70Z04722RCHARLTN00_Amendment 0007.pdf

PDF 441 KB Posted

Attached to
DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC
Solicitation number
70Z04722RCHARLTN00
Issued by

View the file

Other files

File Type Posted
70Z04722RCHARLTN00_Amendment 0012.pdf PDF
70Z04722RCHARLTN00_Amendment 0011.pdf PDF
70Z04722RCHARLTN00_Amendment 0010.pdf PDF
9191617_NSC 9 and 10 HOMEPORT_RECORD_DWG.pdf PDF
15182879CIVIL - C-119REV3.pdf PDF
15182879CIVIL - C-117REV2.pdf PDF
15182879CIVIL - C-122REV2.pdf PDF
15182879CIVIL - C-113REV2.pdf PDF
Stormwater Condition Map.pdf PDF
15182879CIVIL - C-116REV2.pdf PDF
151182879_PRICE PROPOSAL FORM_PierPapaReCAP_Charleston SC_Amend0009.pdf PDF
15182879CIVIL - C-119REV2.pdf PDF
15182879CIVIL - C-115REV2.pdf PDF
15182879CIVIL - C-114REV2.pdf PDF
15182879CIVIL - C-112REV2.pdf PDF
15182879CIVIL - C-111REV2.pdf PDF
VT Dredge Permit (2012).pdf PDF
70Z04722RCHARLTN00_Amendment 0009.pdf PDF
Clean-Process to Conduct Construction Activities.pdf PDF
USACEResolution-VTBulkheadwExhibits_FINAL_signed_16DEC2020.pdf PDF
SCPA Consent Agreement AF-0000258 - 12.15.2020 and Exhibits.pdf PDF
SCPA_VT_LIF Investigation Report.pdf PDF
DM 6322274-v1 Covenants stamped copy 18098-22.pdf PDF
Charleston Naval Complex Permit_October 2016 Renewal.pdf PDF
SCDHEC Approval_LIF Assessment Report _VT Bulkhead.pdf PDF
70Z04722RCHARLTN00_Amendment 0008.pdf PDF
15182879CIVIL - C-122REV1.pdf PDF
15182879CIVIL - C-119REV1.pdf PDF
15182879CIVIL - C-114REV1.pdf PDF
15182879CIVIL - C-113REV1.pdf PDF
15182879CIVIL - C-120REV1.pdf PDF
15182879CIVIL - C-112REV1.pdf PDF
15182879CIVIL - G-002REV1.pdf PDF
15182879CIVIL - C-123REV1.pdf PDF
15182879CIVIL - C-116REV1.pdf PDF
15182879CIVIL - C-111REV1.pdf PDF
15182879CIVIL - C-110REV1.pdf PDF
15182879CIVIL - C-115REV1.pdf PDF
15182879CIVIL - C-117REV1.pdf PDF
15182879CIVIL - C-118REV1.pdf PDF
15182879CIVIL - C-124REV1.pdf PDF
15182879CIVIL - C-121REV1.pdf PDF
SCPA-VT-LIF Investigation Report.pdf PDF
SCDHEC Approval-LIF Assessment Report - VT Bulkhead.pdf PDF
70Z04722RCHARLTN00_Amendment 0006.pdf PDF
70Z04722RCHARLTN00_Amendment 0005.pdf PDF
WD_SC20210023.pdf PDF
70Z04722RCHARLTN00_Amendment 0004.pdf PDF
70Z04722RCHARLTN00_Amendment 0003.pdf PDF
9191617_RECORD_DWG_ELEC EQUIP SHELTER AT PIER PAPA.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC

(SEE CONTINUTATION SHEET)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 18

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE NA Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-243

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z04722RCHARLTN00

9B. DATED (SEE ITEM 11)

12/10/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER

NA

3. EFFECTIVE DATE

2/28/2022

1. CONTRACT ID CODE

PROJECT NUMBER: FY19_15182879

TITLE: ReCAP Pier Papa, Sector Charleston, SC

AMENDMENT NUMBER: 0007

SOLICITATION NO.: 70Z04722RCHARLTN00 IS AMENDED AS FOLLOWS:

1. RFI Questions #143 and #75

Section 1.13, Paragraph 1.13.12.2 DELETE: “the three new power mounds (a total of three transformers is required).”

