70Z04722RCHARLTN00_Amendment 0009.pdf

PDF 535 KB Posted

Attached to
DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC
Solicitation number
70Z04722RCHARLTN00
Issued by

View the file

Other files

File Type Posted
70Z04722RCHARLTN00_Amendment 0012.pdf PDF
70Z04722RCHARLTN00_Amendment 0011.pdf PDF
70Z04722RCHARLTN00_Amendment 0010.pdf PDF
9191617_NSC 9 and 10 HOMEPORT_RECORD_DWG.pdf PDF
15182879CIVIL - C-119REV3.pdf PDF
15182879CIVIL - C-117REV2.pdf PDF
15182879CIVIL - C-122REV2.pdf PDF
15182879CIVIL - C-113REV2.pdf PDF
Stormwater Condition Map.pdf PDF
15182879CIVIL - C-116REV2.pdf PDF
151182879_PRICE PROPOSAL FORM_PierPapaReCAP_Charleston SC_Amend0009.pdf PDF
15182879CIVIL - C-119REV2.pdf PDF
15182879CIVIL - C-115REV2.pdf PDF
15182879CIVIL - C-114REV2.pdf PDF
15182879CIVIL - C-112REV2.pdf PDF
15182879CIVIL - C-111REV2.pdf PDF
VT Dredge Permit (2012).pdf PDF
Clean-Process to Conduct Construction Activities.pdf PDF
USACEResolution-VTBulkheadwExhibits_FINAL_signed_16DEC2020.pdf PDF
SCPA Consent Agreement AF-0000258 - 12.15.2020 and Exhibits.pdf PDF
SCPA_VT_LIF Investigation Report.pdf PDF
DM 6322274-v1 Covenants stamped copy 18098-22.pdf PDF
Charleston Naval Complex Permit_October 2016 Renewal.pdf PDF
SCDHEC Approval_LIF Assessment Report _VT Bulkhead.pdf PDF
70Z04722RCHARLTN00_Amendment 0008.pdf PDF
15182879CIVIL - C-122REV1.pdf PDF
15182879CIVIL - C-119REV1.pdf PDF
15182879CIVIL - C-114REV1.pdf PDF
15182879CIVIL - C-113REV1.pdf PDF
15182879CIVIL - C-120REV1.pdf PDF
70Z04722RCHARLTN00_Amendment 0007.pdf PDF
15182879CIVIL - C-112REV1.pdf PDF
15182879CIVIL - G-002REV1.pdf PDF
15182879CIVIL - C-123REV1.pdf PDF
15182879CIVIL - C-116REV1.pdf PDF
15182879CIVIL - C-111REV1.pdf PDF
15182879CIVIL - C-110REV1.pdf PDF
15182879CIVIL - C-115REV1.pdf PDF
15182879CIVIL - C-117REV1.pdf PDF
15182879CIVIL - C-118REV1.pdf PDF
15182879CIVIL - C-124REV1.pdf PDF
15182879CIVIL - C-121REV1.pdf PDF
SCPA-VT-LIF Investigation Report.pdf PDF
SCDHEC Approval-LIF Assessment Report - VT Bulkhead.pdf PDF
70Z04722RCHARLTN00_Amendment 0006.pdf PDF
70Z04722RCHARLTN00_Amendment 0005.pdf PDF
WD_SC20210023.pdf PDF
70Z04722RCHARLTN00_Amendment 0004.pdf PDF
70Z04722RCHARLTN00_Amendment 0003.pdf PDF
9191617_RECORD_DWG_ELEC EQUIP SHELTER AT PIER PAPA.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

DESIGN-BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC

(SEE CONTINUTATION SHEET)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 30

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE NA Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-243

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z04722RCHARLTN00

9B. DATED (SEE ITEM 11)

12/10/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER

NA

3. EFFECTIVE DATE

3/4/2022

1. CONTRACT ID CODE

PROJECT NUMBER: FY19_15182879

TITLE: ReCAP Pier Papa, Sector Charleston, SC

AMENDMENT NUMBER: 0009

SOLICITATION NO.: 70Z04722RCHARLTN00 IS AMENDED AS FOLLOWS:

THE DUE DATE FOR PROPOSALS (MARCH 29, 2022) REMAINS UNCHANGED

1. RFI Questions #61, 102, 181, 315, 316, 353, 417

Add the following language to the RFP

RFP Specification 01800 – 1.18.1.5 DEFINITIONS

Upland Non-Contaminated Soils and Materials – Any excavated soil, aggregate or debris recovered on the landward side of the former Piers M/N bulkhead wall that are considered clean enough for reuse on-site based on State of South Carolina environmental regulatory requirements. These materials will exhibit levels of contaminants (petroleum, toxic metals, volatile and semi-volatile organic compounds, PCBs and Dioxin, organopesticides, hazardous waste characteristics, etc.) below applicable State action levels.

Upland Contaminated Soils and Materials – Any excavated soil, aggregate or debris recovered on the landward side of the former Pier Piers M/N bulkhead wall that are not clean enough for reuse on-site based on contaminant levels exceeding State of South Carolina action levels. These materials will require disposal in an approved facility (e.g., RCRA Class D landfill) but would not trigger requirements for management as hazardous wastes as defined under 40 CFR 261 and equivalent State standards.

Non-Contaminated Dredge Spoils – Any dredged materials recovered from the outboard side of the former Piers M/N bulkhead wall that are considered clean enough for disposal at a U.S.

Army Corps of Engineers (USACE) Dredge Disposal Cell/Facility in the Charleston, SC area.

Dredged materials may still contain environmental contamination, however environmental contamination levels will be low enough that the USACE will accept these materials at one of their Charleston dredge disposal cells/facilities.

