Specification Index 1

45 KB Posted

Attached to
Construct Sidewalks at Rocky Mountain Laboratory, Hamilton, Montana
Solicitation number
09-SOL-00011
Issued by

About this file

Attachment J-1 - file 3 Spec Index

Text of this file

08-827A

PROJECT MANUAL INDEX

Construction Documents

REFERENCE INFORMATION

NONE

TECHNICAL SPECIFICATIONS

DIVISION 1 GENERAL REQUIREMENTS

SECTION 01100

Summary

SECTION 01140

Work Restrictions

SECTION 01270

Unit Prices

SECTION 01305

Construction Security Requirements

SECTION 01310

Project Management and Coordination

SECTION 01320

Construction Progress Documentation

SECTION 01330

Submittal Procedures

SECTION 01400

Quality Requirements

SECTION 01420

References

SECTION 01500

Temporary Facilities and Controls

SECTION 01600

Product Requirements

SECTION 01700

Execution Requirements

SECTION 01731

Cutting and Patching

SECTION 01770

Closeout Procedures

DIVISION 2 ‑ SITE WORK

SECTION 02300

Earthwork

SECTION 02751

Cement Concrete Pavement

DIVISION 3 ‑ CONCRETE

NONE

DIVISION 4 ‑ MASONRY

NONE

DIVISION 5 – METALS

NONE

DIVISION 6 ‑ WOOD AND PLASTICS

NONE

DIVISION 7 ‑ THERMAL AND MOISTURE PROTECTION

NONE

DIVISION 8 ‑ DOORS AND WINDOWS

NONE

DIVISION 9 ‑ FINISHES

NONE

DIVISION 10 ‑ SPECIALTIES

NONE

DIVISION 11 ‑ EQUIPMENT

NONE

DIVISION 12 ‑ FURNISHINGS

NONE

DIVISION 13 ‑ SPECIAL CONSTRUCTION

NONE

DIVISION 14 ‑ CONVEYING SYSTEMS

NONE

DIVISION 15 - MECHANICAL

NONE

DIVISION 16 - ELECTRICAL

NONE

DIVISION 17 – LOW VOLTAGE WORK

NONE

END OF INDEX

RML INTERIM SIDEWALKS ( NIH-NIAID RML ( HAMILTON, MT

Project Manual Index p. 2

Other files

File Type Posted
01700 Execution Requirements.doc DOC document
RML Interim Sidewalks Drawings.pdf PDF
01305 SECURITY.doc DOC document
SF 30 Amendment 1.pdf PDF
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
SF 24 Bid Bond.pdf PDF
01770 ADG CLOSE OUT PROCEDURES 100.doc DOC document
Interim Sidewalks Specifications.pdf PDF
01420 References 100 —
01140 Work Restrictions 100.doc DOC document
01700 Execution Requirements 100 —
2009.07.28 Wage Determination.doc DOC document
01500 TEMP FACILITIES CONTROL 100.doc DOC document
SF 25B Bond continuation form.pdf PDF
SF 1442 Solicitation.pdf PDF
01330 SUBMTL PROCEDURES 100.doc DOC document
01310 Proj Mngmt Coor 100.doc DOC document
SF 25 Performance Bond.pdf PDF
01320 Const Prog Doc 100.doc DOC document
01270 Unit Prices 100 —
01400 Quality Requirements 100 —
01100 Summary 100 —
Section 02751 - Cement Concrete Pavement rev 5-09.doc DOC document
SPEC COVER —
RML Interim Sidewalks —
Section 02300 - Earthwork —
SF25A Payment Bond.pdf PDF
01731 Cutting Patching 100 —
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .