11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC
(SEE CONTINUTATION SHEET)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NUMBER
PAGE OF PAGES
1 23
5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE NA Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-243
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
70Z04722RCHARLTN00
9B. DATED (SEE ITEM 11)
12/10/2021
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
(X)
4. REQUISITION/PURCHASE REQUISITION NUMBER
NA
3. EFFECTIVE DATE
2/18/2022
1. CONTRACT ID CODE
PROJECT NUMBER: FY19_15182879
TITLE: ReCAP Pier Papa, Sector Charleston, SC
AMENDMENT NUMBER: 0005
SOLICITATION NO.: 70Z04722RCHARLTN00 IS AMENDED AS FOLLOWS:
1. RFI Question #136
Price Proposal Form, line 10
DELETE: 5
REPLACE WITH: 4
2. Price Proposal Form DELETE: old Price Proposal Form
REPLACE: with new Price Proposal Form
3. RFI Question #7
Section 01800, Paragraph 1.8.4.2
DELETE: Any pile that cannot be removed shall be cut-off 5-ft below the mudline.
ADD: Any pile that cannot be removed shall be cut-off 5-ft below -32 MLLW.
4. RFI Questions #39,40, 43
Section 01800, Paragraph 1.8.2.3
DELETE:
Wind Loads Risk Category
Exposure Category
Vult
IV Multi-Functional Building IV Electrical Substation
Ultimate Wind Speed for Exposure D (Wind-borne Debris Region)
164 MPH
Seismic Risk Category
Importance Factor
Seismic Site Class
Short Period (Ss) 1-Sec Period (S1)
IV Multi-Functional Building IV Electrical Substation
Shall conform to UFC 3-301-01, Table 2-2
The site class shall be based on using the Site Class as recommended by the Contractor’s Geotechnical Engineer IAW the IBC 2021 and UFC 3-301-01, Table 2-2 for Design Category II
0.066g 0.049g
Flood Design Class 4
The flood design class shall be IAW ASCE 24-14 Table 1-1 Design Class of Buildings and Structures. Refer to RFP Civil section for additional requirements.
Live Loads Roof Equipment loads shall include curbs and any other appurtenances. Area of the roof to be used to access the roof mounted equipment for maintenance shall be designed or uniform live load of 40 PSF or a concentrated live load of 300 LBS whichever governs.
ADD:
Wind Loads Risk Category
Exposure Category
Vult
IV Electrical Substation
Ultimate Wind Speed for Exposure D (Wind-borne Debris Region)
164 MPH
Seismic Risk Category
Importance Factor
Seismic Site Class
Short Period (Ss) 1-Sec Period (S1)
IV Electrical Substation
Shall conform to UFC 3-301-01, Table 2-2
Actual Seismic Site Class shall be recommended by the Contractor’s Geotechnical Engineer IAW the IBC 2021 and UFC 3-301-01
0.066g 0.049g
Flood Design Class 4
The flood design class shall be IAW ASCE 24-14 Table 1-1 Design Class of Buildings and Structures. Refer to RFP Civil section for additional requirements.
Live Loads Roof Equipment loads shall include curbs and any other appurtenances. Area of the roof to be used to access the roof mounted equipment for maintenance shall be designed or uniform live load of 40 PSF or a concentrated live load of 300 LBS whichever governs.
Pier Deck
Gangway Platforms, Brows, and Dock Bridges
Other Live Loads
The pier deck shall be capable of supporting 600 PSF uniform live load or 2,500 LBS point load placed at any location. The pier deck Live Load must be capable of accommodating 90-TON rough terrain crane pick a 54,969 lbs engine from moored cutter.
100 PSF or 2,500 LBS point load at any location + Utilities2
IAW the requirements of UFC 3-301-01 and IBC 2015
5. RFI Question #46
Section 01800, Paragraph 1.8.4.4, second sentence.
DELETE: The Pier shall be a minimum of 80-ft in width.
ADD: The Pier shall be a minimum of 80-ft in width, measured from inside curb to curb.
6. RFI Question 47
Section 01800, Paragraph 1.8.4.5, second sentence.