Contaminated Dredge Spoils – Any dredged materials recovered from the outboard side of the former Piers M/N bulkhead wall that contain environmental contamination levels which would cause the USACE to not accept them at a Charleston Dredge Disposal cell/facility, and would require alternative disposal. These materials will require disposal in an approved facility (e.g., RCRA Class D landfill) but would not trigger requirements for management as hazardous wastes as defined under 40 CFR 261 and equivalent State standards.

RFP Specification 01800 – 1.18.5.2.5 CONTAMINATED UPLAND AND DREDGE SPOILS

DISPOSAL

For areas of upland excavation and spoils generated as part of in-water dredging, the contractor will segregate contaminated from non-contaminated materials to the maximum extent practicable. See RFP 01800 – 1.18.1.5 for applicable definitions of “non-contaminated” and “contaminated.”

Upland disturbed/excavated Areas – The Contractor shall ensure that any soil, aggregate or debris recovered on the landward side of the former Piers M/N bulkhead are properly stored until all testing and disposal can be arranged. The Contractor shall provide a cost per ton disposal rate for contaminated soils and materials as part of the bid schedule. For bidding purposes, assume that up to 1,500 tons of contaminated upland soil and material may be generated. The contractor will only remove soils and materials from upland areas as required to complete construction activities. Any materials that are found to be RCRA hazardous wastes or are otherwise too contaminated for RCRA Class D landfill disposal will be considered to be a changed site condition.

Dredge Spoils – For dredge spoils generated during required dredging activities, the Contractor shall assume that dredge spoils will be allowed for disposal at a USACE disposal facility/cell in the Charleston, SC area and will bid the project accordingly. In the event that the USACE will not accept a portion of the dredge spoils due to environmental contamination this will be considered a changed site condition. The contractor must separate non-contaminated dredge spoils from contaminated dredge spoils to the maximum extent practicable in order to minimize the quantity of contaminated dredge spoils not allowed at a USACE disposal facility/cell.

ADD to BID SCHEDULE

Upland Contaminated Soils and Materials for Disposal $ / ton (up to 1,500 tons)

2. RFI Questions #244 and #245 Section 01800, Paragraph 1.16

DELETE: paragraphs 1.16.20, 1.16.21 and 1.16.22

3. RFI Questions #102 Section 01800, Paragraph 1.9.6.6

ADD: Assume tank to be an approximately 1000-gallon single -walled steel diesel tank.

4. RFI Questions #125 Price Proposal Form, Option item 1

DELETE: “brow between double berthed NSCs.”

5. RFI Questions #214 Section 01800, Paragraph 1.13.12.1.3

ADD: “Each vessel load is estimated to be approximated 350KVA (500KVA with allowable tolerances). 4 NSC vessel are estimated to be 2,000KVA total. 2500KVA of load with the optional fifth (5th) NSC.

6. RFI Questions #374 Section 01800, Paragraph 1.13.14.1

DELETE: “Generator on site tests shall be in accordance with NFPA 110. Contractor shall provide fuel required for testing and shall provide a full fuel tank on completion of testing.

7. Section 01800, Paragraph 1.9.5 – Dredge Material (RFI #22, #57) DELETE: The baseline assessment of the material types for dredging is based upon U.S. Army Corps of Engineers Final Report for dredging (2005) which showed the bottom sediments were comprised primarily of medium to fine-grained sands, with variable concentrations of silt/clay and shell hash. This report is provided within Attachment A-Dredging.

ADD: The baseline assessment of the material types for dredging is based upon the Geotechnical Engineering Report by TerraCon dated 10-Sep-2021, provided within Attachment B- Geotechnical and Environmental.

8. RFI Questions #378

Section 01110, Paragraph Table for “local electrical provider is as follows:”

DELETE: “ECE&G” and “(803) 217-8495” in the table ADD: “Dominion Energy” and “800-251-7234”

9. RFI Question #389, RFP Attachment H ADD: Add “Stormwater Condition Map.pdf” to Attachment H.

10. RFI Questions #400 Section 01800, Paragraph 1.13.3.3 DELETE: “Conduit run under piers shall be type RTRC (minimum .25 inch wall thickness) in accordance with Attachment “I””

11. RFI Questions #404 Section 01800, Paragraph 1.13.11 ADD: “1.13.11.1 Each power mound shall be equipped with an audio and visual alarm function for ground fault notification.”

12. RFI Question # (N/A) Section 01800, Paragraph 1.4.4.1

DELETE: “The pier will require access for fuel trucks, fire trucks and other emergency vehicles, as well as 75-ton cranes.”

ADD: “The pier will require access for fuel trucks, fire trucks and other emergency vehicles, as well as 90-ton cranes. See Section 01800, Paragraph 1.8 and Attachment K for additional crane information.”

13. RFI Question #388

DELETE: C-119REV1

ADD: New drawing C-119REV2

14. RFI Question #388

DELETE: C-122REV1

ADD: New drawing C-122REV2

15. Section 01800, Paragraph 1.8.1.2 (RFI #108)

DELETE: N/A

ADD: After Construction of a new pier November for NSC berthing add the following; ‘that accounts for a future design dredge depth of -34 feet MLLW.’

16. Section 01800, Paragraph 1.19.7.2 (RFI #110)

DELETE: FAR 52.212-11

ADD: FAR 52.211-18

17. Section 01800, Paragraph 1.8.3.2.2. (RFI #111) DELETE: ‘Demolition of the in-tact bulkhead system is a project requirement’ ADD: ‘Demolition of the in-tact bulkhead system is not a project requirement’

18. Section 01800, Paragraph 1.8.1.2 (RFI #172) REPLACE: First sentence of the second bullet.

REPLACE WITH: ‘Demolition of the existing bulkhead and relieving platform system, as necessary, to install the new bulkhead.’