REPLACE WITH: “the power mounds being installed in this project.”

2. RFI Questions #160

Section 1.13, Paragraph 1.13.3.3 DELETE: “in accordance with Attachment I”

REPLACE WITH:

3. RFI Questions #161

Section 1.13, Paragraph 1.13.12.4 DELETE: “The details shown on the RFP drawings and in Attachment “I”” REPLACE WITH: “The details shown on the RFP drawings and in SILC-CSTO-36-11 21 27 11-04/ 2011056”

4. RFI Questions #210

Section 1.10 , Paragraph 1.10.1.1 DELETE: “telecom room”” REPLACE WITH: “maintenance bay telecom room”

5. RFI #143. 199, 200, 324

Section 1.13 , Paragraph 1.13.2.1 DELETE: “Provide new electrical distribution systems as required to provide vessel electrical shore-tie services for five National Security Cutters (NSC’s) that will be moored at Pier November, based on the proposed mooring plans and locations of electrical equipment and shore tie receptacles shown on the RFP drawings and as specified.”

REPLACE WITH: “Provide new electrical distribution systems as required to provide vessel electrical shore-tie services for four (4) National Security Cutters (NSC’s), and one optional NSC, that will be moored at Pier November, based on the proposed mooring plans and locations of electrical equipment and shore tie receptacles shown on the RFP drawings and as specified.”

6. RFI Questions #327

Section 1.12, Paragraph 1.12.1.4 DELETE: “to meet ASHRAE 55 standards, to 70 deg F in the winter and 76 deg F in the summer.”” REPLACE WITH: “ to meet interior temperature setpoints per RFP Section 1.13.12.5.9”.

7. RFI Questions #218 and 270

Section 1.12, Paragraph 1.12.1.7 DELETE: “Provide either an exhaust hood for the battery charging area, or a sloped ceiling with an exhaust grille located at the highest point of the space, utilizing an intrinsically safe exhaust fan. All battery charging circuits shall be tied into the exhaust fan system such that the charger is not capable of being energized if the fan is not proven running. Supplemental make-up air shall be provided as required. The vented area shall be equal to but not less than 1 SF per 30CF of room volume (Ref 29CFR 1910.103(b)(3)(ii)(c) & (3) (iii)(c). Space temperature shall not exceed 95 degrees F per 4.6.1.5 of COMDTINST M10550.25B.[””

REPLACE WITH: “For the storage building, provide a powered exhaust system per ASHRAE

62.1 and the ICC Mechanical Code. Exhaust system shall be wall or roof mounted. No conditioned air is required. Operation shall be controlled by wall mounted switch.”

8. RFI Question #284

Section 01800, Paragraph 1.4.2.1 DELETE: “natural gas,”

REPLACE WITH: N/A

9. RFI Question #283

Section 01800, Paragraphs 1.4.8 and 1.4.8.1 DELETE: Delete paragraphs in their entirety.

REPLACE WITH:

1.4.8 Sanitary Sewer

The Contractor shall connect the new sanitary wastewater collection system to the nearest adequate existing sanitary sewer line and shall coordinate sanitary sewer work with the North Charleston Sewer District (NCSD). (See RFP Drawing C-122REV1 for connection point.)

Sewage flow per NSC is 350 gpm, 4,000 gallons per day via 4-inch camlock hose connection.