DELETE: ‘from the fixed pier to the floating docks‘
ADD: N/A
7. RFI Question 74
Section 01900, Paragraph 1.3.1 – Attachment D
DELETE: The attached Waterfront Inspection Report, Pier Mike (Aug-2019)
ADD: N/A
8. RFI Question 196
Section 01800, Paragraph 1.8.2.2
DELETE: they should be confused as a list of allowable materials
ADD: they should not be confused as a list of allowable materials
9. RFI Questions #82, Section 01800, Paragraph 1.8.3.2.2
DELETE: N/A
ADD: After Pier November, add the following: ‘ that extend waterside of the original face of the bulkhead to a depth of -32 MLLW’.
ADD: A second sentence as follows, ‘Landside of the original face of the bulkhead, the Contractor shall be responsible for the removal for only those items necessary to install the new bulkhead.’
10. RFI Questions #71, #138, # 286
Section 01800, 1.11 Plumbing
DELETE: N/A
ADD: “Section 1.11.9 Compressed Air - Central Compressed Air system is required. Install all major components in Electrical Equipment Shelter.
Design, fabrication, installation, and testing of compressed air systems shall conform with all applicable codes including UFC 3-420-02FA, Compressed Air. The compressed air piping system shall be designed to provide 125 psig compressed air and located in the Electrical equipment shelter. The system shall be designed to serve NSCs moored at Pier Papa. Provide compressed air utility connections to each shore ties for the (5) NSCs. The non-breathing compressed air system shall comprise of a 100% duty cycle air compressor(s), capable of producing sufficient pressure and volume to suit the needs of the pier, a minimum 200 gallon air storage tank, high capacity air dryer, 98.5% coalescing filter, compressor air-inlet muffler, automatic water eliminator/bleeder valve at discharge of compressor, pressure regulator, gauges, isolation valve, quick disconnects, and dirt legs at base of each vertical pipe run. Mount compressor on 4” housekeeping concrete pad. System Performance Requirements - 125 psi @ 100 ACFM. The piping system will be designed for a maximum allowable pressure drop of 5 percent from the compressor to the most distant point of use. Piping material shall be hard copper piping (Type K) with brazed joints. Hydrostatically test the piping systems in accordance with ASME B31.1. After satisfactory completion of hydrostatic pressure test, blow systems dry with clean, oil-free compressed air, and test with clean, dry air at design working pressure. Each shore tie compressed air connection shall be minimum 1” NPS, provide a dirt leg at the base of each vertical pipe run, isolation valve, strainer, pressure relief valve, pressure gauge, filter, regulator, lubricator and a female quick-connect hose coupling.
Question No.
Date Received
REFERENCE QUESTION GOVERNMENT RESPONSE
Pg Section Paragraph 7 12/16/2021 Page of
Final RFP Pier Papa Specs
The Final RFP pier Papa Specs under Item 1.8.4.2 indicates any pile that cannot be removed shall be cut-off 5-ft below the mudline. Advise if cut-off depth shall be 5-Ft below existing mudline or 5-Ft below proposed new dredge EL -32 MLLW? This question is in conjunction with question 5 concerning work sequence and dredging in the existing pier footprint
The intent is 5-ft below the -32 MLLW.
See Amendment
25 1/10/2022
General
Has the dredging footprint been previously dredged? If yes, when was it last dredged, what was the design depth and what was the disposal location(s)?
The area has been previously dredged.
Design depth is unknown. The disposal locations are not available.
26 1/10/2022 General If dredging has previously occurred, please provide any historical permits for reference.
The government has provided all environmental studies it had available for use as reference documents.
31 1/10/2022 SECTION_01800:1.8_Page | 103 1.8.5.9 Fenders and Deck Fittings The Contractor shall utilize SFLC TS 611 Fenders and Separators. Floating marine fenders shall have a closed cell foam core that cannot absorb water, deflate or sink and shall have a non-marking outer skin. The Contractor shall be responsible for sizing fenders. For bidding purposes, assume 12’ x 24’ closed cell fenders.
Please provide a copy of SFLC TS 611 Fenders and Separators.
Is there a minimum number of fender stations with 12’ x 24’ closed cell fenders to be considered for bidding purposes?
See Amendments. See SFLC TS 611 .