19. Section 01800, Paragraph 1.8.4.5, second sentence (RFI #197).

DELETE: ‘from the fixed pier to the floating docks‘

ADD: N/A

20. RFI Question #276

DELETE: C-111REV1, C-112REV1, C-113REV1, C-114REV1, C-115REV1, C-116REV1

ADD: New drawings C-111REV2, C-112REV2, C-113REV2, C-114REV2, C-115REV2, C-

116REV2

21. RFI Question #223

Price Proposal Form, Option #1

DELETE: “additional fenders to support double berthing.

22. Section 01800, Paragraph 1.11.9 (RFI Question #351)

The intent of the RFI-351 is to correct verbiage from Amend 0005.

DELETE: The system shall be designed to serve NSCs moored at Pier Papa.

ADD: The system shall be designed to serve NSCs moored at Pier November.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION

OF OFFER

Question No.

Date Received

REFERENCE

QUESTION GOVERNMENT RESPONSE

Pg Section Paragraph

22 1/10/2022 Section_01800:1.19_Page 159: 1.19.5

Dredge Material: The baseline assessment of the material types for dredging is based upon U.S. Army Corps of Engineers Final Report for dredging (2005) which showed the bottom sediments were comprised primarily of medium to fine-grained sands, with variable concentrations of silt/clay and shell hash. This report is provided within Attachment A- Dredging.

Attachment A contains a bathymetric survey. Please provide the U.S. Army Corps of Engineers Final Report for dredging (2005) document?

See Amendment 0009.

38 1/14/2022 1.5.2.7 RFP states "assume Site Class F for bidding purposes." Without The DB team performing a site specifc study pre-bid, please confirm that the DB team can use the results from the site specifc study contained in Terracon's Geotechnicla Engineering Report, dated September 10, 2021 to develop their pre-bid design and bid prices;

and can use this data for post-award/final design.

The Geotechnical Information within Attachment ‘B’ is provided to develop pre-bid designs and bid prices.

As stated in RFP 01800-1.5.2.1; ‘The Contractor shall retain the services of registered design professional for the purpose of reviewing the Government provided site investigation, soil borings, and laboratory testing for completeness of the design.‘

As stated in RFP 01800-1.5.2.2; ‘Any additional geotechnical investigation deemed necessary by the consultant shall be obtained by the consultant and paid for by the Contractor. The cost of additional required geotechnical work shall be included in the Contract Sum.’

50 1/14/2022

1.8.5.3.2 Is the wind speed stated assumed to

be a 3-second gust?

Yes.

52 1/14/2022

1.8.5.9

Please provide additional clarificaiton for bidding purposes on the requirements of the fender system.

Should a minimum spacing be assumed for the 12'x24' fenders? Is there a prefered material for fender panels behind the foam-filled fenders? Is a fender system required to be provided around the perimeter of the pier bewteen fender units, or are the 12'x24' fenders the only system required? If continuous, is a timber fender system acceptable?

For minimum quantity, Refer to Amendment 0009.

57 1/14/2022

Specification 01800, Section 1.19.5

Dredge Material, references a “U.S Army Corps of Engineers Final Report for dredging (2005)” provided in Attachment A-Dredging. This report was not included with Attachment A, can USCG provide a copy of this report?

Refer to Amendment 0009

61 1/14/2022

RFP pg 159 Sect 01800: 1.19.7.2

The Contractor requests the dredging quantity of 358,449 cubic yards to be isolated as it's own unit price pay item and not included in the Base Item Lump Sum as this item is subject to "Variation in Estimated Quantities".

Concur. See Amendment 0009

64 1/18/2022 Specification 01800, Section 1.8.3.3 A preliminary evaluation of the geotechnical information indicates significant settlement will occur behind the bulkhead due to the fill required and resulting surcharge, especially during a design-level seismic design. Does the Coast Guard have maximum settlement criteria for the area behind the bulkhead?

USCG does not have amplifying guidance. The DOR shall determine the settlement criteria.

68 1/20/2022 RFP, page 72 of 209, Section 01800 Part 1 General para 1.1, Lines 15 and

16.

Referenced section, states "The 5th NSC will require additional space be added to Cutter Support Building

See drawing A-101 and Section 01800, para. 1.17.

supporting the other four NSCs" However there are no drawings or data delineating what is required to add to the Cutter Support building. Please provide information showing what is required i.e. square footage, room layout, location...finishes.

72 1/20/2022 FinalRFP_PierPapa_ReCAP_Charleston _SC, Page 201 of 209, RFP Drawing C-

Please provide as-built drawings for the electrical equipment shelter at Pier Papa.

As-built drawings in pdf format will be provided..

These As-builts were provided as a part of Amend 0003

79 1/20/2022 RFP page 133 section 01800 paragraph

1.16.10.1 and paragraph 1.16.12

"Telecommunications spaces shall each be provided with dedicated HVAC services. The HVAC service shall be energized from the emergency electrical panel if applicable." Please confirm if an existing emergency electrical panel is available with spare capacity. If not, is the expectation to have the contractor provide an emergency diesel generator? Telecommunications lighting will include integral battery backup for a 90 min backup time to meet code requirement, and telecommunications receptacles will be on UPS, is this acceptable or is emergency power by diesel generator desired?

The answer to the first part of the question is “No, contractor is not expected to provide emergency power with diesel generator. The answer to the second part of the question is “Yes battery backup and UPS is acceptable.

88 1/26/2022 Final RFP Pier Papa

Specs

Per Final RFP Pier Papa specifications under Section 01800 Design Build Criteria section 1.1.1 Project Description indicates the scope of work includes, but is not limited to:

"removal of uncontaminated underwater released aggregate to a depth of -20' MLLW". Is this sentence in reference to the underwater released aggregate upland or outboard side of the once existing collapsed bulkhead? Please clarify.

Yes, outboard side.

97 1/28/2022 Please refer to section 1.8.3.2.2.

