG-9702-S-10-0466 Statement of Work —
08-10-10 1442 AG-9702-S-10-0466 CLAUSES page 4.rtf RTF text file
08-10-10 AG-9702-S-10-0466 1442.pdf PDF
ATTENTION.docx DOCX document
Rincon Barracks Specs.pdf PDF
Rincon Fire Station Civil Specs.pdf PDF
Drawings_Fire_Station.pdf PDF
Rincon_Schedule_Rev01.xlsx XLSX spreadsheet
Drawings_Barracks.pdf PDF
CIVIL_DRAWINGS.pdf PDF
270000 Telecommunications Wiring System.pdf PDF
Rincon_Schedule_Rev01.pdf PDF
AG-9702-S-10-0466 Site Attendees.pdf PDF
Rincon_Specifications.zip ZIP file
Rincon_Conceptial_11_-_Standard.zip ZIP file
AG-9702-S-10-0466 Rincon Fire Station RFP.pdf PDF
AG-9702-S-10-0466 Solicitation page 3.rtf RTF text file
Rincon_Civil_Drawings_2.zip ZIP file
Schedule_Fire_Station_Rincon_03.xlsx XLSX spreadsheet
Schedule of Items.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9702-S-10-0466

RECOVERY: Rincon Fire Station & Barracks, ANF

PRE-PROPOSAL SITE VISIT QUESTIONS & REMARKS

July 21, 2010

The following are questions and remarks that were presented at the Rincon Pre-Proposal Site Visit which took place on July 21, 2010 at 10:00 a.m. The Forest Service representatives on site were George Farra (Assistant Forest Engineer), Joel Gonzalez (Civil Engineer), Mike Florey (Project Manager), Loring Buchwald (Battalion Chief) and Ricardo Lopez (Civil Engineer). We introduced the Forest Service representatives to the contractors and made general statements about the contract and the site. We presented the overall expectations, constraints, and requirements of the project. A sign-in sheet was passed around, to be filled out by parties who did have business cards.

General topics discussed by the Forest Service representatives, during the site visit (revised by CO):

· The project is no longer design-build; it is now a construction project with A&E components

· Due date is August 20, 2010

· Anticipated start of planned construction begins at the end of September

· There will be a posting on FedBizOpps of the site being open for anybody to come and do their own walk-around the job site. Typically, there will be fire staff at Rincon Monday through Friday from 9:00 a.m. to 6:00 p.m. but there is no guarantee that someone will be present at any given time due to response to incidents

· For fire prevention on the equipment to be used, contact the Forest Service to arrange for permitting

· Once the project begins, the contractor shall call the Dispatch Center phone number listed on the fire plan and check on what operations are allowed to perform on any given day

· There is limited communication capability in the forest, including little to no signal for mobile phones. There may be satellite phone signal and prospective bidders are encouraged to plan on communicating with each other through radio system(s) while on the site

· There will be no further design changes posted

Questions (Q##:) asked by prospective bidders and Responses (R##:) from the Forest Service representatives, during the pre-bid meeting are as follows:

Q01:What will the water source be for construction?
R01:The contractor will have limited access to water (for construction purposes only) at the water tank located above the Rincon Fire Station. An approved source location for a water, to be used solely for construction purposes by the contractor, will be designated at the prework meeting. The site will be within 5 miles of the project location.
Q02:What will be the last day to submit RFI’s and ask questions?
R02:Typically, we will be able to address RFI’s 4 to 5 days prior to the due date for proposals. We will discuss this with the Contracting Officer and respond with an official date to submit RFI’s, to be posted on FedBizOpps. Per CO: RFIs should be submitted by August 12, 2010.
Q03:What will happen to the fire and recreation personnel on site?
R03:The fire staff will be relocated to nearby fire station(s) during the week. On weekends, the fire staff may be at the project location. The recreation staff may be present (in the existing recreation building, not to be demolished) during construction and will not interfere with the contractor’s work.
Q04:Are there any connections for mobile units such as sewer, power, etc.?
R04:No, none will be provided. The contractor shall be responsible for obtaining their own utility sources, including power and telephone as needed.
Q05:Are there any restrictions on the working hours or hours of operation for which construction may occur?
R05:There is no limit on the hours of operation but prospective bidders are cautioned to follow labor rules on hours worked. Contractors are also cautioned to read the solicitation documents for more information on labor, including Davis-Bacon wages and other pertinent information.
Q06:What utility poles will remain and which will be demolished?
R06:The Edison power pole by the entrance gate shall remain in place and shall be protected during construction. The telephone pole shall be removed as SHOWN ON THE DEMOLITION PLAN.
Q07:Is there a specific area that is designated as a staging area for equipment?
R07:The contractor is responsible for proposing a staging area which needs to be approved by the Contracting Officer.
Q08:Are there any known hazardous materials on site?
R08:To our knowledge, there are no existing hazardous materials within the project site. If a differing site conditions presents itself during construction, we will deal with it accordingly at that time.
Q09:Do we submit RFI’s to the Contracting Officer?
R09:Yes, prospective bidders are required to submit RFI’s to the Contracting Officer. Send to the CO via email address jsclayton@fs.fed.us
Q09:Are we required to conform to any environmental regulations for this project?
R09:Specific environmental concerns will be addressed at the pre-work meeting with the successful offeror. When preparing your proposal use common sense regarding environmental concerns. Basically, do not disturb pristine areas, mitigate run-off erosion and potential pollution from the construction site.