33 1/10/2022 SECTION_01800:1.13_Page | 118
1.13.2 General Scope of Electrical
Work:
The following provides a general description of the scope of electrical work; additional requirements are
Please provide RFP drawings that show the locations of electrical equipment and shore tie receptacles referenced in this section.
There are no RFP drawings showing these locations. Exact locations will need to be investigated during survey period.
provided in other paragraphs of the RFP specifications and on the RFP drawings.
1.13.2.1 Pier Work: Provide new
electrical distribution systems as required to provide vessel electrical shore-tie services for five National Security Cutters (NSC’s) that will be moored at Pier November, based on the proposed mooring plans and locations of electrical equipment and shore tie receptacles shown on the RFP drawings and as specified. New vessel electrical shore-tie services shall be in accordance with RFP specification paragraph 01800, 1.13.17, “Vessel Electrical Shore-Tie Services and Equipment Requirements” and as shown on the RFP drawings and as specified.
14 1/10/22 Please refer to the solicitation page 24 non price factor 3 – Design and Construction Approach Narrative. Please confirm the 10% conceptual drawings do not count towards the thirteen (13) page limitation.
No. The 10% conceptual drawings does not count towards the 15 page count.
18 1/10/22 The NMACC IDIQ includes FAR 52.211-15, Defense Priority and Allocation Requirements. However, there was no DPAS Rating in the TOA. Will this task order be a rated order? If yes, what is the rating?
This task order has no ratings.
35 1/14/2022
Attachment B
Attachment B contains Terracon Geotechnical Report, dated 10 Dec 2012. This report states that test borings BH-1, BH-2 and BH-3 were performed
All data is included within the report.
to termination depths of 100-ft, but does not include the boring logs. Please provide the test boring logs and the test boring location plan.
36 1/14/2022
4 and
1.5.2.3
The RFP reference ECS's geotechnical report as the basis for liquifaction potential and site class determination. ECS's report is primarily based on International Building Code criteria, as it performed as a shallow foundation evaluation for landside building structures.
This project is primarily a pier & wharf replacement project, which would typically fall under ASCE 61-14 Seismic Design of Piers and Wharves for seismic design criteria (for example, UFC 4-152-01 defers to ASCE 61-14 for seismic design).
Please clarify that Site Class F shall be assumed for bidding.
Please also clarify if the governing seismic design code is ASCE 61-14.
The Contractor is responsible for a site assessment of liquefaction potential.
Correct, UFC 4-152-01 defers to ASCE 61- 14 and shall apply.
RFP 01800-1.5.2.7 states, ‘Assume Site Class F for bidding purposes.’
The registered design professional shall be responsible for verification of the site class used for design.
39 1/14/2022
Seismic
1.8.2.3
The Seismic criteria presented in this section does not apppear to be in agreement with Section 01800 1.5.2.3 Seismic Design Considerations.
Please clarify.
See Amendment
40 1/14/2022
Seismic
1.8.2.3
RFP states IBC 2021 and UFC 3- 301-01 Table 2-2 Design Category II. UFC 4-152-01 states that general purpose berthing piers and wharves shall be Design Classification:
High. Please verify what the governing code is for the seismic design.
See Amendment
43 1/14/2022
Pier Deck 1.8.2.3
Loading states a maximum list of 4 inches for the pier deck.
Please clarify.
See Amendment This has been deleted.
46 1/14/2022
1.8.4.4
Pier is stated to be 80-ft in width. Please clarify if this is based on the working area (inside face of the curb) or out-to-out (i.e. permitting footprint exluding fender system)
See Amendment
47 1/14/2022
1.8.4.5
RFP states safety ladders shall be provided from the fixed pier to floating docks. Confirm there are no floating docks for this project.
Correct, no floating docks. See Amendment.
53 1/14/2022
All
Specification 01800, Section 1.19.7.2
Estimated Quantity – in various locations within the RFP documents and the PEA are statements that a portion of the sediments are considered contaminated; however, this estimated quantity section nor the RFP drawings subdivide the contaminated from the non-contaminated sediments in quantity, location, and depth.
Likewise, Specification 01800, Section 1.18.2.1 (and 1.18.9) states “portions of the dredge spoils should…be assumed as contaminated. The Contractor must review environmental reports found in Attachment E and assumed these reports to reflect existing site conditions.”