"the contractor shall remove all the missing bulkhead components of the missing section between Pier Mike and Pier November. The missing section experienced a failure and the remnants of the bulkhead system are resting on the sea floor". Based on our understanding, this was a circular/rotational failure. The components of the bulkhead system could be buried down to EL -40 and not just resting on the sea floor. In order to remove these components, specifically around the new sheet pile wall location, a massive SOE system would need to be installed in order to prevent further collapse and erosion of material as this area is excavated/dredged out to remove the pieces. This excavation could result in 150,000 cy of material.

1 - Please confirm all pieces of the failed bulkhead will need to be removed regardless of depth and location.

2 - Please provide what material is to be used as backfill waterside.

3 - Will USCG provide additional laydown area in order to process and stockpile debris material removed from the failure site?

For item #1, See Amendment 0005.

For Item #2 Shall be up to the DOR.

For item #3, No.

99 1/28/2022 The RFP states that the underwater released aggregate be removed to -20 MLLW. Does this requirement only relate to the

The aggregate on the OUTBOARD side of the former bulkhead wall must be removed. The Government aggregate water side of the new bulkhead line or will aggregate have to be removed on land side as well? Due to the nature of the collapse and current site conditions, almost all of the aggregates land side of the collapse are also “under water”, thereby per RFP would need to excavate to -20 MLLW, and those aggregate limits extend within 50’ of Hobson Ave. Please confirm.

presumes the released aggregate is no deeper than -20 MLLW.

Released aggregate on the INBOARD side of the former bulkhead shall remove at the discretion of the DOR.

101 1/28/2022 RFP Section 01800 Paragraph 1.8.1.2, Paragraph 1.8.3.2.1

RFP section 01800 paragraph

1.8.1.2 specifies the requirements to demolish the deadman, tiebacks and support piles. Also Paragraph 1.8.3.2.1 specifies the demolition of the in-tact bulkhead system. Would it be okay to leave the existing sheet piles, relieving platform system and deadman piles of the in-tact bulkhead abandoned in place?

See Amendment 0005

102 1/28/2022

SECTION 01 80 00 Paragraph 1.9.6.6

Underground storage tank to be demolished at Building 203 -please confirm the size and type of tank.

Assume tank to be an approximately 1000-gallon single -walled steel diesel tank.

108 1/28/2022 RFP Sec 018000 Paragraph 1.8.1.2 For the removal and replacement of the bulkhead, please confirm that 'removal' includes fully removing all sheet piling, existing concrete bulk head, tie backs, and dead men.

110 2/1/2022 Specification Section 011800, Paragraph 1.19.7.2 notes the application of the “FAR 52.212-11, Variation in Estimated Quantity”. Which appears to be a typo. Please verify this should read, application of the “FAR 52.211-18, Variation in Estimated

See Amendment 0009 for correction to FAR clause.

Quantity”. Which if it is, FAR 52.211-18 is based off the quantity of a unit-priced item estimated verses actual quantity.

The Price Proposal Form does not include anywhere to list the unit price. Will a updated Price Proposal Form be provided to include a unit price?

111 2/1/2022 Specification Section 01800, Paragraph 1.8.3.2.1, states “Demolition of the in-tact bulkhead system is a project requirement, however, the Contractor is not prohibited from demolishing the existing bulkhead and relieving platform system.”

Please confirm this should state:

““Demolition of the in-tact bulkhead system is not a project requirement, however, the Contractor is not prohibited from demolishing the existing bulkhead and relieving platform system.”

Correct. See Amendment 0009.

117 2/1/2022

Reference: Waterfront Facility Inspection and Assessment at South Carolina State Port Authority Pier November – Veterans Terminal North Charleston, South Carolina – January 2018 by Appledore Marine Engineering, LLC.

Question: Page 5 of 164 indicates a Condition Assessment Rating Plan which indicates the bulkhead “structure in serious condition,” and extends beyond the Pier November. However, Drawing Sheet C-122 of the RFP shows the approximate location of the new bulkhead tie-in ending at the existing Pier November. Please

Bulkhead tie-in points are shown on RFP drawings C-117, C-119 and C- 122.

confirm the location of the new bulkhead tie-in with the existing bulkhead.

125 2/1/2022 RFP Section 01800 Para 1.8.6 states that the contractor is NOT responsible for gangway(s) between nested vessels, but the description of Option Item 0001 states to include a brow between the double berth. Please clarify the brow/gangways that are to be included in the base bid and options. If the contractor is required to provide the brow at the nested berth, please provide approximate dimensions and geometry that are required.

Contractor is not required to provide brow associated with the nested NSC option. See Amendment

128 2/1/2022 Specification Section 01 11 10, Paragraph 1.14

Removal of submerged equipment shall be completed ICW dredging before other demolition or construction begins.” Please clarify if dredging work can occur after equipment removal ICW or after in-water demolition at the Contractors’ discretion.

Contractor is allowed to initiate multiple phases work simultaneously. See Amendment 0003.

140 2/2/22

Section 1.8.2.3 Design Loads

Seismic Site class states “The site class shall be based on using the site class as recommended by the Contractor’s Geotechnical Engineer IAW the IBC 2021 and UFC 3-301-01…” and provides an Ss = 0.066g and S1 = 0.49g. If IBC 2021 is used Ss and S1 are higher than the values provided.

Confirm/Clarify which values for Ss and S1 should be used, those specified in IBC 2021 or the values stated in RFP.

Per RFP 01.8.2.3, ‘Loads listed below are the minimum design loads and shall be increased by the Designer of Record as deemed necessary to ensure intended continued use and function of the facility or to provide adequate strength to support construction loads.

142 2/2/22

Appendix D Design Narrative Sept2012

Basis of Fire Protection Design Narrative” indicates “Design shall be in accordance with Mil- Handbook 1008-B…”. This document has been superseded with UFC 3-600-01. Please confirm the most recent edition of UFC 3- 600-01 (8 Aug 2016, Change 6 dated 6 May 2021) is applicable.