Provide all materials, equipment, labor, testing, and miscellaneous related items to provide sanitary sewage lines necessary for distribution and services to the pier. The following materials are not allowed for sanitary sewer piping: clay pipe and fittings, concrete pipe and fittings, steel pipe, or asbestos-cement pipe. Install piping with color coded (per APWA uniform color coding) warning tape. All nonmetallic piping shall have copper tracer wire and RFID markers.

NOTE: All sanitary sewer design and construction shall be constructed in accordance with the NCSD Development Design Detail. See https://ncsd.sc.gov/development-design-detail/.

1.4.8.1 Sanitary Sewer Cleanouts

Contractor shall provide sanitary sewer cleanouts on sanitary sewer service lines for adequate maintenance purposes. Clean-outs shall be placed in accessible locations throughout a gravity collection system. The minimum locations are at changes in horizontal alignment on service laterals and at every 100-feet prior to connection to a main. (On the pier, sanitary cleanouts shall be provided at terminal ends and at a maximum spacing of 300 feet.) Clean-outs shall have threaded caps.

10. RFI Question #219

Section 01800, Paragraph 1.4.7 ADD: Add the following after the first paragraph:

NOTE: The existing water main in S. Hobson Avenue is owned by the Charleston Water System (CWS). Connection to this main shall be coordinated with CWS and construction shall be in accordance with their Minimum Standards available on their website at https://www.charlestonwater.com/422/New-Development. For bidding purposes, assume that water tap & impact and origination fees payable to CWS will be $116,835. If the fees are less, the Contractor shall be paid the actual amount. If the fees exceed this amount, the Contractor shall notify the Contracting Officer.

11. RFI Questions #303, 304, 305

Section 01110, Paragraphs 1.10 thru 1.10.5 DELETE: Delete paragraphs in their entirety.

REPLACE WITH:

1.10 NEW UTILITY SERVICES

Make all arrangements with the local utility providers and pay all fees, charges, and costs of any nature associated with establishing and installing new temporary (during construction) and subsequent permanent utility services required to ensure permanent and uninterrupted utility service at project completion. The contract documents may provide a conceptual plan for utility layouts. These plans shall be confirmed by the contractor during the bidding stage with the local utility provider to determine the exact materials, equipment placement, and other features that may be required by the specific utility provider. The term utility service includes, but is not limited to meters, mains, service lines, high voltage feeders, transformers, force mains, lift stations, tanks, etc. The contractor is responsible for coordinating the work https://ncsd.sc.gov/development-design-detail/ https://urldefense.proofpoint.com/v2/url?u=https-3A__www.charlestonwater.com_422_New-2DDevelopment&d=DwQFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=XTJ3bdnOexu-J9gWIKaByLgdVisvkG-NkGlyjCmnQGg&m=wrdNEfqe6zbmDTQc9iPpmF0Emfx_RSDC429MDLpu-xY&s=A9Q4YVjD8lVo33FN1_ootlsy4rCvlc7igJaGEXYvveE&e= with the utility provider to ensure the utility connection to the site is completed and that there is no delay in the prosecution of the work or completion of the project. Utility services include electricity, water, sewer, and telephone.

The local utility providers are as follows:

Utility Provider Service Telephone Number Dominion Energy Electricity (800)251-7234 Charleston Water Systems Water (843) 727-6800 North Charleston Sewer District

Sanitary Sewer (843) 764-3072

1.10.1 Water

Coordinate with utility provider for temporary connection fees.

1.10.2 Sewer

Coordinate with utility provider for temporary connection fees.

1.10.3 Gas

Natural gas is not applicable.

1.10.4 Telephone Service

Temporary telephone service to the contractor’s trailer is available via the local telephone company at the contractor’s expense. There will be no charge to connect to the Government telephone lines for permanent telephone service to the cutter shore-ties and the new building.

1.10.5 Electrical

Coordinate with utility provider for temporary connection fees.

12. RFI Question #339

Section 01800, Paragraph 1.4.7.2 DELETE: Delete the paragraph in its entirety.

