CGC walnut (WLB 205) FY12 drydocking and repairs
Award Notice Posted
- Solicitation number
- HSCG85-12-R-P45059
- Agency
-
Coast Guard
Department of Homeland Security
- Awarded
- to Bay Ship & Yacht Co
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- HSCG85-12-C-P45059 Federal contract award
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- Not on record
- Place of performance
- Contractor's facility OR Pearl Harbor Naval Shipyard, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Addl award synopsis since posting of 1/12/12 did not post properly.
Update #1 ·
The U.S. Coast Guard, Surface Force Logistics Command, IBCT, C&P2 will be issuing a solicitation for the FY12 Drydocking and Repairs of CGC WALNUT (WLB-205) whose home port is Base Support Unit Honolulu, HI. The eventual contract will be performed at EITHER the contractor's certified drydock facility OR at Pearl Harbor Naval Shipyard's graving dock facility. This procurement is a total small business set-side for all 336611 North America Industry Classification System code contractors. The period of performance will begin on 14 Mar 12 and complete 23 May 12. Only one contract will be awarded for this procurement. Foreseeable costs will be included in the price evaluation of offers, for both places of performance. This procurement is not geographically restricted. The proposed work items include but are not limited to:
Hull Plating, U/W Body, Inspect
Hull Plating (U/W Body), Ultrasonic Testing
Appendages (U/W), Leak Test
Appendages (U/W) - Internal, Preserve
Voids (Non-Accessible), Leak Test
Chain Lockers, Inspect
Voids (Non-Accessible), Preserve Internal Surfaces
Propulsion Shafting Remove, Inspect, and Reinstall
Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal
Propulsion Shaft Bearings (External), Check Clearances
Propulsion Tail Shaft Sleeve, Skim Cut
Propulsion Shaft Bearing, Stave Renewal
Controllable Pitch Propeller, System Maintenance
Controllable Pitch Propeller, Hub General Maintenance
Controllable Pitch Propellers, Clean and Inspect
Controllable Pitch Propeller Hub, Remove and Reinstall
Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean
Circuit Breakers (60HZ), Inspect and Test
Fathometer Transducer, General Maintenance
Fwd Scan Sonar Transducer, General Maintenance
Vent Ducts (Engine and Motor Room All), Commercial Cleaning
Vent Ducts (Galley and Pantry Room All), Commercial Cleaning
Vent Ducts (Laundry Exhaust), Commercial Cleaning
Vent Ducts (All Other), Commercial Cleaning
Compressed Air Receivers, Clean, Inspect, and Test
Rudder Stock Bearings, Check Clearances
Rudder, Inspect and Repair
Pad Eyes, Inspect and Test
Anchor Windlass, Overhaul (Level 2)
Buoy and Cargo Handling Crane Wire Rope, Renew
U/W Body, Preserve "Partial - Condition A "
U/W Body, Preserve "Partial - Condition B"
U/W Body, Preserve "Partial - Condition C "
Cathodic Protection / Zincs, Renew
Impressed Current Cathodic Protection System, Inspect and Maintain
Drydocking
Temporary Services, Provide
Sea Trial Performance, Provide Support
Buoy Deck Equipment Emergency Brake Release Hand Pump, Modify
SORS Hold Stowage, Install Rail System
Buoy Chain (In-Haul) Winch, Modify
Crossdeck Winches, Overhaul
Hydraulic Inhaul Winch, Overhaul
Mechanical Chain Stoppers, Overhaul
Warping Capstan, Level 2 Inspect and Repair
Buoy Crane Extension Cylinder, Inspect and Repair
Buoy Crane Main and Auxiliary Flag Block Assemblies, Overhaul
Buoy Crane Luff Cylinder, Overhaul
Buoy Crane Main and Auxiliary Winches, Inspect and Test
Buoy Crane Components (Various), Preserve
Buoy Crane, Structural Assessment
Buoy Crane Upper Crane Cab, Preserve
Grey Water Holding Tanks, Clean and Inspect
Sewage Holding Tanks, Clean and Inspect
Sewage Piping, Clean and Flush
Potable Water Pneumatic Tanks, Clean and Inspect
Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair
Stern Tube Interior Surfaces, Preserve 100%
Deck Covering (Interior Wet/Dry), Renew
Chain Locker, Preserve 100%
Decks - Exterior, Preserve
Mast Preservation
Superstructure Preservation
Sea Valves and Waster Pieces, Overhaul or Renew
Auxiliary Sea Water System Valves, Overhaul Or Renew
Deck Covering (Wet/Dry), Seal
Pilot House Windows, Preserve
Bilges (Machinery Space) - AMR, Preserve
SORS Deck, Preserve
Decks (All Interior) - Upper Level AMR, Preserve
Potable Water Pump Room Deck, Preservation
Chilled Water System Insulation, Renew
Portlight Refurbish
Bilges (Machinery Space) - MMR, Preserve
Bilges (Machinery Space) - Stern Thruster Machinery Room, Preserve
Scuttles, Upgrade
MDE Mount Renewal
Hydraulic Steering Cooler, Install
Composite Labor Rate
GFP Report
Laydays
A Request for Proposal (RFP) will be issued no sooner than 31 Oct 11. For further information concerning this acquisition, contact the POC identified on this Notice. Drawings on CD may be requested by emailing the Contracting Officer at james.altice@uscg.mil