SECTION 02300 - EARTHWORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Sections A through M of the Contract and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Preparing subgrades for slabs-on-grade, walks, pavements, lawns, and plantings.
2. Drainage course for slabs-on-grade.
3. Subbase course for concrete walks and pavements.
4. Base course for asphalt paving.
5. Excavating and backfilling trenches.
6. Excavating and backfilling trenches for buried mechanical and electrical utilities and pits for buried utility structures.
B. Related Sections include the following:
1. Division 1 Section "Construction Facilities and Temporary Controls."
2. Division 2 Section "Excavation Support and Protection."
3. Division 2 Section "Landscaping" for finish grading, including placing and preparing topsoil for lawns and plantings.
1.3 DEFINITIONS
A. Backfill: Soil materials used to fill an excavation.
1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
B. Base Course: Layer placed between the subbase course and asphalt paving.
C. Bedding Course: Layer placed over the excavated subgrade in a trench before laying pipe.
D. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.
E. Drainage Course: Layer supporting slab-on-grade used to minimize capillary flow of pore water.
F. Excavation: Removal of material encountered above subgrade elevations.
1. Additional Excavation: Excavation below subgrade elevations as directed by Contracting Officer. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.
2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated dimensions without direction by Contracting Officer. Unauthorized excavation, as well as remedial work directed by Contracting Officer, shall be corrected without additional compensation.
G. Fill: Soil materials used to raise existing grades.
H. Rock: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material 3/4 cu. yd. (0.57 cu. m) or more in volume that when tested by an independent geotechnical testing agency, according to ASTM D 1586, exceeds a standard penetration resistance of 100 blows/2 inches (97 blows/50 mm).
I. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.
J. Base Course: Layer placed between the subgrade and cushion course for asphalt paving, concrete pavement or walk.
K. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below base course, drainage fill, or topsoil materials.
L. Utilities include on-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.
1.4 SUBMITTALS
A. Product Data: For the following:
1. Each type of plastic warning tape.
B. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated:
1. Classification according to ASTM D 2487 of each on-site or borrow soil material proposed for fill and backfill.
2. Laboratory compaction curve according to ASTM D 698 for each on-site or borrow soil material proposed for fill and backfill.
1.5 QUALITY ASSURANCE
A. Geotechnical Testing Agency Qualifications: An independent testing agency qualified according to ASTM E 329 to conduct soil materials and rock-definition testing, as documented according to ASTM D 3740 and ASTM E 548.
B. It is understood that the Contractor will engage a Geotechnical engineer to perform testing as required for means and methods control of workmanship and to insure compliance with Project requirement.
1.6 PROJECT CONDITIONS
A. Project Site information. No Geotechnical reports have been prepared for these Projects. Geotechnical reports have been prepared for various other Projects within the RML campus and they can be reviewed by the contractor by contacting the Contracting Officer. These reports are not part of the Contract Documents. The opinions expressed in these reports are those of the Geotechnical Engineer and represent interpretations of the subsoil conditions, tests, and results of analyses conducted by the Geotechnical Engineer. The Government will not be responsible for interpretations or conclusions drawn from this data by the Contractor.
1. The Contractor may make additional test borings and conduct other exploratory operations as necessary.
B. Existing Utilities: Do not interrupt utilities serving facilities occupied by Government or others unless permitted in writing by Contracting Officer and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than five days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer's written permission.
3. Contact utility-locator service for area where Project is located before excavating.
C. Demolish and completely remove from site existing underground utilities indicated to be removed. Coordinate with utility companies to shut off services if lines are active.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.
B.
Satisfactory Soils: ASTM D 2487 soil classification groups GW, GP, GM, SW and SP or a combination of these group symbols; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.
1.
Structures:
Identified at Site: SP, GP, GM as described in previous project Soils Reports
Not Identified at Site: GW, SW
2.
Sitework:
Identified at Site: SP, GP‑GM, SP
Not Identified at Site: GW, SW
C.
Unsatisfactory Soils: Soil materials complying with ASTM D 2487 soil classification groups as listed below.
1.
Structures:
Identified at Site: OL, ML, SM
Not Identified at Site: MH, CH, OH, PT, CL, GC, SC, SM
2.
Sitework:
Identified at Site: OL, ML, SM
Not Identified at Site: MH, CH, OH, PT, CL, GC, SC, SM
3.
Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.
D.
Select Structural Fill Materials
1.
Satisfactory soil materials shall be primarily a sandy gravel with appreciable fines (GM‑GP) meeting the following general requirements:
Screen or Sieve Size Percent Passing By Weight
3.0 inches
No. 200 12 maximum
Maximum Plasticity Index = 6
F.
Backfill and Fill
1.
