Construct Sidewalks at Rocky Mountain Laboratory, Hamilton, Montana

Closed Solicitation Posted

Solicitation number
09-SOL-00011
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Rocky Mountain Laboratory Hamilton, Montana 59840, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Contractor to construct approximately 3,200 S.F. of 4" thick concrete sidewalk with base, and approximately 2,700 S.F. of 6" thick concrete sidewalk with base. Completion of work is required within 60 calendar days of NTP. The government intends to issue solicitation with specifications and drawings approximately July 29, 2009 by posting to this web site. Solicitations will not be mailed or provided in any other way other than this web site

(http:///www.fbo.gov) The magnitude for this project is estimated to be between $25,000 and $100,000.

Update #1 ·

Contractor to construct approximately 3,200 S.F. of 4" thick concrete sidewalk with base, and approximately 2,700 S.F. of 6" thick concrete sidewalk with base. Completion of work is required within 30 calendar days of NTP. The government intends to issue solicitation with specifications and drawings approximately July 29, 2009 by posting to this web site. Solicitations will not be mailed or provided in any other way other than this web site

(http:///www.fbo.gov) The magnitude for this project is estimated to be between $25,000 and $100,000.

Files

File Type Posted
01700 Execution Requirements.doc DOC document
RML Interim Sidewalks Drawings.pdf PDF
01305 SECURITY.doc DOC document
SF 30 Amendment 1.pdf PDF
RML Interim Sidewalks —
01700 Execution Requirements 100 —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
2009.07.28 Wage Determination.doc DOC document
01500 TEMP FACILITIES CONTROL 100.doc DOC document
01330 SUBMTL PROCEDURES 100.doc DOC document
SF 25 Performance Bond.pdf PDF
01100 Summary 100 —
Interim Sidewalks Specifications.pdf PDF
Specification Index 1 —
01500 TEMP FACILITIES CONTROL 100.doc DOC document
01310 Proj Mngmt Coor 100.doc DOC document
01320 Const Prog Doc 100.doc DOC document
SF 24 Bid Bond.pdf PDF
01420 References 100 —
01140 Work Restrictions 100.doc DOC document
01700 Execution Requirements 100 —
SF 25B Bond continuation form.pdf PDF
SF 1442 Solicitation.pdf PDF
01270 Unit Prices 100 —
01400 Quality Requirements 100 —
RML Interim Sidewalks —
01731 Cutting Patching 100 —
SF25A Payment Bond.pdf PDF
Section 02751 - Cement Concrete Pavement rev 5-09.doc DOC document
Section 02300 - Earthwork —
SPEC COVER —
01770 ADG CLOSE OUT PROCEDURES 100.doc DOC document
Show all 35

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors