70Z04722RCHARLTN00_Amendment 0003.pdf

PDF 2 MB Posted

Attached to
DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC
Solicitation number
70Z04722RCHARLTN00
Issued by

View the file

Other files

File Type Posted
70Z04722RCHARLTN00_Amendment 0012.pdf PDF
70Z04722RCHARLTN00_Amendment 0011.pdf PDF
70Z04722RCHARLTN00_Amendment 0010.pdf PDF
9191617_NSC 9 and 10 HOMEPORT_RECORD_DWG.pdf PDF
15182879CIVIL - C-119REV3.pdf PDF
15182879CIVIL - C-117REV2.pdf PDF
15182879CIVIL - C-122REV2.pdf PDF
15182879CIVIL - C-113REV2.pdf PDF
Stormwater Condition Map.pdf PDF
15182879CIVIL - C-116REV2.pdf PDF
151182879_PRICE PROPOSAL FORM_PierPapaReCAP_Charleston SC_Amend0009.pdf PDF
15182879CIVIL - C-119REV2.pdf PDF
15182879CIVIL - C-115REV2.pdf PDF
15182879CIVIL - C-114REV2.pdf PDF
15182879CIVIL - C-112REV2.pdf PDF
15182879CIVIL - C-111REV2.pdf PDF
VT Dredge Permit (2012).pdf PDF
70Z04722RCHARLTN00_Amendment 0009.pdf PDF
Clean-Process to Conduct Construction Activities.pdf PDF
USACEResolution-VTBulkheadwExhibits_FINAL_signed_16DEC2020.pdf PDF
SCPA Consent Agreement AF-0000258 - 12.15.2020 and Exhibits.pdf PDF
SCPA_VT_LIF Investigation Report.pdf PDF
DM 6322274-v1 Covenants stamped copy 18098-22.pdf PDF
Charleston Naval Complex Permit_October 2016 Renewal.pdf PDF
SCDHEC Approval_LIF Assessment Report _VT Bulkhead.pdf PDF
70Z04722RCHARLTN00_Amendment 0008.pdf PDF
15182879CIVIL - C-122REV1.pdf PDF
15182879CIVIL - C-119REV1.pdf PDF
15182879CIVIL - C-114REV1.pdf PDF
15182879CIVIL - C-113REV1.pdf PDF
15182879CIVIL - C-120REV1.pdf PDF
70Z04722RCHARLTN00_Amendment 0007.pdf PDF
15182879CIVIL - C-112REV1.pdf PDF
15182879CIVIL - G-002REV1.pdf PDF
15182879CIVIL - C-123REV1.pdf PDF
15182879CIVIL - C-116REV1.pdf PDF
15182879CIVIL - C-111REV1.pdf PDF
15182879CIVIL - C-110REV1.pdf PDF
15182879CIVIL - C-115REV1.pdf PDF
15182879CIVIL - C-117REV1.pdf PDF
15182879CIVIL - C-118REV1.pdf PDF
15182879CIVIL - C-124REV1.pdf PDF
15182879CIVIL - C-121REV1.pdf PDF
SCPA-VT-LIF Investigation Report.pdf PDF
SCDHEC Approval-LIF Assessment Report - VT Bulkhead.pdf PDF
70Z04722RCHARLTN00_Amendment 0006.pdf PDF
70Z04722RCHARLTN00_Amendment 0005.pdf PDF
WD_SC20210023.pdf PDF
70Z04722RCHARLTN00_Amendment 0004.pdf PDF
9191617_RECORD_DWG_ELEC EQUIP SHELTER AT PIER PAPA.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC

(SEE CONTINUTATION SHEET)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 18

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE NA Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-243

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z04722RCHARLTN00

9B. DATED (SEE ITEM 11)

12/10/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER

NA

3. EFFECTIVE DATE

2/10/2022

1. CONTRACT ID CODE

70Z04722RCHARLTN00

Amendment No. 0003

PROJECT NUMBER: FY19_15182879

TITLE: ReCAP Pier Papa, Sector Charleston, SC

AMENDMENT NUMBER: 0003

SOLICITATION NO.: 70Z04722RCHARLTN00 IS AMENDED AS FOLLOWS:

1. RFI Question #4

Section 01800, Paragraph 1.1.1 – Project Description DELETE: 1,200 LF of damaged bulkhead

REPLACE WITH: approximately 1,000 LF of damaged bulkhead

2. RFI Question #2 and 27 Section 01900, Paragraph 1.3.1 – Reference Drawings

ADD: Attachment “M” AutoCAD Files

3. RFI Question #6 Section 01800, Paragraph 1.1.1 – Project Description DELETE: Removal of submerged equipment shall be completed ICW dredging before other demolition or construction begins.

REPLACE WITH: Removal of submerged shall be prioritized and coordinated with dredging. Contractor may initiate multiple phases of work simultaneously.

4. RFI Question #67

DELETE: C-103

ADD: New drawing C-103 (Rev 1)

5. RFI QUESTION #69

DELETE: FAR CLAUSE 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT

2021)

No. Rcv REFERENCE QUESTION GOVERNMENT RESPONSE

Pg Section Paragraph 1 12/16/2021 Page

51 of

Programmatic Environmental Assessment for Pier P

Attachment - Programmatic Environmental Assessment for US Coast Guard Base Charleston Expansion & Land Exchange indicates in paragraph 8 under Replacing Piers N and P - Dredging indicates that Hydraulic dredges are slow and noisy which gives marine life sufficient time to get out of the way of the dredge. The material to be dredged is assumed contaminated based on sediment analysis report and hydraulic dredging of contaminated material is not an acceptable means based on the material being contaminated. Advise if mechanical dredging is acceptable.

Per RFP Section 1.18.2, the contractor will obtain all required permits and shall be responsible for incorporating all permit conditions and constraints into the design and ensuring compliance with permits is maintained throughout the project.

Dredging requirements will be outlined in the permit process with USACE & the state. If all permit(s) issued allow mechanical dredging it is an acceptable means to complete dredging work.

2 12/16/2021 Page 83 of

Final RFP Pier Papa Specs

Please provide the Government topographic survey files in AutoCAD.

AutoCAD 2017 files will be provided.

3 12/16/2021 Page 32 of

Programmatic Environmental Assessment for Pier P

Attachment - Programmatic Environmental Assessment for US Coast Guard Base Charleston Expansion & Land Exchange indicates under Dredging Restrictions on page 32 of 215 that Dredging is performed during the winter months (November through February) to avoid impact to West Indian Manatee. Advise if the dredging restriction to occur (November - February) is a requirement or if dredging can occur outside the winter months?

The volume of material to be

The time of year constraints are based on the direction and authority of permitting agencies outside the USCG. The contractor must determine all applicable permit restrictions and requirements, as described in RFP para. 1.18.2 and 1.18.3.

Bidders should incorporate any previously identified seasonal restrictions, as well as others based on their professional experience, into their proposal approach.

Bidders should not assume that the USCG can waive or modify any such restrictions.

removed (385,449 CY) as per the Section 1.19.7.2 Estimated Quantities of the specifications cannot be dredged completely within the time specified winter months.

4 12/16/2021 Page 96 of

Final RFP Pier Papa Specs

The Final RFP Pier Papa Specs under Item 1.8.1.2 indicates the RFP includes construction of a new bulkhead from Pier Mike to Pier November. Under Section 1.1.1 Project Description it is indicated scope of work includes demolition and replacement of 1,200 LF of damaged bulkhead. This length of bulkhead would be the length between Pier Mike to Pier Papa.

Advise what portion of the bulkhead is actually to be replaced?

The limits of bulkhead work are shown on the RFP drawings. Specification 01800- 1.1..1 identifies 1,200 LF, however, the measured drawings show 1,000 LF (rounded). The measurement refers both the missing section and the existing section. See Amendment.