Satisfactory soil materials shall be primarily a granular material (SP, SM, GP, GM, GM‑GP) meeting the following general requirements:
Screen or Sieve Size Percent Passing By Weight
3.0 inches
No. 200 12 maximum
Maximum Plasticity Index = 6
G.
Base Course /Cushion Course for Asphaltic Pavements
1.
Satisfactory soil materials free of clay, rock or gravel larger than 2 inches in any dimension, debris, waste, frozen materials, vegetation and other deleterious matter, and meeting the following requirements:
Montana Highway Department Crushed Base Course Type A ‑ Grade 5 or better.
H.
Leveling/Cushion Course for Exterior Concrete Slabs and Walks, Roadways and Parking Areas
1.
Satisfactory soil materials free of clay, rock or gravel larger than 3/4 inches in any dimension, debris, waste, frozen materials, vegetation and other deleterious matter, and meeting the following requirements:
Montana Highway Department Crushed Top Surfacing Type A ‑ Grade 2 or better.
I.
Lean Concrete
1.
A flowable fill comprised of low strength concrete with a minimum of 1/2 sack of cement per cubic yard.
J.
Bedding Material
1.
Unless otherwise shown on the drawings, pipe bedding material shall be placed in a thickness equal to ¼ x pipe O.D. below the pipe (4 inches minimum) to 6 inches above the pipe. Bedding material shall be clean, non-cohesive, natural, unwashed grave, sand or crushed hard stone graded as follows:
SIEVE SIZE
PERCENT PASSING
1”
#4
40 – 70
#200
Less than 10 except where groundwater is encountered at the trench bottom, in which case embedment material shall be washed, crushed rock passing a 1-inch screen. Native trench material shall not be used for pipe bedding material. In rock areas the minimum bedding below the pipe shall be 6”.
All pipe bedding material shall be imported, meeting the above specifications. Use of existing trench materials shall not be allowed.
Bedding material shall be compacted to 95% of theoretical maximum proctor density as determined by AASHTO T-99.
2.2 ACCESSORIES
A. Detectable Warning Tape: Acid- and alkali-resistant polyethylene film warning tape manufactured for marking and identifying underground utilities, minimum 6 inches (150 mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches (750 mm) deep; colored as follows:
1. Red: Electric.
2. Yellow: Gas, oil, steam, and dangerous materials.
3. Orange: Telephone and other communications.
4. Blue: Water systems.
5. Green: Sewer systems.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.
B. Protect subgrades and foundation soils against freezing temperatures or frost. Provide protective insulating materials as necessary.
C. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.
3.2 DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.
B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.
1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.
2. Install a dewatering system to keep subgrades dry and convey ground water away from excavations. Maintain until dewatering is no longer required.
3.3 EXPLOSIVES
A. Explosives: Do not use explosives.
3.4 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavation to subgrade elevations regardless of the character of surface and subsurface conditions encountered, including rock, soil materials, and obstructions.
1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.
3.5 EXCAVATION FOR STRUCTURES
A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch (25 mm). Extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.
1. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.
3.6 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated cross sections, elevations, and grades.
3.7 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.
1. Beyond building perimeter, excavate trenches to allow installation of top of pipe below frost line.
B. Excavate trenches to uniform widths to provide a working clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit, unless otherwise indicated.
1. Clearance: 12 inches on each side of pipe or conduit.
C. Trench Bottoms: Excavate trenches 4 inches deeper than bottom of pipe elevation to allow for bedding course. Hand excavate for bell of pipe.
1. Excavate trenches 6 inches deeper than elevation required in rock or other unyielding bearing material to allow for bedding course.
3.8 APPROVAL OF SUBGRADE
A. Notify Contracting Officer when excavations have reached required subgrade.
B. If Contracting Officer determines that unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed.
1. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.
C. Proof roll subgrade with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof roll wet or saturated subgrades.
D. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Contracting Officer.
3.9 UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill may be used when approved by Contracting Officer.
1. Fill unauthorized excavations under other construction or utility pipe as directed by Contracting Officer.
3.10 STORAGE OF SOIL MATERIALS
A. Stockpile borrow materials and satisfactory excavated soil materials. Stockpile soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.
3.11 BACKFILL
A. Place and compact backfill in excavations promptly, but not before completing the following:
1. Construction below finish grade including, where applicable, dampproofing, waterproofing, and perimeter insulation.
2. Surveying locations of underground utilities for record documents.
3. Inspecting and testing underground utilities.
4. Removing concrete formwork.
5. Removing trash and debris.
6. Removing temporary shoring and bracing, and sheeting.
7. Installing permanent or temporary horizontal bracing on horizontally supported walls.
3.12 UTILITY TRENCH BACKFILL
A. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.