Confirmed, project design should be in compliance with the most current requirement as applicable.

149 2/3/22

RFP Page 85, Section 01800, Paragraph 1.4.7.2

Please provide the minimum flow and pressure required at the point of connection to the NSC for on-board fire suppression systems.

In addition, please identify any minimum flow requirements for fire protection purposes. The referenced section of the RFP requires water modeling to 'ensure all proposed fire hydrants, fire suppression systems and domestic service lines will provide adequate pressures and flows as required by the International Fire Code". The International Fire Code specifies minimum fire flow requirements based on the type of construction and fire area of buildings. NFPA 307, Standard for the Construction and Fire Protection of Marine Terminals, Piers and Wharves, states "the capacity of the water system shall be sufficient to deliver the quantity of water determined by the authority having jurisdiction".

On-board fire pumps will not connect to shore systems. There is a Memorandum of Agreement (MOA) between the Coast Guard and North Charleston Fire Department (NFCD).

NFCD will connect to hydrants along Hobson Avenue and each of their trucks carry 1,200 feet of hose.

(They will not draft from the river unless it is a matter of last resort.)

NFCD also has a marine vessel that moors nearby and could be at the site within approximately five minutes.

159 2/3/22 Section 01110 DESIGN BUILD

GENERAL PARAGRAPHS, 1.15

RELOCATED EQUIPMENT AND

ITEMS

Section 01110 DESIGN BUILD

GENERAL PARAGRAPHS, 1.15

RELOCATED EQUIPMENT AND

ITEMS States “ Disconnect, Confirmed, neither the RFP nor the RFP drawings identify items requiring re-location. That verbiage dismantle if necessary, remove, relocate, reinstall, connect, and test items shown on the drawings.”

Please confirm that there is no equipment that needs to be relocated for this project, if there is equipment that needs to be relocated for this project, please provide list of relocated equipment.

is standard and is meant to be as applicable.

162 2/3/22

SECTION 01800

TELECOMMUNICATIONS /

ELECTRONICS CONSTRUCTION

SPECIFICATIONS Paragraph 1.16

Section 1.16.10.2

SECTION 01800

TELECOMMUNICATIONS /

ELECTRONICS CONSTRUCTION

SPECIFICATIONS Paragraph 1.16 Section 1.16.10.2 states The HVAC service shall be energized from the emergency electrical panel if applicable.

Please confirm that there is not an emergency generator required for this project and that the HVAC service is not connected to emergency power.

Confirmed, emergency generator is not required for this project and that the HVAC service is not connected to emergency power.

See response to RFI #79

172 2/4/22 RFP Guide Specifications, Section

01800, 1.8.1.2 Second Bullet Point

Will the government allow the demolition of the existing bulkhead to be, as necessary to install the new bulkhead?

See Amendment 0009.

173 2/4/22 What is the regulatory status of contamination identified in the Terracon Study – Surface and Sediment (2019) with respect to the U.S. Navy’s RCRA Permit for corrective action?

See amendment 0006. References to removal of 1,500 CY of contaminated soil has been removed. Additional references have been provided in Attachment N that document that petroleum contamination in this location has been remediated, to include the capping of underground piping. Attachment N also includes more general information on the Navy’s RCRA Part B permit commitments.

179 2/4/22

When reviewing the Terracon Subsurface & Sediment Investigation Report, we did not see the closure report for the excavation activities that occurred in December 2013 or the 2014 Draft Soil and Groundwater Assessment Report. Please provide these reports if they are available.

See amendment 0006. References to removal of 1,500 CY of contaminated soil has been removed. Additional references have been provided in Attachment N that document that petroleum contamination in this location has been remediated, to include the capping of underground piping.

181 2/4/22

Specification section 01800 paragraph 1.9.6.7

Lists the contaminated soils. Have any of the soil or sediment samples been analyzed for TCLP Metals to determine if they’re potentially considered a RCRA Hazardous Waste? If so, can you please provide the appropriate reports.

See Amendment 006. References to removal of 1,500 CY of contaminated soil has been removed. Additional references have been provided in Attachment N that document that petroleum contamination in this location has been remediated, to include the capping of underground piping. Some representative samples of sediment in the proposed dredge area have been analyzed as described in Sec 01800 1.19.12. In addition, Amendment 009 provides guidance on future discovery of any contaminated soils or dredge material.

182 2/4/22

Please confirm that the design and depth of piles across the length of the pier shall be assumed based on the Terracon Geotechnical Report (10 Sep 2021) and the Moffat Nichols Borings (19 June 1993) soil boring data?

The Contractor shall make use of the Government provided geotechnical data for bidding. The Contractor should not rely upon the recommendations provided within the report.

183 2/4/22

Please confirm the building foundations, concrete paving and site utility foundations are to be designed based of the soil boring data provided in the Geotechnical Reports provided in Attachment B? Also confirm the soil boring data closest to the actual work is to be used to design the foundations such as for the electric

The Contractor shall make use of the Government provided geotechnical data for bidding. The Contractor is encouraged to take into account the boring locations and proximity to the project site.

equipment shelter and the concrete paving from the road to Pier November we are to use borings CP- 1c, BH-3, and CP-3a from the Terracon Geotechnical Data Report EN125099 dated December 10, 2012, and for the Modular Metal Storage Building we are to use boring B-3 from the ECS report data October 1, 2019 as the basis of design.

197 2/4/22 Specification section 1800 1.8.4.5 – Emergency egress/safety SS ladders to the floating docks. Please clarify what floating docks?

There are no floating docks. See Amendment 0009

208 2/4/22 Section 18000 Paragraph 1.16.15.2 – The RFP state “Provide two 4-inch reinforced thermosetting resin conduit (RTRC) for telecommunications OSP cabling from the Pier November Telecom Room to each planned cutter shore tie location including the bulkhead mooring location.” Please provide the location of the bulkhead mooring.