REPLACE WITH:

1.4.7.2 Water Demand

The potable water demand for each National Security Cutter (NSC), 418 WMSL, is 3,000 gallons per day via a 1.5-inch hose connection capable of 100 gpm at a minimum of 30 psi and a maximum of 55 psi per cutter. The Contractor shall confirm the adequacy of the design of all components of the supply system. The Designer-of-Record (DOR) shall provide water model analysis and results as supporting calculations of any new water mains to ensure all proposed fire hydrants, fire suppression systems and domestic service lines will provide adequate pressures and flows as required by the International Fire Code. Following State and City requirements, the Contractor shall design the connections to the existing water system including the meter assemblies and all necessary pumps, pressure reducing and backflow-preventing devices.

13. RFI Question #146

DELETE: G-002

ADD: New drawing G-002REV1

14. RFI Question #146

DELETE: C-110

ADD: New drawing C-110REV1

15. RFI Question #146

DELETE: C-111

ADD: New drawing C-111REV1

16. RFI Question #146

DELETE: C-111

ADD: New drawing C-111REV1

17. RFI Question #146

DELETE: C-112

ADD: New drawing C-112REV1

18. RFI Question #146

DELETE: C-112

ADD: New drawing C-113REV1

19. RFI Question #146

DELETE: C-113

ADD: New drawing C-113REV1

20. RFI Question #146

DELETE: C-114

ADD: New drawing C-114REV1

21. RFI Question #146

DELETE: C-115

ADD: New drawing C-115REV1

22. RFI Question #146

DELETE: C-116

ADD: New drawing C-116REV1

23. RFI Questions #80, 146

DELETE: C-117

ADD: New drawing C-117REV1

24. RFI Questions #80, 146, 231

DELETE: C-118

ADD: New drawing C-118REV1

25. RFI Questions #146, 231

DELETE: C-119

ADD: New drawing C-119REV1

26. RFI Question #146

DELETE: C-120

ADD: New drawing C-120REV1

27. RFI Question #146

DELETE: C-121

ADD: New drawing C-121REV1

28. RFI Questions #80, 146, 158, 231

DELETE: C-122

ADD: New drawing C-122REV1

29. RFI Question #146

DELETE: C-123

ADD: New drawing C-123REV1

30. RFI Question #146

DELETE: C-124

ADD: New drawing C-124REV1

31. RFI Question #21 Section 01110, Paragraph 1.4

ADD: As it pertains to dredging operations, dredging will be allowed to be performed 24 hours per day, 7 days per week provided the contractor submits a request to work outside of the prescribed working hours via email to the (KO, Unit Rep, COR) at least 2 weeks in advance.

END OF AMENDMENT LANGUAGE

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION

OF OFFER

Question No.

Date Received

REFERENCE

QUESTION GOVERNMENT RESPONSE

Pg Section Paragraph

1/10/2022

Section_01110_Page 9: 1.4.1 Work is authorized at the site from 0700 to

1700 Monday through Friday subject to local jurisdiction approval. No work is allowed on weekends or Federal holidays. Requests to work outside of authorized times can be made

Does the work restriction apply to dredging operations, or will dredging be allowed to be performed 24 hours per day, 7 days per week?

The recommendation is to allow dredging 24/7. The contractor can submit a request to work outside of the prescribed working hours via email to the (KO, Unit Rep, COR) at least 2 weeks in advance.

See Amendment 0007

75 1/20/2022 RFP section 01800 page 119 paragraph 1.13.2.2.4) and page 124 paragraph

1.13.12.2

One paragraph states to provide three power mounds while another paragraph states to provide five power mounds. Please confirm the exact number of power mounds to be provided.

Duplicate question #143.

See Amendment 0007

77 1/20/2022 RFP page 123 section 01800 paragraph 1.13.9.2

Please provide information on existing site lighting including light fixture type and information on the pole. Is it acceptable to provide new site lighting that match the existing light fixtures and poles?