B. Backfill trenches excavated under footings and within 18 inches of bottom of footings; fill with concrete to elevation of bottom of footings.
C. Provide 4-inch- thick, concrete-base slab support for piping or conduit less than 30 inches below surface of roadways. After installing and testing, completely encase piping or conduit in a minimum of 4 inches of concrete before backfilling or placing roadway subbase.
D. Place and compact initial backfill of subbase material, free of particles larger than 1 inch, to a height of 12 inches over the utility pipe or conduit.
1. Carefully compact material under pipe haunches and bring backfill evenly up on both sides and along the full length of utility piping or conduit to avoid damage or displacement of utility system.
E. Coordinate backfilling with utilities testing.
F. Fill voids with approved backfill materials while shoring and bracing, and as sheeting is removed.
G. Place and compact final backfill of satisfactory soil material to final subgrade.
H. Install warning tape directly above utilities, 12 inches below finished grade, except 6 inches below subgrade under pavements and slabs.
3.13 FILL
A. Preparation: Remove vegetation, topsoil, debris, unsatisfactory soil materials, obstructions, and deleterious materials from ground surface before placing fills.
B. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.
C. Place and compact fill material in layers to required elevations as follows:
1. Under grass and planted areas, use satisfactory soil material.
2. Under walks and pavements, use leveling/cushion course on acceptable native sandy gravels or structural fill.
3. Under steps and ramps, use leveling/cushion course on acceptable native sandy gravels or structural fill.
4. Under building slabs, use leveling/cushion course on acceptable native sandy gravels or structural fill.
5. Under footings and foundations, native sandy gravels or structural fill.
3.14 MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill layer before compaction to within 2 percent of optimum moisture content.
1. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice.
2. Remove and replace, or scarify and air-dry, otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.
3.15 COMPACTION OF BACKFILLS AND FILLS
A. Place backfill and fill materials in layers not more than 8 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.
B. Place backfill and fill materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.
C. Compact soil to not less than the following percentages of maximum dry unit weight according to ASTM D 698:
1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches of existing subgrade and each layer of backfill or fill material at 98 percent.
2. Under walkways, scarify and recompact top 6 inches below subgrade and compact each layer of backfill or fill material at 95 percent.
3. Under lawn or unpaved areas, scarify and recompact top 6 inches below subgrade and compact each layer of backfill or fill material at 85 percent.
3.16 GRADING
A. General: Uniformly grade areas to a smooth surface, free from irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.
1. Provide a smooth transition between adjacent existing grades and new grades.
2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.
B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances:
1. Lawn or Unpaved Areas: Plus or minus 1 inch.
2. Walks: Plus or minus 1 inch.
3. Pavements: Plus or minus 1/2 inch.
C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10-foot straightedge.
3.17 BASE COURSES
A. Under pavements and walks, place base course on prepared subgrade and as follows:
1. Place base course material over subbase.
2. Compact base courses at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 698.
3. Shape base to required crown elevations and cross-slope grades.
4. When thickness of compacted base course is 6 inches or less, place materials in a single layer.
5. When thickness of compacted base course exceeds 6 inches, place materials in equal layers, with no layer more than 6 inches thick or less than 3 inches thick when compacted.
B. Pavement Shoulders: Place shoulders along edges of base and cushion course to prevent lateral movement. Construct shoulders, at least 12 inches wide, of satisfactory soil materials and compact simultaneously with each base and cushion course layer to not less than 95 percent of maximum dry unit weight according to ASTM D 1557.
3.18 FIELD QUALITY CONTROL
A. Testing Agency: Contractor will engage a qualified independent geotechnical engineering testing agency to perform field quality-control testing.
B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earthwork only after test results for previously completed work comply with requirements.
C. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Contracting Officer.
D. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167, ASTM D 2922, and ASTM D 2937, as applicable. Tests will be performed at the following locations and frequencies:
1. Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer, at least one test for every 2000 sq. ft. or less of paved area or building slab, but in no case fewer than three tests.
2. Foundation Wall Backfill: At each compacted backfill layer, at least one test for each 100 feet or less of wall length, but no fewer than two tests.
3. Trench Backfill: At each compacted initial and final backfill layer, at least one test for each 150 feet or less of trench length, but no fewer than two tests.
E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and retest until specified compaction is obtained.
3.19 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.
B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.
1. Scarify or remove and replace soil material to depth as directed by Contracting Officer; reshape and recompact.
C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.
1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to the greatest extent possible.
3.20 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Government property.
END OF SECTION 02300
RML INTERIM SIDEWALKS ( NIH-NIAID RML ( HAMILTON, MT
EARTHWORK 02300 - 11
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .