2009.07.28 Wage Determination.doc

DOC document 53 KB Posted

Attached to
Construct Sidewalks at Rocky Mountain Laboratory, Hamilton, Montana
Solicitation number
09-SOL-00011
Issued by

About this file

Attachment J-3 Wage Determination

View the file

Other files

File Type Posted
01700 Execution Requirements.doc DOC document
RML Interim Sidewalks Drawings.pdf PDF
01305 SECURITY.doc DOC document
SF 30 Amendment 1.pdf PDF
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
01700 Execution Requirements 100 —
RML Interim Sidewalks —
SF 24 Bid Bond.pdf PDF
01770 ADG CLOSE OUT PROCEDURES 100.doc DOC document
Interim Sidewalks Specifications.pdf PDF
01420 References 100 —
Specification Index 1 —
01140 Work Restrictions 100.doc DOC document
01700 Execution Requirements 100 —
01500 TEMP FACILITIES CONTROL 100.doc DOC document
SF 25B Bond continuation form.pdf PDF
SF 1442 Solicitation.pdf PDF
01330 SUBMTL PROCEDURES 100.doc DOC document
01310 Proj Mngmt Coor 100.doc DOC document
SF 25 Performance Bond.pdf PDF
01320 Const Prog Doc 100.doc DOC document
01270 Unit Prices 100 —
01400 Quality Requirements 100 —
01100 Summary 100 —
Section 02751 - Cement Concrete Pavement rev 5-09.doc DOC document
SPEC COVER —
RML Interim Sidewalks —
Section 02300 - Earthwork —
SF25A Payment Bond.pdf PDF
01731 Cutting Patching 100 —
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: MT080021 07/24/2009 MT21

Superseded General Decision Number: MT20070021

State: Montana

Construction Type: Residential

Counties: Beaverhead and Ravalli Counties in Montana.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 07/24/2009

* SUMT1992-022 06/26/1992

Rates Fringes

BRICKLAYER.......................$ 10.50

CARPENTER........................$ 7.91 2.22

CEMENT MASON/CONCRETE FINISHER...$ 8.95 .75

ELECTRICIAN......................$ 9.90 1.5%+.85

IRONWORKER.......................$ 10.11 1.60

LABORER..........................$ 7.25 1.68

Painters:

Brush.......................$ 7.60 .35

Spray.......................$ 10.40 .35

PLASTERER........................$ 8.95 .75

PLUMBER..........................$ 10.65 1.25

Power Equipment Operator

Forklift....................$ 9.17 1.30

Rubber tire Front End

Loader

1 cu yd and under..........$ 9.07 1.30

Over 1 cu yd to 3 cu yd....$ 9.36 1.30

Tractor w/o attachments.....$ 9.36 1.30

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 7.63 1.65

Sheet metal worker...............$ 9.15 1.79

Truck drivers:

Flat Truck:

over 3 tons................$ 8.36 1.10 up to 3 tons...............$ 8.11 1.10

Pickup......................$ 8.11 1.10

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION