Schedule of Items.pdf

PDF 32 KB Posted

Attached to
Fire Station and Barracks Federal contract opportunity
Solicitation number
AG-9702-S-10-0466
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Fire Station and Barracks, newest first.
File Type Posted
New RFI Questions-Answers Rincon 8-17-10.doc DOC document
NEW 1442 Davis Bacon Rates.docx DOCX document
08-11-10 New Schedule of Items.pdf PDF
New 0466 Statement of Work.doc DOC document
New 0466 Statement of Work —
New Specs 08-11-10.zip ZIP file
08-10-10 Revised New Pre-Proposal Site Visit Q A.docx DOCX document
08-10-10 AG-9702-S-10-0466 Statement of Work —
08-10-10 1442 AG-9702-S-10-0466 CLAUSES page 4.rtf RTF text file
08-10-10 AG-9702-S-10-0466 1442.pdf PDF
ATTENTION.docx DOCX document
Rincon Fire Station Civil Specs.pdf PDF
Rincon Barracks Specs.pdf PDF
Rincon_Schedule_Rev01.xlsx XLSX spreadsheet
Drawings_Barracks.pdf PDF
CIVIL_DRAWINGS.pdf PDF
270000 Telecommunications Wiring System.pdf PDF
Rincon_Schedule_Rev01.pdf PDF
Drawings_Fire_Station.pdf PDF
AG-9702-S-10-0466 Site Attendees.pdf PDF
AG-9702-S-10-0466 Pre-Proposal - Remarks.docx DOCX document
Rincon_Specifications.zip ZIP file
Rincon_Conceptial_11_-_Standard.zip ZIP file
AG-9702-S-10-0466 Rincon Fire Station RFP.pdf PDF
AG-9702-S-10-0466 Solicitation page 3.rtf RTF text file
Rincon_Civil_Drawings_2.zip ZIP file
Schedule_Fire_Station_Rincon_03.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO.:

Project: RINCON Fire Station

BIDDERS PLEASE NOTE: BEFORE PREPARING PROPOSAL, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION.

ITEM

NO.

ESTD

QNTY UNIT

UNIT

PRICE AMOUNT

a) 1 JOB

a) 1 JOB

a) 34 CU.YD.

b) 785 CU.YD.

c) 6 CU.YD.

d) 2 CU.YD.

a) 1 JOB

a) 1 JOB

a) 1 JOB

b) CONSTRUCTION OF NEW FIRE STATION 1 JOB

a) 1 EA

b) 2 EA

a) 2 EA

b) 1 EA

c) 4 EA

d) 6 EA

e) 3 EA

f) 1 EA

g) 3920 L.FT.

h) 178 L.FT.

i) 6535 L.FT.

j) 280 L.FT.

k) 10635 L.FT.

a) 2 EA

b) 1 EA

a) 304 CU.YD.

b) 424 L.FT.

c) 3 EA

d) 15 EA

e) 1 JOB

f) 1 JOB

g) 261 L.FT.

CAST-IN-PLACE CONCRETE NOT INCLUDING BUILDINGS

REINFORCED CONCRETE FOUNDATION FOR RELOCATED WAREHOUSE BLDG

RECREATION BUILDING WALKWAY & LANDING (10'X10')

RECREATION BUILDING STAIRS

MOBILIZATION

DEMOLITION

LPG CONCRETE SLAB

DESCRIPTION

GENERAL REQUIREMENTS

EXISTING CONDITIONS

CONCRETE

WOOD, PLASTICS, AND COMPOSITES

Angeles National Forest

BIDDERS ARE FURTHER CAUTIONED TO INSPECT THE CONSTRUCTION SITE & INVESTIGATE TRANSPORTING, WEATHER, AND LOCAL LABOR CONDITIONS.

SCHEDULE OF ITEMS

AUDIO/VISUAL EQUIPMENT

6" GATE VALVE

TYPE 1 RAMADA SHADE STRUCTURE (56'X44')

TYPE 2 RAMADA SHADE STRUCTURE (56'X37.33')

CONSTRUCTION OF NEW BARRACK BLDG (NEW BARRACK BLDG 1)

EQUIPMENT

BUILDINGS

STRUCTURES

WATER DISTRIBUTION SYSTEMS

PRESSURE REDUCING VALVES

4" PERFORATED ABS

4" ABS

4' ABS WYE

4" ABS BENDS 22.5º, 45º, 90º & CO

PRECAST CONCRETE MANHOLES

SHORING

WET BARREL FIRE HYDRANT

SAMPLING STATION

SELECT BACKFILL FOR TRENCHES & LEACH FIELD

2" PVC (SCHEDULE 80)

1" PVC (SCHEDULE 80)

TRENCH EXCAVATION AND FILL FOR NEW WATER LINE

4" GATE VALVE

1" GATE VALVE

VALVE BOX

HYDRANTS AND SAMPLING STATIONS

SEWER SYSTEM

HOSEBIB

6" PVC (C900)

4" PVC (C900)

BIDDERS PLEASE NOTE: BEFORE PREPARING PROPOSAL, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION.