It is acceptable to provide new site lighting and poles that matches existing although not required.

Priorities are features of new poles match the requirements in the RFP and all new fixtures are required to be LED-type lamps.

80 1/20/2022 Subpart 1.1

General Project Require ments and Descripti ons;

Paragrap h 1.1.1 Project

Descripti on

Final RFP Pier Papa

Specs Section

01800_De sign-Build Criteria;

Part 1

General

Within the reference specification section, it is referenced that this project will provide new Shore Tie services for electrical, potable water, fire protection, sewer, bilge water, telecom and compressed air for the 5 NSCs at Pier November. It is not clear from the drawings provided or the specifications where each utility should make its connection to existing on shore services. Please provide conceptual routing and end connection points for each utility listed.

For Telecoms – Each Shore tie position will connect to the telecom room at foot of pier NOV. (RFP

1.16.15.2.3 and RFP 1.16.15.2.4).

Pier Nov Telecom room will connect to Pier Papa Telecom Room (RFP

1.16.15.2.1 and 1.16.16.2) Final cross connects to the Utilities Demark located in Pier Papa telecom room will be made by the GOV.

85 1/24/2022 C103 Sheet 6 of 8

5% RFP Submittal Charleston Pier Papa In the 65% RFP Submittal Charleston Pier Papa document in the RFP drawing C103 (page 224 of 225) of the document shows an alternate bulkhead berthing location for the WLB. Advise if it is the intent to utilize the bulkhead between Pier Mike and Pier Papa at a bulkhead to berth vessels.

The 65% RFP should not be considered. There will be no vessel berthing along the bulkhead.

This contractor must have rec’d the 65% early on. There are 28 drawings in the RFP and they noted the sheet as 6 of 8, but C-103 is 6 of 28 in the

RFP.

98 1/28/2022

Per Section 01800: 1.1.1 there is 1,500 CY of contaminated soil to remove. Please confirm if there are fuel lines in this vicinity. If so, have existing fuel valves been shut off and have the lines been emptied? Do these existing fuel lines require removal or to be grouted?

(MAW) See amendment. References to removal of 1,500 CY of contaminated soil have been removed. Additional references have been provided in Attachment N that document that petroleum contamination in this location has been remediated, to include the capping of underground piping.

Item #4 in Amend 0006 addresses this.

100 1/28/2022

RFP Section 01800 Paragraph 1.1.1, Paragraph 1.19.7.2.2

RFP Section 01800 Paragraph

1.1.1 indicates a 30' offset from the bulkhead to the dredge basin.

For dredge depth of EL -30 ft below MLLW and 2 ft overdredge allowance and 4:1 side slope, the dredge elevation at the face of the bulkhead would be EL-24.5 ft below MLLW. However, section 01800 Paragraph 1.19.7.2.2 indicates the dredge depth at the bulkhead to be EL -30 ft MLW followed by a 1:4 slope to the ultimate dredge depth. Please confirm which dredge depth at bulkhead to be used for the bulkhead design.

The dredge limits are per RFP drawings. The design elevation and dredge depth of –30 MLLW (including over dredge depth) is required at the face of the bulkhead for 30-ft before the 4:1 slope to –32 MLLW (including over dredge depth).

103 1/28/2022

SECTION 01 80 00 Paragraph

1.9.6.6

Underground storage tank to be demolished at Building 203 - Please confirm that we should assume the tank still contains fuel.

Assume that the tank contains some residual petroleum product.

Requirements for soil and groundwater remediation beyond the basic tank removal and tank closure would be handled as a changed site condition. (MAW) Add

- Tank closure work shall meet all South Carolina UST closure requirements to include required sampling and completion of closure paperwork to be submitted to South Carolina DHEC.