5 12/16/2021 Page 159 of

The Final RFP Pier Papa Specs under Item 1.19.7.2 Estimated Quantities indicates the estimated quantity for bidding purposes shall be 385,449 CY which based on our takeoff appears to be the dredge quantity required for both Piers November and Piers Papa. Drawing C-117 indicates dredging is to occur on the east and west side of pier November which would suggest a lesser quantity. Advise if the bid quantity for this RFP is 385,449 CY or is to be adjusted based on actual work to occur as shown in drawing C-117

Base bids on the 'estimated quantity for bidding' as provided in RFP Specification 01800-1.19.7.2.

6 12/16/2021 Page 13 of

The Final RFP pier Papa Specs under Item 1.13 Work Sequence indicates the removal of submerged equipment shall be completed in conjunction with dredging before

Contractor is allowed to initiate multiple phases work simultaneously. See Amendment other demolition or construction begins. Advise if it is the intent is to not dredge in the footprint of the existing pier considering the dredging is to occur before demolition? Otherwise advise if demolition of the Pier November can occur before or during dredge operation to allow for dredging to occur in the footprint of existing Pier November once the existing pier and piles are removed in its entirety.

8 12/17/2021 Pages 22-24 of 30

The Task Order Announcement states that the page limit for the Non-Price Proposal is 13 pages, but each of the three individual factors are noted to have a 5-page limit, equaling 15 pages total. Please clarify which is correct.

The page limit for the Non-Price Proposal is 15 pages.

8.1 12/27/2021 H325 Facilities for Inactive Vessels 06May1946

As-Builts for Pier

The as-builts for Pier November are provided in the H325 Facilities for Inactive Vessels 06May1946 file.

The existing pier today was constructed in multiple vintages including 1964 and 1976. The as-builts for 1964 and 1976 were not provided. Various images of these as-builts are provided in the Waterfront Inspection Report Pier November dated 03Jan2018 but these images are not sufficient for an accurate takeoff. Please provide the remaining as-built drawings for vintage 1964 and 1976 construction of Pier November considering only the as-builts for 1946 work was provided for Pier November.

The Government has provided all available information.

9 12/27/2021 H335 Ship Berthing As-Builts for Collapsed Bulkhead The as-builts for existing bulkhead between Pier N and Pier M includes The Government has provided all available information. The Contractor may assume

Bulkhead

12JUL1966

only the 280 ft portion representative of the in-tact bulkhead. No as-builts are provided for the remaining 360 ft portion which is collapsed to the west of the existing in-tact bulkhead.

Please provide as-builts for the collapsed portion of bulkhead or define the construction methods used for the collapsed bulkhead in order to realize the cost associated with removal.

the missing bulkhead has the same construction as the section to the south.

11 1/10/2022

Please refer to the solicitation page

22. Please confirm single spaced paragraphs are acceptable for narrative sections of the proposal.

Single spaced paragraphs are acceptable.

12 1/10/2022

23 non price factor 2 – Env.

Compliance #3. Do all three (3) comparable projects referenced in the non-price factors need to be complete, or are current projects with milestone deadlines that have been met acceptable?

Proposals may include in-progress projects for Non Price Factor 2.3, but should clearly identify what milestones and major tasks have been successfully completed to date. Note that less evaluation merit may be granted to project elements that are still underway or yet to be started.

13 1/10/2022

23 non price factor 2 – Env.

Compliance #3. Do all three (3) comparable projects referenced need to be performed by the Contractor or will projects completed by subcontractors with teaming agreements, designers, or consultants be allowed?

Proposals may include projects performed by proposed subcontractors, designers, or consultants. Project descriptions in Non Price Factor 2.3 should clearly identify which entity performed the work, and narratives in Non Price Factor 2.3 should describe their respective team role (s) and work history with the Prime Contractor.

Note that projects performed by subcontractors/consultants without a proven work history with the Prime may negatively affect the proposal’s rating evaluation (see Solicitation Sec VIII) in terms of risk and probability of success.