However, the Attachment E documents do not delineate or quantify the contaminated portion of the sediments/dredged material.
Will this information be provided?
No, regarding sediments and the contaminated/noncontaminated categories, the government has provided all information available. The contractor must further delineate this material as required to comply with all environmental permits issued and assure proper disposal of each category.
54 1/14/2022 All Specification 01800, Section 1.19.12
Pre-Dredge Sampling references the Terracon report (dated APR-2019) and that the
This report is provided as reference material for assisting in determining the expected site conditions. Ultimately, the report “…indicates the presence of concentrations of soil contamination, but the report on page 18 (2nd bullet) states “None of the current sediment results show concentrations exceeding ecological screening values.”
Can USCG provide additional information, thresholds exceeded indicated contaminated status, or clarify the conflict between the specification and its referenced document?
contractor must meet all permit and regulatory requirements. Should additional sampling be required to meet permit application and/or segregation of materials, the contractor will be responsible for planning and executing these requirements.
55 1/14/2022
Specification 01800, Section 1.19.11
Disposal of Excavated Material indicates that the contractor shall provide safe transportation and disposal of dredged materials at an approved disposal area. Please clarify if USCG has agreements in place or coordinated with USACE for placement of dredged material at nearby CDF or other facility, or if USCG anticipates that the materials shall be dewatered upland and disposed of at an upland facility.
The USCG has no agreements in place with the USACE to utilize any specific dredge spoil areas. The designated dredge spoil area to be used will be determined as part of the USACE permit issued to cover dredging requirements.
56 1/14/2022
Specification 01800, Section 1.19.11
Disposal of Excavated Material
– If material is to be disposed of at an upland facility, does USCG have a specific location within the project boundaries that dredged material dewatering and handling shall occur? The RFP drawings do not show a Sediment Processing & Dewatering temporary waterfront facility.
The USCG has no agreements in place with the USACE to utilize any specific dredge spoil areas. The designated dredge spoil area to be used will be determined as part of the USACE permit issued to cover dredging requirements.
71 1/20/2022 RFP, page 72 of 209, Section 01800 Part 1 General para 1.1, Lines 11, 12 and 13.
Reference states "New Shore Tie service requirements for electrical, potable water, fire
Central Compressed Air is required.
Install in Electrical Equipment Shelter.
protection, sewer, bilge water, telecomm and compressed air will be provided" however it does not appear shore infrastructure exists for compressed air. What is the intent for this system? (ie: Will new air compressors be required to service the pier? If so are they intended to be located on the pier? UFC indicates pressure of 125 psi but does not indicate flow required - please provide anticipated compressed air flow. Also - are redundant compressors required? Do they need to be dedicated to each NSC or will a central CA system serving all 5 NSC locations be acceptable?
See amendment.
74 1/20/2022 RFP Attachment D - Waterfront Inspection Reports - Waterfront Inspection Report, Pier Mike (Aug2019)
This seems to be the Pier Papa inspection report. Please provide Pier Mike inspection report.
See Amendment to delete the mis-labeled inspection report for Pier Papa.
The Government does not have a waterfront inspection report for Pier Mike.
76 1/20/2022 RFP page 118 section 01800 paragraph 1.13.1.1
Has there been any discussions with Dominion regarding electrical service to the electrical equipment shelter? What will be the scope of work for Dominion and the contractor regarding this primary service? If the scope of work is not clearly defined at this point, should an allowance be applied to cover the work on the primary electrical service?
No. It should be assumed that the Utility will be providing connection(s) into their grid as required for the design. It is the responsibility of designer to interface and provide the necessary technical information to the utility to meet the requirements of the project.
82 1/20/2022 Secti on
Final RFP Pier Papa Specs
Per RFP Section 01800 1.8.3.2.2, all structural elements of the missing (failed) bulkhead shall be removed.
This may require extensive
1.8.3.
2.2 excavation upland of the failed bulkhead. Is it acceptable to only remove portions of the failed bulkhead structure that extend past the original face of the bulkhead or project above the dredged surface in front of the new bulkhead?
84 1/21/2022 page 72 of
Section 01800 Part 1 General para 1.1, Lines 15 and 16.
