Design-build charleston pier papa recapitalization, USCG base charleston, charleston SC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
70Z04722RCHARLTN00
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
North Charleston, South Carolina 29405, United States

Notice details come from SAM.gov. Updated .

Notice text

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT II (NMACC II).

This project will construct new waterfront, shore structures and utility/supporting facilities required to homeport and berth 4 NSCs at Pier November (4 dedicated berths at Pier November). The scope of work includes, but is not limited to: demolition and replacement of the existing Pier November and of damaged bulkhead, removal and backfill of contaminated soils and removal of uncontaminated underwater released aggregate. Dredging will include spoils from between Piers Mike and Papa for constructing the new Pier November as well as the removal 3 pieces of submerged equipment in the area of the collapsed bulkhead. The construction includes a new Pier November, support facilities, site/groundwork and all associated utilities. New Shore Tie service requirements for electrical, potable water, fire protection, sewer, bilge water, and compressed air services will be provided for 5 NSCs at Pier November and bulkhead mooring. In addition, a new duct bank will be installed to provide C5IT connectivity between pier Papa and Pier Mike. The new work for this project will also involve additional paving of the ground surface to provide an access road to Pier November. All future parking, buoy storage, and MAT Cutter Support Team (CST) requirements will be addressed by an on-going IDP/Master Plan. Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction.

Files

File Type Posted
70Z04722RCHARLTN00_Amendment 0012.pdf PDF
70Z04722RCHARLTN00_Amendment 0011.pdf PDF
70Z04722RCHARLTN00_Amendment 0010.pdf PDF
15182879CIVIL - C-117REV2.pdf PDF
15182879CIVIL - C-119REV3.pdf PDF
9191617_NSC 9 and 10 HOMEPORT_RECORD_DWG.pdf PDF
15182879CIVIL - C-116REV2.pdf PDF
151182879_PRICE PROPOSAL FORM_PierPapaReCAP_Charleston SC_Amend0009.pdf PDF
Stormwater Condition Map.pdf PDF
70Z04722RCHARLTN00_Amendment 0009.pdf PDF
15182879CIVIL - C-114REV2.pdf PDF
15182879CIVIL - C-122REV2.pdf PDF
VT Dredge Permit (2012).pdf PDF
15182879CIVIL - C-119REV2.pdf PDF
15182879CIVIL - C-111REV2.pdf PDF
15182879CIVIL - C-113REV2.pdf PDF
15182879CIVIL - C-115REV2.pdf PDF
15182879CIVIL - C-112REV2.pdf PDF
SCPA Consent Agreement AF-0000258 - 12.15.2020 and Exhibits.pdf PDF
70Z04722RCHARLTN00_Amendment 0008.pdf PDF
SCPA_VT_LIF Investigation Report.pdf PDF
DM 6322274-v1 Covenants stamped copy 18098-22.pdf PDF
SCDHEC Approval_LIF Assessment Report _VT Bulkhead.pdf PDF
USACEResolution-VTBulkheadwExhibits_FINAL_signed_16DEC2020.pdf PDF
Clean-Process to Conduct Construction Activities.pdf PDF
Charleston Naval Complex Permit_October 2016 Renewal.pdf PDF
15182879CIVIL - C-117REV1.pdf PDF
70Z04722RCHARLTN00_Amendment 0007.pdf PDF
15182879CIVIL - C-121REV1.pdf PDF
15182879CIVIL - C-122REV1.pdf PDF
15182879CIVIL - C-119REV1.pdf PDF
15182879CIVIL - C-118REV1.pdf PDF
15182879CIVIL - C-114REV1.pdf PDF
15182879CIVIL - C-116REV1.pdf PDF
15182879CIVIL - C-124REV1.pdf PDF
15182879CIVIL - C-111REV1.pdf PDF
15182879CIVIL - C-112REV1.pdf PDF
15182879CIVIL - G-002REV1.pdf PDF
15182879CIVIL - C-123REV1.pdf PDF
15182879CIVIL - C-115REV1.pdf PDF
15182879CIVIL - C-110REV1.pdf PDF
15182879CIVIL - C-113REV1.pdf PDF
15182879CIVIL - C-120REV1.pdf PDF
70Z04722RCHARLTN00_Amendment 0006.pdf PDF
SCDHEC Approval-LIF Assessment Report - VT Bulkhead.pdf PDF
SCPA-VT-LIF Investigation Report.pdf PDF
70Z04722RCHARLTN00_Amendment 0005.pdf PDF
WD_SC20210023.pdf PDF
70Z04722RCHARLTN00_Amendment 0004.pdf PDF
70Z04722RCHARLTN00_Amendment 0003.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
Design-build charleston pier papa recapitalization, USCG base charleston, charleston SC Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors