AttJ.2ElectronicSectionB(12RP45059).xls

XLS spreadsheet 29 KB Posted

Attached to
CGC WALNUT (WLB 205) FY12 DRYDOCKING AND REPAIRS
Solicitation number
HSCG85-12-R-P45059
Issued by

About this file

Attachment J.2 Elex Section B

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sect B

Attachment J.1.1 Contractor's FacilityAttachment J.1.1 PHNSY&IMF Facility
Definite (D)

Optional (O)

Work Item No.Work Item TitlePrice *Price *
D-001Hull Plating, U/W Body, Inspect
D-002Hull Plating (U/W Body), Ultrasonic Testing
D-003Appendages (U/W), Leak Test
D-005Voids (Non-Accessible), Leak Test
D-006Chain Lockers, Inspect
D-008Propulsion Shafting Remove, Inspect, and Reinstall
D-009Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal
D-00BGFP ReportNSPNSP
D-010Propulsion Shaft Bearings (External), Check Clearances
D-011Propulsion Tail Shaft Sleeve, Skim Cut
D-012Propulsion Shaft Bearing, Stave Renewal
D-013Controllable Pitch Propeller, System Maintenance
D-014Controllable Pitch Propeller, Hub General Maintenance
D-015Controllable Pitch Propellers, Clean and Inspect
D-016Controllable Pitch Propeller Hub, Remove and Reinstall
D-017Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean
D-018Circuit Breakers (60HZ), Inspect and Test
D-019Fathometer Transducer, General Maintenance
D-020Fwd Scan Sonar Transducer, General Maintenance
D-021Vent Ducts (Engine and Motor Room All), Commercial Cleaning
D-022Vent Ducts (Galley and Pantry Room All), Commercial Cleaning
D-023Vent Ducts (Laundry Exhaust), Commercial Cleaning
D-024Compressed Air Receivers, Clean, Inspect, and Test
D-025Rudder Stock Bearings, Check Clearances
D-026Rudder, Inspect and Repair
D-027Anchor Windlass, Overhaul (Level 2)
D-028Buoy and Cargo Handling Crane Wire Rope, Renew
D-032Cathodic Protection / Zincs, Renew
D-033Impressed Current Cathodic Protection System, Inspect and Maintain
D-034Drydocking
D-035Temporary Services, Provide
D-036Sea Trial Performance, Provide Support
D-038SORS Hold Stowage, Install Rail System
D-039Buoy Chain (In-Haul) Winch, Modify
D-040Crossdeck Winches, Overhaul
D-041Hydraulic Inhaul Winch, Overhaul
D-042Mechanical Chain Stoppers, Overhaul
D-043Warping Capstan, Level 2 Inspect and Repair
D-044Buoy Crane Extension Cylinder, Inspect and Repair
D-045Buoy Crane Main and Auxiliary Flag Block Assemblies, Overhaul
D-046Buoy Crane Luff Cylinder, Overhaul
D-047Buoy Crane Main and Auxiliary Winches, Inspect and Test
D-049Buoy Crane, Structural Assessment
D-051Grey Water Holding Tanks, Clean and Inspect
D-052Sewage Holding Tanks, Clean and Inspect
D-053Sewage Piping, Clean and Flush
D-054Potable Water Pneumatic Tanks, Clean and Inspect
D-059Sea Valves and Waster Pieces, Overhaul or Renew
D-060Auxiliary Sea Water System Valves, Overhaul Or Renew
D-061Deck Covering (Wet/Dry), Seal
D-064SORS Deck, Preserve
D-067Chilled Water System Insulation, Renew
D-068Portlight Refurbish
D-071Hydraulic Steering Cooler, Install
D-072Main Diesel Engine, Mount Upgrade
D-073Pad Eyes, Inspect and Test
D-074Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair
D-075Hull Plating and Structural Members, Inspect (Various Locations )
O-004Appendages (U/W) - Internal, Preserve
O-007Voids (Non-Accessible), Preserve Internal Surfaces
O-029U/W Body, Preserve “Partial – Condition A ”
O-030U/W Body, Preserve “Partial - Condition B”
O-031U/W Body, Preserve “Partial - Condition C ”
O-037Buoy Deck Equipment Emergency Brake Release Hand Pump, Modify
O-048Buoy Crane Components (Various), Preserve
O-050Buoy Crane Upper Crane Cab, Preserve
O-055Stern Tube Interior Surfaces, Preserve 100%
O-056Deck Covering (Interior Wet/Dry), Renew
O-057Chain Locker, Preserve 100%
O-058Decks - Exterior, Preserve
O-062Pilot House Windows, Preserve
O-063Bilges (Machinery Space) - AMR, Preserve
O-065Decks (All Interior) – Upper Level AMR, Preserve
O-066Potable Water Pump Room Deck, Preserve
O-069Bilges (Machinery Space) - MMR, Preserve
O-070Bilges (Machinery Space) - Stern Thruster Machinery Room, Preserve
O-00AComposite Manhour Rate (Section H.2) 3,000 hours X (Rate) _____________=
O-00YLaydaysLay Day Rate (Section H.3) 20 days X (Rate) ______________=
O-00ZTravel and Perdiem
D-0ZZLaydaysLay Day Rate (Section H.3) 20 days X (Rate) ____$3200__________= (SFLC Cost)$0.00$64,000.00
D-0XXPHNS & IMF Support for WI D-34 "Drydocking" (SFLC Cost)$0.00$441,000.00
D-0YYPHNS & IMF Support for WI D-35 "Temporary Services" (SFLC Cost)$0.00$70,000.00
Total Price
* Offerors shall round to the nearest whole dollar.

&CHSCG85-11-R-P45002

CGC SPAR FY12 DD & RPRS

&R&F