15 1/10/2022 The Nationwide Permit General

Conditions, United States Army It will be up to the contractor to evaluate/determine and prepare all

Core of Engineers (USACE) Charleston District Regional Conditions and additional special conditions outlined in USACE Pre- Construction Notification (PCN) SAC-2011-00062 dated 31 August 2015 has been identified as applicable to previous efforts to repair this bulkhead failure. Is this permit applicable to this solicitation and if so, can you please provide a copy of the referenced document for review?

required environmental permit applications to all regulatory agencies (federal, state, local) that are required of this project. The USCG will sign these permit applications as the owner.

Previous permit applications may or may not be helpful in this process or may or may not be applicable. The contractor must provide the permitting expertise to evaluate the permitting requirements.

See RFP Section 01800 - 1.18 for permitting guidance.

16 1/10/2022 Additional environmental studies and contamination reports were completed after collapse of the bulkhead between Pier Mike and Pier November, which is now part of the work under this RFP. Does the Government have access to these additional environmental studies and will this information be considered as part of this contract?

The government has provided all environmental studies it had available for use as reference documents.

17 1/10/2022 Please change the “Total page limitation for Non-Price proposals” from 13 to 15 pages to match the 5 page limit for each of the three Non Price Factors.

The page limit for the Non-Price Proposal is 15 pages.

19 1/10/2022 Please provide as-built record drawings for the ca. 1964 and 1976 Pier "N" construction.

See RFI 9 response.

20 1/10/2022 Please provide as-built record drawings for fender retrofit construction at Pier "N."

See RFI 9 response.

23 1/10/2022 _151828879_FinalRFP_PierPapa_ReCA P_Charleston_SC (1).pdf

Section_01800: 1.1-1.3__Page 72:

1.1.1 Project Description: Dredge

depth for NSC Objective mooring will

Is the current design depth of -30' +2' of paid overdepth to be used for establishing a basis for bid? Is the intent for the dredge footprint to be dredged to -30' +2' paid overdepth at the face of the

Yes, the design depth of -30' +2' is the requirement, however, the basis of bid shall be the dredge quantity provided in RFP Specification 01800-1.19.7.2.

be to -30' MLLW plus an additional -2' over dredge depth with 4:1 side slopes and a 30' offset from seawall/bulkhead. Section_01800: 1.1- 1.3__Page 72: 1.1.1 Project Description: Dredge depth for NSC Objective mooring will be to -30' MLLW plus an additional -2' over dredge depth with 4:1 side slopes and a 30' offset from seawall/bulkhead.

Section_01800:1.19_Page 159:

1.19.7.2.1 Dredge Limits for Quantity

Measurement The Contractor shall dredge the area shown on the RFP Drawings. The Contractor shall dredge to a minimum elevation of -30 MLLW, excluding over depth dredging.

Section_01800:1.19_Page 160:

1.19.7.2.2 Special Conditions: The

depth of dredging at the existing bulkhead is critical to ensure the existing anchored steel bulkhead is not structurally compromised. In accordance with 1962 (circa) bulkhead as-built drawings, the sheet pile bulkhead extends to a depth of -50 MLW and was designed to accommodate an anticipated dredge depth at of -35 MLW. For preliminary purposes, the total dredge depth at the bulkhead depth shall be set at -30 MLW followed by a 1:4 slope to the ultimate dredge depth. The Contractor has the responsibility to assess the bulkhead to determine if favorable conditions exists to permit dredging below -30 MLW.

Drawings Plan Sheets C-111 to C-117 bulkhead and continue at that elevation through the dredge prism, but if during the design and permitting process the prism can be deepened, then the 30' offset and 4:1 slope come into play? Please clarify.

indicate "Dredge Area to Elevation -32 MLLW (including 2' overdepth) See RFP specifications for additional information. Section_01800: 1.1- 1.3__Page 72: 1.1.1 Project Description: Dredge depth for NSC Objective mooring will be to -30' MLLW plus an additional -2' over dredge depth with 4:1 side slopes and a 30' offset from seawall/bulkhead.

Section_01800:1.19_Page 159:

1.19.7.2.1 Dredge Limits for Quantity

Measurement The Contractor shall dredge the area shown on the RFP Drawings. The Contractor shall dredge to a minimum elevation of -30 MLLW, excluding over depth dredging.