See amendment regarding bulkhead mooring.

See Amend 0006, Item 7.

214 2/4/22 After contacting Dominion Power for the electrical service for the new electrical shelter at Pier November it has been discussed that the USCG Base will require a new primary substation to be located on the Base.

Please confirm that the cost and project scope for a new utility substation is not part of this scope of work and provided directly by Dominion Power? If it is determined that the contractor is to provide this Scope of Work, please provide a allowance for the Contractor to include since Dominion Power will not be able to provide pricing until the design is complete. This substation will be very expensive.

A substation shall not be required. See amendment.

221 2/4/22 Can USCG provide the CADD files of the RFP drawings?

See Amendment #0003.

222 2/4/22 1800 1.19.11 states to dispose dredged materials at an approved disposal area. Can the USCG provide the approved disposal locations for the dredging spoils?

The Contractor will be required to coordinate disposal locations and restrictions with the USACE during the permitting and consultation process described in Sec 01800

1.18.2. Upland disposal at a local

USACE-managed cell would be a common means of disposal, but this cannot be guaranteed by the USCG.

223 2/4/22 Per the Task Order Announcement, Option #1 states that the contractor to provide additional fenders to support double berthing NSCs. Per section 1.8.5.9.1 of the Request For Proposal, “The Contractor is not responsible for supplying marine fenders between nested NSCs.”

Please confirm we are not to provide the fenders for the nested NSC in Option 1.

Confirmed, fenders to support double berthing are not a part of option #1. See Amendment 0009.

230 2/4/22 Specification section 1800 1.1, 1.1.1 Project Description states “to homeport and berth 5 NSCs at Pier November…..” Please confirm that the base bid scope is to homeport and berth only 4 NSCs and option 1 includes a 5th NSC nested berthing.

Confirmed.

236 2/4/22 1800 1.8.2.2.4 Cast-in Place Concrete states all reinforcing shall be epoxy coated. Please confirm that landside site concrete pads, concrete sidewalks and concrete paving does not require epoxy coated reinforcing?

RFP 01800 1.8.2.2.and sub-paragraphs are applicable to waterfront systems.

237 2/4/22 1800 1.8.2.2.5 Waterfront Hardware states to provide most corrosive resistant materials for waterfront and provides a preferred order of preference. Please confirm it is up to the DOR to select the type of material that is practical for the application.

RFP 01800-1.8.2.2.5 is specific and clear that this is up to the DOR.

238 2/4/22 1800 1.8.2.2.5 Associated Building Hardware states to provide most

RFP 01800-1.8.2.2.5 is specific and clear that this is up to the DOR.

corrosive resistant materials for buildings and provides a preferred order of preference. Please confirm it is up to the DOR to select the type of material that is practical for the application.

240 2/4/22 Telecom spec 1800 1.16.9 requests a sprinkler system with water troughs to keep pipes from leaking on equipment. Please confirm no sprinkler system is required in the electrical / telecom shelter?

No sprinkler system is required in Electrical Equipment Shelter

241 2/4/22 1800 1.12.1.7 requests an exhaust system for the battery storage area.

Please confirm this is not required.

Exhaust system for the Equipment Shelter is required since it will be similar to a mechanical room with a centralized compressed air system.

242 2/4/22 Please confirm that no eye wash system, floor drains or any other plumbing is required for the electrical / telecom structure or storage building?

The Electric equipment shelter will require a centralized compressed air system. No eye wash system, floor drains, or any other plumbing is required.

244 2/4/22 1.16.21.1.1 states to arrange for OneNet equipment moves including router installation, coordinating with C5ISC-ISD-PSB and Base Miami C5I Department. Order new OneNet circuit and disconnect old, coordinating with Base Miami. Please clarify this scope confirming if the Contractor is to travel to Base Miami disconnect equipment and bring back for the Pier Papa project to install.

Please specify equipment being relocated and existing Base Miami telecom room details of where this equipment is located – please define scope in order to price

See Amendment 0009

245 2/4/22 1800 1.16.21.1.2 states to initiate order for the new OneNet circuit and disconnect old. Confirm if this work is by the Contractor?

See Amendment 0009

251 2/4/22 Please confirm that the bulkhead mooring location that is referred to in some areas of the SOW has been

There is no bulkhead mooring locations anymore ... this is left over from the previous WLB bulkhead removed as a project requirement.

Bulkhead mooring cannot be found on the RFP drawings.

mooring plan that was removed. See Amendment 0006, Item # 7.

258 2/4/22 Please provide a cross-section showing the required dredge depth at the bulkhead, any payable over depth allowed at the bulkhead, and how these depths transition to the contract dredge depth of -30 MLLW plus 2 feet of payable over depth dredging totaling -32 MLLW.

A cross-section will not be provided.

262 2/4/22 We contacted Dominion regarding the primary service to the project and were not able to obtain any project specific fees or schedule from Dominion. Please provide an allowance to carry for bidding purposes until this cost can be established after award – it will require USCG input since the Government is the property owner

See amended Price Proposal Form.

263 2/4/22 Due to previous experience on FLETC base, there are a significant amount of unknown utilities/structures underground due to the history of the base. Per Section 01800 paragraph

1.16.15.1.1 the outside plant will need to be encased in concrete.

Please confirm if the contractor will be allowed to directional bore the telecom pathways from Papa to the new work at Pier November and Pier Mike? This will allow flexibility when encountering unknown utilities and significantly reduce the interruptions at Pier Papa when installing the conduit.

Concrete encasement of conduit is required where vehicular traffic is expected above. Direction bore in areas where vehicular traffic is not above is permitted.

1.16.15.1.1 is clear about where conduit needs to be encased, which is under roadways. Contractor has the flexibility to use whatever method they deem necessary in other areas.