Referenced section, states "The 5th NSC will require additional space be added to Cutter Support Building supporting the other four NSCs" However there are no drawings or data delineating what is required to add to the Cutter Support building. Please provide information showing what is required i.e. square footage, room layout, location...finishes.
See RFP Section 01800, para. 1.17 and drawing and RFP drawing A-101.
113 2/1/2022 Submission Instruction, under Non-Price Proposal, it clarifies which pages are excluded from the total page limitation. Excluded from page count: cover page, dividers, and Teaming Agreements. Can you confirm if the title page and table of contents are also excluded from the page count?
Yes the title page and table of contents are excluded from the page count.
116 2/1/2022
Specification Section 011800, Paragraph 1.18.9
Contaminated soils (both in dredge spoils and upland soils) are known to be present as detailed in Attachment (E)”. Please verify if the Attachment E is the Terracon Subsurface and Sediment Investigation
Attachment E provides several environmental references, and includes the 2019 Terracon report.
Report. If it is not, please provide the Attachment E.
118 2/1/2022 Specification Section 01 11 10, Paragraph 1.13
Removal of submerged equipment shall be completed ICW dredging before other demolition or construction begins.” Please clarify if dredging work can occur after equipment removal ICW or after in-water demolition at the Contractors’ discretion.
Contractor is allowed to initiate multiple phases work simultaneously. See Amendment 0003
126 2/1/2022
Specification Section 011800, Paragraph 1.18.10
Contaminated soils (both in dredge spoils and upland soils) are known to be present as detailed in Attachment (E)”. Please verify if the Attachment E is the Terracon Subsurface and Sediment Investigation Report. If it is not, please provide the Attachment E.
Attachment E provides several environmental references, and includes the 2019 Terracon report.
136 2/1/2022 Price Proposal Form The paragraph associated with the Base Item has conflicting statements. The second line states 4 NSCs and the ninth line states 5 NSCs. Please confirm that Base Item is for 4 NSCs only.
The base is for 4 NSCs. See Amendment
138 2/1/2022 RFP Guide Specifications, Section 01800: 1.1.1 Project Description and
1.13.12.5 Electrcial Equipment Shelter
paragraph 1.13.12.5.1.
The RFP mentions compressed air is required for the shore-tie service at four locations (five is option 0001 is exercised). The RFP also mentions a new air compressor in the electrical equipment shelter. Please provide the scfm, psi and the connection size & type
Central Compressed Air is required.
Install in Electrical Equipment Shelter.
(CML)
needed for the NSC (WMSL) shore-tie.
144 2/3/22 Has there been any coordination or discussion with the USACE regarding the time necessary to process the required federal permits. Does the USCG have an anticipated time for USCE permitting review and issuance?
Early discussions between USCG and USACE have been held, but USACE has not committed to a permitting timeline.
The Contractor will support further discussions on permitting requirements and timelines as discussed in RFP section 01800 1.18.2. Bidders should apply their professional experience in this area to schedule estimation, to include the possibility that other state and federal consultation requirements may need to be addressed concurrently with a USACE application.
145 2/3/22 Where differences exist between BMPs outlined in the EA and the final state and federal permits which will govern?
The requirements, including those incorporated by reference, of federal and state permits will supersede any BMPs outlined in the Programmatic EA.
150 2/3/22
RFP Guide Specifications, Section 1800, Subsection -
ENVIRONMENTAL PERMITS,
CONTROLS, AND PROTECTION
PARAGRAPH 1.18 and Attachment E - Base Charleston SPCC ‘Spill Prevention Control and Countermeasures Plan’ (Feb 2019)
Section 1.18.4.6 references the facility’s existing Spill Prevention Control and Countermeasure (SPCC) plan, and the Contractor’s design and construction practices shall be in compliance with the SPCC’s guidelines, goals, and objectives. The Attachment E Base Charleston SPCC ‘Spill Prevention Control and Countermeasures Plan’ (Feb 2019) currently does not cover the pier November.