Section_01800:1.19_Page 160:

1.19.7.2.2 Special Conditions: The

depth of dredging at the existing bulkhead is critical to ensure the existing anchored steel bulkhead is not structurally compromised. In accordance with 1962 (circa) bulkhead as-built drawings, the sheet pile bulkhead extends to a depth of -50 MLW and was designed to accommodate an anticipated dredge depth at of -35 MLW. For preliminary purposes, the total dredge depth at the bulkhead depth shall be set at -30 MLW followed by a 1:4 slope to the ultimate dredge depth. The Contractor has the responsibility to assess the bulkhead to determine if favorable conditions exists to permit dredging below -30 MLW. Drawings Plan Sheets C-111 to C-117 indicate "Dredge Area to Elevation -32 MLLW (including 2' overdepth) See RFP specifications for additional information.

Section_01800:1.19_Page 159:

1.19.7.2.1 Dredge Limits for Quantity

Measurement The Contractor shall dredge the area shown on the RFP Drawings. The Contractor shall dredge to a minimum elevation of -30 MLLW, excluding over depth dredging.

Section_01800:1.19_Page 160:

1.19.7.2.2 Special Conditions: The

depth of dredging at the existing bulkhead is critical to ensure the existing anchored steel bulkhead is not structurally compromised. In accordance with 1962 (circa) bulkhead as-built drawings, the sheet pile bulkhead extends to a depth of -50 MLW and was designed to accommodate an anticipated dredge depth at of -35 MLW. For preliminary purposes, the total dredge depth at the bulkhead depth shall be set at -30 MLW followed by a 1:4 slope to the ultimate dredge depth. The Contractor has the responsibility to assess the bulkhead to determine if favorable conditions exists to permit dredging below -30 MLW.

Drawings Plan Sheets C-111 to C-117 indicate "Dredge Area to Elevation -32 MLLW (including 2' overdepth) See RFP specifications for additional information.

24 1/10/2022

Section_01800:1.19_Page 160: 1.19.11 Disposal of Excavated Material: The Contractor shall provide for safe

As a design-build project will the USCG provide the dredge material disposal location(s) to establish a

No.

transportation and disposal of dredged materials at an approved disposal area.

The deposit of dredged materials in unauthorized places is forbidden.

Comply with rules and regulations of federal, state, and local regulators and also any local port and harbor governing authorities/entities.

basis for bidding purposes and indicate a quantity of material that goes to the disposal location(s) if there are multiple?

27 1/10/2022

General

Can the USCG provide the most recent hydrographic survey in .xyz format?

AutoCAD 2017 files will be provided. Files contain the “Z” coordinates. See Amendment

28 1/10/2022

Terracon+Study+- +Surface+and+Sediment+(2019).pdf

5.0 Recommendations (pg 18): The

Soil and Groundwater Management Plan (SGMP), previously developed for VT to address exposure to contaminated soil and groundwater, needs to be made accessible to all parties during excavation activities.

The SGMP provides details on the handling, testing, containment, removal, and disposal of contaminated soils and containment and disposal of contaminated groundwater.

Can the USCG provide the Soil and Groundwater Management Plan (SGMP) that was previously developed for the site (Veterans Terminal)?

The government has provided all environmental studies it had available for use as reference documents.

29 1/10/2022

SECTION_01800:1.8_Page | 97

1.8.2.2.4 Cast-in-Place Concrete All

cast-in-place concrete for the pier deck, pile caps, beams, foundations and slabs shall be minimum 5,000 psi mix designed to either the Durability Requirements of ACI-314 or the current UFC “Marine Concrete” mix suitable for a splash zone seawater environment to achieve a minimum 75-year service life. All reinforcing shall be epoxy coated.

Is it acceptable to use black rebar (non-coated reinforcing) provided the selected marine concrete mix design and concrete cover is demonstrated to meet the minimum 75-year service life per the UFGS 03 31 29 Marine Concrete with Service Life Modeling specification?

No.