264 2/4/22 Please confirm that per RFP section 01800-1.11.3, splash blocks on grade are an acceptable condensate disposal location.

Confirmed

265 2/4/22 The RFP does not indicate the need for emergency eyewashes or emergency showers. Please confirm

Confirmed.

emergency eyewashes and/or showers are not required in the new electrical equipment shelter or the new modular metal storage building.

266 2/4/22 Please confirm hose bibbs are not required on the interior or exterior of the new electrical equipment shelter.

No Hose bibbs are required.

267 2/4/22 Please confirm hose bibbs are not required on the interior or exterior of the new modular metal storage building.

No Hose bibbs are required.

268 2/4/22 Please confirm floor drains are not required in the new electrical equipment shelter.

No floor drains are required.

However, DB contractors design shall incorporate proper condensate removal from central air compressor system.

269 2/4/22 Please confirm floor drains are not required in the new modular metal storage building.

No floor drains are required.

272 2/4/22 RFP attachment H shows many existing utilities in poor condition.

Please confirm the contractor’s scope for this project only includes tie-in to existing utilities and no repairs to existing utilities are required. If repairs are needed, please quantify or provide an allowance to cover since this scope is unknown.

Confirmed. Existing utilities to be tied into are privately owned.

276 2/4/22 The sheets within the RFP drawing set showing the dredging limits do not define how the side slope is to transition from the dredging depth of -30’ MLLW plus 2’ of overdepth to the existing bottom depths surrounding the area. Section 1.19.7.4 Side Slopes do no indicate any slopes either.

Please provide the slope detail for these transitions as well as transition along the bulkhead outside the dredging zone near Pier Mike. Also please confirm that the total dredge quantity of 385,449 cubic yards includes the material in these slopes.

Drawings revised for clarity. Dredge limits shown do not include side slopes. Total dredge quantity noted includes the side slopes.

279 2/4/22 There are no requirements in the TOA for a stormwater management system for the new Pier November.

Please confirm a pier SWM system is not required.

A SWM system for the pier is not anticipated; however, the Contractor must comply with RFP Specification Section 01800, Paragraphs 1.4.3 and 1.18.

281 2/4/22 Provided that all of the environmental best management practices from the PEA are followed and the contractor complies with all requirements in applicable environmental permits, does the USCG agree that the in-water work will be able to proceed during all months of the year or will we need to comply with the in-water moratorium from April through September?

See response to RFI 3, in Amendment 0003

285 2/4/22

We have attempted to contact Charleston Water Systems to obtain any connections fees for this project however they have been unresponsive. Please provide an allowance for us to carry since this cost cannot be obtained.

See amendment 0007, Item #10.

288 2/4/22

Please confirm that the blown out bulkhead should be replaced in line with the existing bulkhead?

See Sheet C-119, New Work Note 1.

289 2/4/22

Typical dredging operations is a 24/7 activity. Please confirm dredging operations can occur 24 hours a day, seven days a week until complete..

See response to RFI 21 in amendment 0007

2/4/22

Typical dredging operations is a 24/7 activity. Please confirm dredging operations can occur 24 hours a day, seven days a week until complete..

See response to RFI 21 in Amendment 0007

300 2/4/22

Are there any USCG restrictions to elevating the new Pier November deck elevation above the existing Pier November deck elevation?

See item # 2 in Amendment 0006.

306 2/4/22

Section 01800 paragraph 1.4.5 Utility Meters

New water meters serving cutter shore ties and specialized uses such as piers shall be installed with wireless metering devices. All required appurtenances shall be

Yes.

compatible with the Data Acquisition Server (DAS) Model A8812, manufactured by Obvius, LLC, which is planned for future installation.” Charleston Water System (CWS) owns the potable water distribution system and will own and install the water meter required to provide cutter shore ties services. CWS does install wireless meters; however, their wireless devices are compatible with their meter reading system and may not be compatible with the system stated above. Does the Government want an additional meter, meeting the requirements above, installed on the government side of the CWS meter?

307 2/4/22

Reference section 01800 paragraph

1.10 Fire Protection

Reference section 01800 paragraph 1.10 Fire Protection.

What are the Fire Protection requirements for the NSCs? We assume they have fire water pumps. Are those pumps supplied by seawater only or can they be supplied by a pressurized shore connection? What are the fire protection demand loads per ship? gpm @ psi? How many shore water connections are required?

On-board fire pumps will not connect to shore systems. There is a Memorandum of Agreement (MOA) between the Coast Guard and North Charleston Fire Department (NFCD).

NFCD will connect to hydrants along Hobson Avenue and each of their trucks carry 1,200 feet of hose.

(They will not draft from the river unless it is a matter of last resort.)

NFCD also has a marine vessel that moors nearby and could be at the site within approximately five minutes.

308 2/4/22

Section 01800 paragraph 1.4.5 Utility Meters

New water meters serving cutter shore ties and specialized uses such as piers shall be installed with wireless metering devices. All required appurtenances shall be compatible with the Data

Yes.

Acquisition Server (DAS) Model A8812, manufactured by Obvius, LLC, which is planned for future installation.” Charleston Water System (CWS) owns the potable water distribution system and will own and install the water meter required to provide cutter shore ties services. CWS does install wireless meters; however, their wireless devices are compatible with their meter reading system and may not be compatible with the system stated above. Does the Government want an additional meter, meeting the requirements above, installed on the government side of the CWS meter?

315 2/4/22 Please consider adding a unit price pay item for contaminated soil removal.

See amendment. References to removal of 1,500 CY of contaminated soil have been removed. Additional references have been provided in Attachment N that document that petroleum contamination in this location has been remediated, to include the capping of underground piping.

See Amendment 0006 and updated Attachment N.

See Amendment 009 for revised guidance on costs for soil and sediment disposal.

