01140 Work Restrictions 100.doc

DOC document 31 KB Posted

Attached to
Construct Sidewalks at Rocky Mountain Laboratory, Hamilton, Montana
Solicitation number
09-SOL-00011
Issued by

About this file

Attachment J-1 - file 5 Spec Section 01140

View the file

Other files

File Type Posted
01700 Execution Requirements.doc DOC document
RML Interim Sidewalks Drawings.pdf PDF
01305 SECURITY.doc DOC document
SF 30 Amendment 1.pdf PDF
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
SF 24 Bid Bond.pdf PDF
01770 ADG CLOSE OUT PROCEDURES 100.doc DOC document
Interim Sidewalks Specifications.pdf PDF
01420 References 100 —
Specification Index 1 —
01700 Execution Requirements 100 —
2009.07.28 Wage Determination.doc DOC document
01500 TEMP FACILITIES CONTROL 100.doc DOC document
SF 25B Bond continuation form.pdf PDF
SF 1442 Solicitation.pdf PDF
01330 SUBMTL PROCEDURES 100.doc DOC document
01310 Proj Mngmt Coor 100.doc DOC document
SF 25 Performance Bond.pdf PDF
01320 Const Prog Doc 100.doc DOC document
01270 Unit Prices 100 —
01400 Quality Requirements 100 —
01100 Summary 100 —
Section 02751 - Cement Concrete Pavement rev 5-09.doc DOC document
SPEC COVER —
RML Interim Sidewalks —
Section 02300 - Earthwork —
SF25A Payment Bond.pdf PDF
01731 Cutting Patching 100 —
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04-436

08-827A

SECTION 01140 - WORK RESTRICTIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including Sections A through M of the Contract and other Division 1 Specification Sections, apply to this Section.

B. Related Sections:

1. Refer to Section, “Construction Security Requirements” for security procedures.

1.2 USE OF PREMISES

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations to the areas delineated on the “Campus Staging Plan” included on Sheet A0.0.

2. Government Occupancy: Allow for Government occupancy of site.

3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

c. Keep access to the South and East sides of Building 23 clear at all times.

4. The fresh air intakes for the buildings in the Quad are on the east side of the service road between Buildings A and 5; and Buildings 13, 13B and 16. The Contractor is advised that he is required to keep traffic in this area limited to actual ongoing work. Idling of motors for inactive equipment will not be allowed.

B. Hours of work: Refer to Section H of the Contract.

1.3 SECURITY

A. All contractors, suppliers and vendors are subject to search upon entering the Rocky Mountain Laboratories Facility. This includes vehicles, packages, boxes, etc.

1. Two forms of identification will be required for all personnel.

2. A photo identity badge must be worn in plain view while on the RML grounds.

3. Visitors and those without a photo ID Badge will be escorted while on site.

4. Vendors, and suppliers must have paperwork showing what is being delivered and to whom before they will be allowed to enter the facility.

5. All construction delivery trucks must be met at the perimeter gate by an authorized Project Manager, superintendent, etc. and be escorted to their delivery site.

6. All storage units and the inside of these vehicles are subject to inspection.

B. Security measures may be lessened or heightened as National Alert Levels change.

1.4 OCCUPANCY REQUIREMENTS

A. Full Government Occupancy: Government will occupy site and existing building during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's operations.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01140