30 1/10/2022

SECTION_01800:1.8_Page | 101 1.8.5.1 Waterside Design Load Criteria The Contractor is responsible for the vessel

The table provides Ship Characteristics for the NSC vessel. Please confirm that there

There are no other layout requirements beyond what has been established in RFP Specification 01800-1.8.5.1.

layout and calculation of berthing energy and mooring forces, IAW UFC 4- 152-01 and UFC 4-159-03, based upon the following vessels:

are no other vessels to be considered for the layout and design of the new pier outside the five National Security Cutters (NSC’s).

34 1/10/2022 SECTION_01800:1.13_Page | 126

1.13.12.4.2 Locations of the new

power mounds shown on the RFP drawings are approximate; determine exact location in coordination with the locations of water, sewer and other utilities, other pier structures including cleats and bollards, etc. Location of the power mounds is based on the connection point of shore tie cables on the NSC at the stern of each cutter.

Please provide RFP drawings that show the locations of power mounds referenced in this section.

The drawings requested are included in the RFP.

58 1/14/2022

All

Programmatic Environmental Assessment, page 3-17 reads

Section reads “Existing SCPA and USCG dredge permits provide procedures for the appropriate handling and disposal of contaminated dredged material and it is expected that future USCG waterfront development would need to follow similar procedures.”

Please provide the referenced procedures.

The government has provided all environmental studies it had available for use as reference documents.

59 1/14/2022

All

Programmatic Environmental Assessment, pages 17 and 3-10

Section cites a reference USACE 2011 with regard to sediment contamination. This reference is not listed in the document’s references section. Please identify the reference document and provide a copy.

The government has provided all environmental studies it had available for use as reference documents.

60 1/14/2022

All

The Programmatic Environmental Assessment Section 2.4

Section identifies multiple on-going Agency Consultations being performed and stated to be continued by the USCG.

Specification 01800, Section 1.18.2 identifies that the Contractor shall

The government has provided all available environmental work completed to date that it has available. The contractor must complete all permitting work , consultation work, and basically fill in any missing environmental work

“assume a leading role” with regards to the continued consultations. Please describe the roles & responsibilities that the Contractor is to assume.

required to obtain all required permits/approvals to execute the scope of work. See RFP 01800 – 1.18 for additional information.

67 1/18/2022

Final

RFP

Pier Papa Specs

Drawing No C-103 Drawing number C-103 is titled “Civil Existing Conditions”. The drawing itself seems to be identical to drawing C-119 “Civil Conceptual Site Plan”. Please review drawing C-103 provide the correct drawing which would depict existing conditions as noted in the title block.

There are a few conceptual features that were inadvertently plotted on C103 due to a layer issue. An amended C103 shall be issued. See amendment 0003.

86 1/24/2022 As-Builts The Pier Mike as-builts for the failed bulkhead were not provided.

Please provide these as-builts to help define the extent of removal work required in this area.

The Government has provided all available information. The Contractor may assume the missing bulkhead has the same construction as the section to the south.

106 1/28/2022 C-122, Note 2 For patching of site surfaces, please confirm pavement and base design where communication duct bank will tie into the existing electrical equipment shelter.

FDCC does not have as-built drawings of the existing pavement in that area.

121 2/1/2022 Please provide any available CAD files of the Bulkhead and Pier November.

The CG does not have CAD files of the bulkhead or Pier November.

131 2/1/2022 Please provide any available CAD files of the Bulkhead and Pier November.

The CG does not have CAD files of the bulkhead or Pier November.

177 2/4/22 We request a site visit to Pier Papa for viewing the existing electrical building prior to proposal. Can this be accommodated?

At this time there are no additional site visits planned.

226 2/4/22

TOA, section V. Award on Initial Responses, Non-Price Proposal states page limitation is 13 pages, however each Factor 1, 2, 3 set a page limit at 5 pages each for a total of 15 pages. Please confirm the total page limitation is 15 page

The page limit for the Non-Price Proposal is 15 pages.

313 2/4/22

Please provide the sign in sheets from the site visit conducted on 1/13/2022.

See Attached.