109 1/28/2022

FRP Section 01 80 00 Paragraph

1.9.2.3 and Figure+PIER+-

Field+Map+Well+Locations+Near+P roject

The RFP references removal of all elements within the limits of construction. However, the field map references about 18 abandoned monitoring wells in the area for demolition. These are not referenced in the RFP. Please advise what should be done with these wells.

Monitoring wells may require either proper closure or protection for future use. This determination would be led by the Contractor during the regulatory consultation described in Section 01800 1.18.2.

127 2/1/2022

Reference: Waterfront Facility Inspection and Assessment at South Carolina State Port Authority Pier November – Veterans Terminal North Charleston, South Carolina – January 2018 by Appledore Marine Engineering, LLC.

Question: Page 5 of 164 indicates a Condition Assessment Rating Plan which indicates the bulkhead “structure in serious condition,” and extends beyond the Pier November. However, Drawing Sheet C-122 of the RFP shows the approximate location of the new bulkhead tie-in ending at the existing Pier November. Please confirm the location of the new bulkhead tie-in with the existing bulkhead.

Location of bulkhead tie-in shall be as shown.

143 2/2/22

RFP page 119, par. 4 five new power mounds to serve the NSC.” Page 124, par.1.13.12.2 tells to provide power to “…each of three new power mounds…”.

Please clarify, how many power mounds on the pier needed.

There will be a minimum of 5 power mounds.

146 2/3/22

Section 01800, paragraph 1.4.2.1

Site Development Plan states “The Contractor shall provide complete Site Plans showing the site fully developed for the new pier and associated site work indicated on the RFP Drawings and as identified herein. All existing manholes, inlets, valve boxes, etc.

located within the project limits that are to remain shall have rim elevations adjusted to match the proposed finished grade elevations on the site.” The RFP drawings provided do not identify the project limits. Please identify where the project limits are.

See amended drawings.

158 2/3/22

SECTION 01800

TELECOMMUNICATIONS /

ELECTRONICS CONSTRUCTION

SPECIFICATIONS Paragraph 1.16 Section 1.16.15.1.6

SECTION 01800

TELECOMMUNICATIONS /

ELECTRONICS CONSTRUCTION

SPECIFICATIONS Paragraph 1.16 Section 1.16.15.1.6 states Provide

(4) 4-inch conduits for telecommunications OSP cabling from the Pier Papa Telecom Room, to a Hand hole at the base of Pier Mike.

RFP Drawing C122 Conceptual Site Plan New Work Notes # 2 states “Install (6) 4 inch conduits from the Manhole/Handhole to the Telecommunication Room.”

Based on expected fill ratios and 50% future growth four (4) 4 in conduits should be plenty from Pier Papa to Pier Mike.

See amended drawing.

Please verify if (4) 4-inch conduits or (6) 4-inch conduits are required to be installed.

160 2/3/22

SECTION 01800 Paragraph 1.13

ELECTRICAL 1.13.3.3

SECTION 01800 Paragraph 1.13 ELECTRICAL 1.13.3.3 states Conduit run under piers shall be type RTRC (minimum .25 inch wall thickness) in accordance with Attachment “I”.

Please provide missing Attachment I.

Disregard the “Attachment I". The specifications for the conduit are included in the RFP language.

161 2/3/22

SECTION 01800 Paragraph 1.13

ELECTRICAL 1.13.12.4

SECTION 01800 Paragraph 1.13 ELECTRICAL 1.13.12.4 states The details shown on the RFP drawings and in Attachment “I” are for design guidance only to illustrate general features of a typical power mound enclosure and the arrangement of equipment mounted in and on the enclosure.

Please provide missing Attachment I.

Disregard the “Attachment I". The specifications for the Electrical Shore Ties can be found in the referenced documents (SILC-CSTO-36-11 21 27 11-04/ 2011056)”

192 2/4/22 Per Section 01110 paragraph 1.13, “Removal of submerged equipment shall be completed ICW dredging before other demolition or construction begins”. Please confirm that other work outside this bulkhead release area, such as the Pier November demo and construction, can start before the submerged equipment is removed since this will significantly impact the overall project schedule?