Please confirm the RFP's requirement; that the contractor's design and construction shall be in compliance with the
Yes, the Contractor's design and construction shall be in compliance with the guidelines, goals and objectives of the Base Charleston SPCC ‘Spill Prevention Control and Countermeasures Plan’ included in Attachment E. However, in accordance with RFP Section 01800 1.18.8, the Contractor shall also supply the Government with information critical to updating the existing SPCC plan for all new and modified oil handling equipment prior to installing or modifying equipment.
guidelines, goals and objectives of Attachment E Base Charleston SPCC ‘Spill Prevention Control and Countermeasures Plan’ (Feb 2019)
152 2/3/22
RFP Guide Specifications, Section 1800, General, paragraph 1.1.1 PROJECT DESCRIPTION and Paragraph 1.9.6.6 Underground Storage Tanks
SECTION 01800, paragraph
1.9.6.6 states "a vent pipe and concrete vault for an apparent petroleum UST was observed outside of the north side of Building 3. The tank could not be accessed, so it is unknown if fuel is still located in the tank".
Can the government confirm that this is the only location in the project area where USTs might be present.
Bidders should consult the 2020 Environmental Due Diligence Audit (EDDA) included in Attachment E for a more thorough discussion of the potential for USTs, former USTs, and other recognized environmental conditions that may be encountered.
164 2/3/22
SECTION 01800
TELECOMMUNICATIONS /
ELECTRONICS CONSTRUCTION
SPECIFICATIONS Paragraph 1.16 Section 1.16.15.1.7 & SECTION
01800_DESIGN-BUILD CRITERIA
PARAGRAPHS 1.13 ELECTRICAL -
Section 1.13.3.3
SECTION 01800
TELECOMMUNICATIONS /
ELECTRONICS
CONSTRUCTION
SPECIFICATIONS Paragraph
1.16 Section 1.16.15.1.7
states Provide two 4-inch reinforced thermosetting resin conduit (RTRC) for telecommunications OSP cabling from the Pier November Telecom Room to each planned cutter shore tie location including the bulkhead mooring location.
One 4-inch conduit shall be used for copper cabling runs, and the second 4-inch conduit shall be used for inner duct and future fiber
Telecommunication conduits can be encased as long as requirements for distance between pull points and bend totals are not exceeded (RFP 1.16.15.1.3) optic cable.
Please confirm that the Telecommunications conduits can be encased within in the pier and installed per SECTION
01800_DESIGN-BUILD
CRITERIA PARAGRAPHS
1.13 ELECTRICAL -Section
1.13.3.3.
171 2/4/22
Design Build Criteria Environmental Permits, Controls and Protection
1.18 General
Can we expect the six month Navy Review process to be concurrent with the 401/404/Section 10 Permit Review?
While the timelines for these reviews would likely overlap, the USCG cannot guarantee to what extent they would be concurrent.
176 2/4/22
Specification 01800 paragraph 1.18.2.1
The Government has initiated permit work for the Charleston Programmatic Environmental Assessment (September 2020X). Does the USCG believe a subsequent tiered NEPA review will be required for the proposed scope of work to supplement the Environmental Assessment (EA) and Finding of No Significant Impact dated 9/14/2020 for the “programmatic approach”?
The USCG believes that the 2020 Programmatic EA provides adequate NEPA coverage for this project scope, and does not believe that a tiered/supplemental analysis is required at this time. The Programmatic EA is provided to the Contractor as a reference to provide context on planned development on Base Charleston and to help characterize current environmental conditions.
178 2/4/22
Is the Soil and Groundwater Management Plan (SGMP), previously developed for Veterans Terminal available for review? If so, please provide a copy.
The USCG has provided all readily available and reliable references related to soil and groundwater contamination at the project location. Additional information and guidance will be developed through project coordination with the Navy and South Carolina DHEC.
The Contractor will support this coordination as defined in RFP Section 1.18.2.
180 2/4/22 Please refer to Section 01800 paragraph 1.18. Does the USCG have any additional formal communications from the SDHEC or Navy related to Records of Decision (ROD) or further investigation/clean-up related to the numerous solid waste management units (SWMU) and areas of concern (AOC) that haven’t been formally closed by a regulatory agency? This information would need to be included with our dig permit process if available.
Please provide if available.
The USCG has provided all readily available and reliable references related to soil and groundwater contamination at the project location. Additional information and guidance will be developed through project coordination with the Navy and South Carolina DHEC.
The Contractor will support this coordination as defined in RFP Section 1.18.2.