ITEM

NO.

ESTD

QNTY UNIT

UNIT

PRICE AMOUNTDESCRIPTION

GENERAL REQUIREMENTS

Angeles National Forest

BIDDERS ARE FURTHER CAUTIONED TO INSPECT THE CONSTRUCTION SITE & INVESTIGATE TRANSPORTING, WEATHER, AND LOCAL LABOR CONDITIONS.

SCHEDULE OF ITEMS

h) 50 CU.YD.

i) 1 JOB

j) 1 EA

a) 25 EA

a) 1 JOB

b) 1 JOB

a) 1 JOB

b) 1 JOB

a) 4150 CU.YD.

b) 895 L.FT.

c) 70 CU.YD.

d) 3290 S.YD.

e) 1949 CU.YD.

a) 6409 S.YD.

a) 979 TON

a) 545 L.FT.

a) 6 EA

b) 1089 L.FT.

a) 1 EA

b) 6 EA

c) FURNISH & INSTALL "ARRA" SIGN 1 EA

a) 31 EA

a) 285 L.FT.

b) 75 L.FT.

c) 410 L.FT.

d) 1 JOB

e) 1 EA

f) 7 EA

ACCESS CONTROL

FIRE ALARM SYSTEMS

EXTERIOR LIGHTING INCLUDING FOUNDATION

TELECOMMUNICATIONS SYSTEMS (See Appendix)

FILTER MATERIAL FOR LEACH FIELD

PAPER (GEOTEXTILE) & MARKING TAPE

SEPTIC TANK

6" DG LAYER

EXCAVATION & RECOMPACTION BELOW NEW BUILDINGS

6" MILLED AGGREGATE BASE, PLACED & COMPACTED

GRADING

TRENCHING

EROSION AND SEDIMENTATION CONTROL

SITE DEVELOPMENT & GRADING

COMPACTED MILLED AGGREGATE BASE

6" DEPTH AROUND NEW PAVED SURFACES

HANDICAP SYMBOLS

PAVEMENT MARKINGS, TYPE B, FOR PARKING LOT LINES

3" DEPTH HOT BITUMINOUS PAVING

HOT BITUMINOUS PAVEMENT

HOT BITUMINOUS PAVEMENT

PAINTED TRAFFIC MARKINGS

FURNISH & INSTALL

1" LPG DISTRIBUTION PIPE

FURNISH & INSTALL ENTRY "RINCON FIRE STATION"

FURNISH & INSTALL HANDICAP PARKING SIGNS AT DESIGNATED LOCATION

SIGNS

WHEEL STOPS

LIQUIFIED PETROLEUM GAS SYSTEM

3/4" LPG DISTRIBUTION PIPE

1/2" LPG DISTRIBUTION PIPE

LINE CONNECTION ASSEMBLY

FURNISH & INSTALL 1000-GALLON LP GAS TANK

BOLLARDS (INCLUDING FOUNDATION AND PAINT)

LIGHTING

COMMUNICATIONS

ELECTRONIC SAFETY AND SECURITY

SATELLITE TELEVISION DISTRIBUTION SYSTEMS

BIDDERS PLEASE NOTE: BEFORE PREPARING PROPOSAL, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION.

ITEM

NO.

ESTD

QNTY UNIT

UNIT

PRICE AMOUNTDESCRIPTION

GENERAL REQUIREMENTS

Angeles National Forest

BIDDERS ARE FURTHER CAUTIONED TO INSPECT THE CONSTRUCTION SITE & INVESTIGATE TRANSPORTING, WEATHER, AND LOCAL LABOR CONDITIONS.

SCHEDULE OF ITEMS

a) 720 L.FT.

a) 1 JOB

b) 2 EA

a) 1 JOB

a) 735 TON

a) 200 TON

a) 759 L.FT.

TOTAL:

IF BIDS ARE NOT SUBMITTED ON ANY ITEMS AND SUB-ITEMS, BID MAY

BE CONSIDERED NON-RESPONSIVE.

8' CHAIN-LINK SLOTTED FENCING, INLCLUDING FOOTING

ELECTRICAL SYSTEM & TELECOMMUNICATIONS

FENCING

SITE ELECTRICAL

CONSTRUCTION OF ADDITIONAL BARRACK BLDG (NEW BARRACK BLDG 2)

NEW 6" LAYER AGGREGATE BASE, PLACED & COMPACTED

BOLLARDS (INCLUDING FOUNDATION AND PAINT)

8' CHAIN-LINK SLOTTED FENCING, INLCLUDING FOOTING

OPTIONAL ITEMS

BUILDINGS-OPTION1

COMPACTED AGGREGATE BASE-OPTION 2

FENCING-OPTION 4

HOT BITUMINOUS PAVEMENT - OPTION 3

3" DEPTH HOT BITUMINOUS PAVING

File details come from the government source that posted it. Updated .