Contractor is allowed to initiate multiple phases work simultaneously. See Amendment #0003 Question 6.

199 2/4/22 Specification section 1800 1.13.2.2 4) states to provide five power mounds to serve the NSCs. Please clarify four power mounds are in base and one in the option 1.

A response same as RFI 143 is needed here.

200 2/4/22 Specification section 1800 1.13.12.2 states three new power mounds.

Please confirm there is 4 new power mounds in base price and one power mound in option 1.

A response same as RFI 143 is needed here.

210 2/4/22 Per section 1.10.1.1 states to tie into an existing fire alarm system located in the existing telecom room at Per Papa. There is no fire alarm system in the Pier Papa shelter, the fire alarm panel is located at the maintenance bay telecom room. Please clarify termination location for fire detectors in the new electrical shelter at Pier November.

Tie into the existing fire alarm system in maintenance bay telecom room.

218 2/4/22 Is exhaust required at the storage building and if so what are the requirements?

Yes, provide powered exhaust for the storage building

See Amendment.

219 2/4/22 Please confirm that the foundation support of site utilities can be governed by the local private utility provider requirements even if the DOR does not require? We had the North Charleston Sewer District require pile supported sanitary manholes even though DOR did not require.

See amendment.

231 2/4/22 Please confirm the limits of the vehicle gate. The RFP drawings appear to show the fence running along the South end of the pier and stopping at each corner. Please confirm this fence does not return to the water.

See amended drawings.

270 2/4/22 RFP section 01800-1.12.1.7 requires an exhaust hood for battery charging area. The RFP does not indicate a battery charging area elsewhere.

Please confirm there is no battery charging area and no need for battery charging exhaust.

Exhaust hood for battery charging is not required.

See Amendment.

283 2/4/22

Please confirm whether the Sanitary System on the pier will require clean-outs, and if so please confirm spacing.

See amendment.

284 2/4/22

Specification section 1800, 1.4.2.1 refers to connections points for natural gas. Please confirm natural gas is not required on this project.

303 2/4/22

Specification Section 01110

Paragraph 1.10 New Utility Services, States “Make all arrangements with the local utility providers and pay all fees, charges, and costs…” The last sentence in the paragraph states “All utilities within the base are owned by the Government.” It is our understanding that all water mains within the project limits and within the FLETC facility are owned and operated by Charleston Water System.

Furthermore, the only water lines owned by the Government are the service lines on the private side of the utility meter. Is this correct?

304 2/4/22

Paragraph 1.10.1 Water, States “There will be no charge to connect to the Government water lines.” As per the paragraph above, please show which water lines located within the former Charleston Naval Complex are currently owned by the Federal Government.

305 2/4/22

Paragraph 1.10.2 Sewer, States “There will be no charge to connect to the Government sewer lines.” As per the paragraph above, please show which sewer lines located within the former Charleston Naval Complex are currently owned by the Federal Government.

306 2/4/22

Section 01800 paragraph 1.4.5 Utility Meters

New water meters serving cutter shore ties and specialized uses such as piers shall be installed with wireless metering devices. All required appurtenances shall be compatible with the Data Acquisition Server (DAS) Model A8812, manufactured by Obvius, LLC, which is planned for future installation.” Charleston Water System (CWS) owns the potable water distribution system and will own and install the water meter required to provide cutter shore ties services. CWS does install wireless meters; however, their wireless devices are compatible with their meter reading system and may not be compatible with the system stated above. Does the Government want an additional meter, meeting the requirements above, installed on the government side of the CWS meter?

Yes.

324 2/4/22

Section 01800 1.13.2.2

Section 01800, Paragraph 1.13.2.2, requires five (5) new power mounds to serve NSC’s. However, Paragraph

A total of 5 power mounds will be required.

