New RFI Questions-Answers Rincon 8-17-10.doc

DOC document 32 KB Posted

Attached to
Fire Station and Barracks
Solicitation number
AG-9702-S-10-0466
Issued by

About this file

Questions Answers 10/17/2010

View the file

Other files

File Type Posted
New 0466 Statement of Work.doc DOC document
NEW 1442 Davis Bacon Rates.docx DOCX document
08-11-10 New Schedule of Items.pdf PDF
New 0466 Statement of Work —
New Specs 08-11-10.zip ZIP file
08-10-10 Revised New Pre-Proposal Site Visit Q A.docx DOCX document
08-10-10 AG-9702-S-10-0466 Statement of Work —
08-10-10 1442 AG-9702-S-10-0466 CLAUSES page 4.rtf RTF text file
08-10-10 AG-9702-S-10-0466 1442.pdf PDF
ATTENTION.docx DOCX document
Rincon Barracks Specs.pdf PDF
Rincon Fire Station Civil Specs.pdf PDF
Rincon_Schedule_Rev01.pdf PDF
Rincon_Schedule_Rev01.xlsx XLSX spreadsheet
Drawings_Fire_Station.pdf PDF
Drawings_Barracks.pdf PDF
CIVIL_DRAWINGS.pdf PDF
270000 Telecommunications Wiring System.pdf PDF
AG-9702-S-10-0466 Site Attendees.pdf PDF
AG-9702-S-10-0466 Pre-Proposal - Remarks.docx DOCX document
Schedule of Items.pdf PDF
Rincon_Specifications.zip ZIP file
Rincon_Conceptial_11_-_Standard.zip ZIP file
AG-9702-S-10-0466 Rincon Fire Station RFP.pdf PDF
AG-9702-S-10-0466 Solicitation page 3.rtf RTF text file
Schedule_Fire_Station_Rincon_03.xlsx XLSX spreadsheet
Rincon_Civil_Drawings_2.zip ZIP file
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Forest Service

Rincon Fire Station and Barracks

RFIs / Questions August 15, 2010

1. Please provide direction regarding plans and specifications to be used for bidding. The ZIP file issued on August 10, 2010 includes duplicate copies of specifications, and plans that appear to apply to other projects. Can one set of plans and one set of specifications for this project (or for each building) be provided? No, all plans are on-line

2. Please confirm that a Bid Bond is required. Per the Site Visit Questions, a Bid Bond is required, but per the Solicitation, an Offer Guarantee is not..Bid Bond is required

3. Please clarify the A/E components required for this project. Will the Construction Documents be completed by either the Contractor or the US Forest Service after award? Does the Contractor need to include an allowance for completion of the Construction Documents or to cover incomplete design components? How much should be included in this allowance? There are no A&E requirements for this award. As per the Forest Service, all drawings and specs are posted. No allowance shall be required to cover incomplete design.

4. Please clarify Alternates that will be required with the Proposal. There are Alternates shown on several of the drawings, but are not itemized on the Schedule of Items. Is the intent of the Schedule of Items to provide a complete breakdown of the entire cost include in the Proposal, or is the Schedule of Items meant to create a Unit Cost Sheet for future reference? Both

5. Will the Fire Protection scope of work for the barracks be considered using an NFPA 13 or an NFPA 13R (Residential) system? 13R will be used for the Barracks.

6. Please confirm that a Fire Protection (Sprinkler) system is only indicated in the Barracks, and is not indicated in the Fire Station. Correct, only the Barracks require sprinklers.

7. Will any of the Kitchen Equipment / Appliances require a Wet Chemical Fire Protection system (such as an Ansul System)? No, this is all residential kitchen equipment.

File details come from the government source that posted it. Updated .