316 2/4/22 Please consider revising the RFP existing condition drawings to include the fuel pipelines (5 ea - 6", 8", 12" and 18")so all teams are aware of their current location in the collapsed bulkhead areas.

See amendment. References to removal of 1,500 CY of contaminated soil has been removed. Additional references have been provided in Attachment N that document that petroleum contamination in this location has been remediated, to include the capping of underground piping.

See Amend 0006 Item #4 addresses this RFI.

See Amendment 009 for revised guidance on costs for soil and sediment disposal.

321 2/4/22

Will USCG allow teams on base, water side, in order to perform a hydrographic/marine survey of the dredge and bulkhead location?

Yes

334 2/21/22

Amendment 5

Please reference the updated price proposal forms provided in Amendment 0005 Line 2, Construction (dredging). Please confirm this item is strictly for the quantity of 385,449 cubic yards provided in 01800_1.19.7.2.

Confirmed. The dredging line items on the Price Proposal form is for the total quantity indicated in the RFP.

The quantity needs to be associated with the separate activities.

337 2/22/22 Amendment #5, RFI response #84, clarifies that the "Cutter Support Building" is the metal storage building specified in RFP section 01800 1.17, FFE. Will the option price #1 to add accommodations for a 5th NSC require the specified 30'x25' metal storage building square footage to increase? If so, what is the square footage increase required for Bid Option 0001.

No

341 2/22/22 Please provide bilge water requirement at NSC utility mound including connection type, size, flow rate, and location relative to NSC so the bildge water can be priced.

See Amendment 0006.

347 2/22/22 Amendment 005 adds a compressed air system in the Electrical Shelter.

Please confirm we are to increase the size of the shelter to house the

Electric Shelter shall be sized to house the compressed air system which includes manufacturer compressed air and it shall meet the Flood Class 4 requirements.

clearances for maintenance requirements.

351 2/22/22 Amendment 005, RFI 71, 138, 286, Section 1800 1.11 Plumbing section line 6 states compressed air to serve Pier Papa. Should this be Pier November?

Yes, See Amend 0009

353 2/22/22 Amendment 0005, RFI 54 response states the Contractor is to determine the dredge contaminated soils from the Attachment E / TOA documents and is ultimately responsible for additional sampling if required to meet the permit application and/or segregation of materials. This contaminated soil assessment cannot accurately be made from the information provided. It is the Government's responsibility to provide adequate information for the Contractor to properly price the TOA.

It is unreasonable to make the Contractor carry costs for an unknown condition. For bidding purposes, please provide quantities and locations for contaminated soils to be removed, or provide an allowance to carry, or direct us to assume no underwater soil contamination exists. Please omit the response to RFI 54 since the Contractor cannot price and after award, unknown condition.

See Amendment 0009 for revised guidance and bidding instructions related to contaminated soils and dredged material

355 2/22/22 Amendment 005 RFI response 152 states the contractor is responsible for underground storage tanks per the 2020 EDDA. The EDDA does not address UST specifically whether they contain fuel or if any of the tanks have leaked(Contaminated soil) for bidding purposes please confirm that the contractor should assume all UST are empty and there are no contaminated soils present.

See Amendment 006 for revised guidance and bidding instructions related to the UST.

361 2/4/22 13

01110

1.13

Can removal of the submerged equipment be undertaken prior to dredging or demolition work?

Yes, See RFI question #6 in Amendment 0003.

363 2/4/22 12 of 209

1.10

The RFP references coordinating new utility services with utility providers and also notes that connections to Government utility services (water, sewer, electrical) will be at no charge to the contractor. Please define which utility services are available from the Government and which are required to be provided by utility providers.

See Amendment 0007.

364 2/4/22 Please confirm that Contractor’s obligation to provide new utility services is limited to the capacity requirements associated work defined in this RPF and does not include any capacity requirements for future projects.

Confirmed, the contractor is not required to provide utility services to accommodate future projects.

369 2/4/22 13

1.13

Please confirm that dredging is not a prerequisite to demolition.

Yes, See RFI question #6 in Amendment 0003

372 2/4/22 146

1.18.2.1

Section 1.18.2.1 lists permits that have been initiated by the Government. Please provide any additional permits initiated by the Government as well as the status of these permits so that the Contractor can more accurately estimate the time needed for permit approval in the schedule.

No additional environmental permits have been initiated or acquired by the Government. The majority of permitting and consultation efforts will be initiated by the Contractor as specified in 01800 1.18.2

373 2/4/22 General

Please indicate location and specifications of existing equipment to be removed from the water.

General locations are as indicated in the RFP. Specific locations are unknown.

374 2/4/22 127 of

1.13.14.1

There are numerous references to testing a generator. Please confirm a generator is not required for this project.

Correct. See Amendment 0009 for corrected language.

376 2/4/22 124 of

01110

1.13.9.2.1.3

Please confirm if the 20 foot-candle minimum requirement along the entire length of pier and surrounding areas should be in lux or fc? IES Recommended Practice is 3.5 fc average and 1.0 fc minimum, with 0.5 fc minimum at wharf edge, per RP-40- 19 Recommended Practice: Lighting Port Terminals.

The FC requirements are in section 1.13.9.2.1.3

378 2/4/22 118 of

01110 1.13.1

Please confirm the local electrical utility. Section conflicts with paragraph below and per section 01110, 1.10 New Utility Services.

See amendment 0009 for corrected information.

388 2/4/22 84 of 209

RFP

1.4.3

What are the east/west limits of grading between the bulkhead/pier and S. Hobson Ave?

Revised New Work Note 1 on RFP Drawings. See amendment 0009

389 2/4/22 1 of 1

RFP

Storm Utility Condition Report

Is there a map that correlates to the Base Charleston Utility Equipment Defects_Stormwater Lines report?

There are numerous pipes that need repair/replacement but it's not possible to determine where they are located.

Yes. Map will be added to Attachment H. See amendment