1.13.12.2 states three new power mounds (a total of three transformers is required). Please confirm the number of required power mounds and transformers.

327 2/14/22

RFP Guide Specifications, Section 01800, 1.12.1.4 and Section 01800, 1.13.12.5.9

Paragraph 1.12.1.4 references ASHRAE 55 which is a standard Thermal Environmental Conditions for Human Occupancy.

It is our understanding that the Electrical Equipment Shelter is not designed for human occupancy.

Please remove all ASHRAE 55 requirements from the RFP.

Paragraph 1.13.12.5.9 requires a maximum temperature of 80 degrees and an interior humidity of 40-60%.

The equipment is designed to operate at a temperature stated in the manufacturer’s O&M documents.

Please confirm that the contractor is allowed to design minimal appropriate measures to maintain environment conditions suitable for the equipment installed based on the manufacture’s recommendations.

Confirmed. ASHRAE 55 compliance is not required since the building is not occupied.

Negative on contractor’s proposal of revising the max temperature limits per manufacturer recommendations.

The Equipment shelter interior temperature setpoints listed in paragraph 1.13.12.5.9 apply to the project.

See Amendment.

339 2/22/22 Section 01800_1.4.7 indicates potable water connection size and total water demand but does not indicate required flow rate. Please provide required flow rate for potable water so the water system can be priced?

340 2/22/22

Please provide fire protection requirement at NSC utility mound including connection type, size, flow rate, minimum pressure, and location relative to NSC so the fire protection can be priced.

On-board fire pumps will not connect to shore systems. There is a Memorandum of Agreement (MOA) between the Coast Guard and North Charleston Fire Department (NFCD).

NFCD will connect to hydrants along Hobson Avenue and each of their trucks carry 1,200 feet of hose.

(They will not draft from the river unless it is a matter of last resort.)

NFCD also has a marine vessel that moors nearby and could be at the site within approximately five minutes.

349 2/22/22

Amendment 005 provides a new Price Proposal form. Base Item has added pricing for "Dredging" and Dredging plus Equipment Removal". Please confirm "Dredging plus Equipment Removal" is for dredging just at the failed bulkhead? Why would we need to breakout this dredging when dredging is just based on the quantity of 385, 449 cyds provided in the TOA?

You will not have the total dredging price since equipment removal in included in this breakout.

Confirmed, "Dredging plus Equipment Removal" is for dredging just at the failed bulkhead.

350 2/22/22 Amendment 005 provides a new Price Proposal form but does not include the Amendment page. Should we include from the previous Pricing Form?

The new price proposal form replaces the previous pricing form.

Amend 0007 - Charleston Pier papa.pdf
1.4.8 Sanitary Sewer
1.4.8.1 Sanitary Sewer Cleanouts
1.10.1 Water
1.10.2 Sewer
1.10.3 Gas
1.10.4 Telephone Service
1.10.5 Electrical
1.4.7.2 Water Demand
Amend 0007 - Charleston Pier papa.pdf
1.4.8 Sanitary Sewer
1.4.8.1 Sanitary Sewer Cleanouts
1.10.1 Water
1.10.2 Sewer
1.10.3 Gas
1.10.4 Telephone Service
1.10.5 Electrical
1.4.7.2 Water Demand
Amend 0007 - Charleston Pier papa.pdf
1.4.8 Sanitary Sewer
1.4.8.1 Sanitary Sewer Cleanouts
1.10.1 Water
1.10.2 Sewer
1.10.3 Gas
1.10.4 Telephone Service
1.10.5 Electrical
1.4.7.2 Water Demand
Amend 0007 - Charleston Pier papa.pdf
1.4.8 Sanitary Sewer
1.4.8.1 Sanitary Sewer Cleanouts
1.10.1 Water
1.10.2 Sewer
1.10.3 Gas
1.10.4 Telephone Service
1.10.5 Electrical
1.4.7.2 Water Demand