187 2/4/22 Specification section 1800
1.19.7.2 states for bidding purposes the dredging quantity including the overdepth dredging is 385,449 cubic yards. Please confirm this quantity includes the dredging at the bulkhead mooring area and the bulkhead release area.
The quantity includes the overdepth and the bulkhead release area. There is no bulkhead mooring area.
195 2/4/22 The RFP specifications and drawings use the term “the Government preference is…” in several locations. Please confirm that “preference” or “preferred” is not a prescriptive direction and the Designer has the design freedom to provide their design solution.
Conducted word search of RFP doc for the phrase “Government preference”.
No matches to this phrase occurred.
This is a Design/Build contract, the RFP does not represent a design solution.
196 2/4/22 Specification section 1800
1.8.2.2 Corrosion Protection
Correct. See Amendment.
first sentence states “the should be confused as a list of allowable materials” Please confirm this should be "not confused as.."
201 2/4/22 Specification section 1800
1.16.8 states telecom room 10 ft high and 1.16.13 states 11 ft high. Please confirm 10 ft is sufficient.
1.16.8 is room height (10Ft) and 1.16.13 is room floor dimension (length and width) is 11ft.
202 2/4/22 Specification section 1800
1.16.20 Non-Construction
Electronics Outfitting Specifications. States this paragraph lists telecom and electronics requirements to be performed by the Gov but nothing is listed. Please clarify.
1.16.20 includes paragraphs 1.16.20.1 and improperly formatted 1.16.21 (should be 1.16.20.2) and 1.16.22 (should be 1.16.20.3). The Gov items will be completed post construction. Can remove 1.16.20, 1.16.21, and 1.16.22 to remove confusion. See Amendment. (JY)
209 2/4/22 Section 180000 Paragraph
1.13.12.3.1 – Please confirm if the contractor is only limited to Viking, joy or NATO receptacles or are other equivalents receptacles are acceptable?
Review section 1.13.12.3.1 for MIL-spec clarification.
211 2/4/22 Please provide the existing fire alarm control unit manufacturer and model.
Information is not available.
212 2/4/22 Section 18000 Paragraph Section 1.13.5.3 states that conductors for the power mounds are to be RHW DLO cable. The DLO cable type has a much lower ampacity rating when enclosed in conduit which will increase the number of parallel feeders that will be required for each shore power receptacle in each power mound. The conduits for the power mounds will be embedded in the concrete ductbank and will be protected from damage so DLO cable is really not required. We
Recommendations will need to be made by the DOR regarding the type of conductor used.
recommend traditional type THWN conductors. In addition, the termination of the shore power receptacles can be provided by the manufacturer of the power mound to a set of terminal lugs that would allow the easy termination of type THWN. Please confirm that traditional THWN conductors be used.
213 2/4/22 Please clarify if all underground electrical conduits need to be encased in concrete when not under roadways.
See section 1.13.4.1
216 2/4/22 Section 1.16 Telecom states "future" cabling throughout the specification for the pier runs. Please confirm that no fiber optic cabling or outlets are required at the power mounds for ship connection.
No fiber or fiber connectors are required at shore tie locations . The only fiber requirement in the telecom section of this RFP is between Pier Papa Telecom room and Pier Nov Telecom Room.
217 2/4/22 Clarify what fiber connections, terminals and outlets are required at the shore power mounds if fiber is for future installation?
See response for RFI question 216.
286 2/4/22 RFP section 01800_1.1.1 indicates shore ties should include compressed air services for 5 NSCs at Pier November and bulkhead mooring. RFP section 01800_1.13.12.5 indicate the air compressor will be stored in the electrical equipment shelter. RFP section 01800_1.13.12.4.3.3 indicates an electrical receptacle is to be provided for air compressor.
Please confirm the air compressor will be portable and is not required to be plumbed to the shore ties.
Additionally, please indicate
Central Compressed Air is required.
Install in Electrical Equipment Shelter. (CML) who is responsible for providing the air compressor. If the contractor is responsible for providing and/or installing the air compressor, please provide the design requirements including storage capacity, SCFM, and PSI.
287 2/4/22 Per Section 01800 paragraph
1.16.15.1.4 the contractor is to provide a handhole at a common point where telecommunications cabling enters the boat/mooring area.
Please confirm is this handhole is not required due to shore ties will be located within the power pound per paragraph 1.16.19.3.4.
1.16.15.1.4 refers to a common hand-hold/man-hole shore-side that all pier conduits will terminate into. Ideally this would be the same hand-hold/manhole in the location of Pier Nov Telecom Room that the comms duct bank between Piers Papa and Mike utilize (providing access in all four directions.
Pier Nov telecom room should also connect to this point.
291 2/4/22 The following trade wage scales are missing. Please provide a updated wage scale determination for the following trades: dredging, cement mason, bricklayer, concrete finisher, asbestos worker, electrician, roofer and pipefitter.
See attached updated wage determination.
302 2/4/22 Specification section 1800,
1.4.7 Water System - Please
confirm that we are to use the water pressure provided in Attachment I - Water Flow Test for bidding purposes to design the water system? If the water supply is not adequate confirm we are to provide a fire pump and that the finish floor elevation (FFE) of this needs to match the electrical/telecom shelter's FFE.
Attachment I is to be used for bidding purposes. If a fire pump is required, follow the requirements of ASCE 24 for a Flood Design Class 3.
319 2/4/22 The previous contract at Veterans Terminal bulkhead
FDCC can’t confirm or deny another agencies contract scope or price.
reconstruction project under the SCSPA in order to repair the collapsed bulkhead awarded in 2013, and subsequently cancelled, was rumored to be valued at around $40M. Has this been considered in the current budget?
PRICE PROPOSAL FORM
PROJECT 15182879_Pier Papa ReCAP, Charleston, SC
TASK ORDER ANNOUNCEMENT #:
Base Item: This project will construct new waterfront, shore structures and utility/supporting facilities required to homeport and berth 4 NSCs at Pier November (4 dedicated berths at Pier November). The scope of work includes, but is not limited to: demolition and replacement of the existing Pier November and of damaged bulkhead, removal and backfill of contaminated soils and removal of uncontaminated underwater released aggregate. Dredging will include spoils from between Piers Mike and Papa for constructing the new Pier November as well as the removal 3 pieces of submerged equipment in the area of the collapsed bulkhead. The construction includes a new Pier November, support facilities, site/groundwork and all associated utilities. New Shore Tie service requirements for electrical, potable water, fire protection, sewer, bilge water, and compressed air services will be provided for 4 NSCs at Pier November and bulkhead mooring. In addition, a new duct bank will be installed to provide C5IT connectivity between pier Papa and Pier Mike. The new work for this project will also involve additional paving of the ground surface to provide an access road to Pier November.
All future parking, buoy storage, and MAT Cutter Support Team (CST) requirements will be addressed by an on-going IDP/Master Plan. Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction, excluding items identified in Option Items.
Design (General): $ ______________
Design (Dredging): $ ______________
Design (Dredging plus $ ______________
Equipment removal) $ ______________
Total Design Price: $ _____________________
Construction (General): $ ______________
Construction (Dredging): $ ______________
Construction (Dredging plus) $______________
Equipment removal): $__________________
Total Construction Price: $__________________
TOTAL BASE: $ ___________________
The TOTAL BASE ITEMS shall be deemed to include all costs required for the specified work to be completed in accordance with the plans and specifications.
Option Item 0001: This option will construct one (1) NSC nested birth. The scope of work includes, but is not limited to: additional electrical shore tie, additional fenders to support double berthing, brow between double berthed NSCs. Bollards and cleat to support double berthing. Additional electrical, sanitary potable water and telecommunication runs. Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required to construct items identified in Option 0001.
Design Price: $__ ___________
Construction Price: $__ ___________
TOTAL OPTION 0001: $__________
Option Item 0002: This option will construct an additional 80 linear feet of pier at Pier November.
Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required to construct items identified in Option 0002.
Design Price: $__ _______
Construction Price: $________
TOTAL PRICE
(Base Line Item 0001 plus Option Line Items 0001and 002): $_______
| 151182879_PRICE PROPOSAL FORM_PierPapaReCAP_Charleston, SC.pdf |
| PROJECT 15182879_Pier Papa ReCAP, Charleston, SC |
File details come from the government source that posted it. Updated .