CA FTNP GOGA PRES 1(15) Golden Gate N. R. A. Tunnel Preservation

Award Notice Posted

Solicitation number
DTFH6816B00024
Agency
Awarded
to Freyssinet, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6817C00001 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Golden Gate National Recreation Area San Francisco, California 94123, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS SOLICITATION IS ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION).  

AS OF DATE OF THIS AMENDED NOTICE, THE INVITATION FOR BID, PLANS AND SPECIFICATIONS HAVE BEEN UPLOADED.  THE REVISED ADVERSITEMENT DATE IS AUGUST 3 AND BID RESPONSE DUE DATE SEPTEMBER 2, 2016.

ALL OTHER INFORMATION REMAINS THE SAME.


PRESOLICITION NOTICE:

THIS IS NOT AN INVITATION FOR BID.  PLANS AND SPECIFICATIONS ARE NOT CURRENTLY AVAILABLE.  THE TENTATIVE ADVERSITEMENT DATE IS JULY 27, 2016.  THIS PROJECT WILL BE ADVERTSIED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION).


 TYPE OF CONSTRUCTION:  Tunnel Restoration, Resurfacing, Waterline, Sanitary Sewer, Culvert Cleaning and Lighting.


 PROJECT DETAILS:  CA FTNP GOGA PRES 1(15) Golden Gate N.R.A. Tunnel Preservation


 This project is located in the Marin Headlands area of Golden Gate National Recreation Area, Marin County, California.  The project will include preventative maintenance, lighting system replacement, and waterline and sewer line replacement in the one-way, 2,362 foot long Baker-Barry Tunnel, and pavement preservation on 0.12 miles of roadway, parking area resurfacing and rehabilitation, and culvert cleaning on the CA FTNP GOGA PRES 1(15).  Work is included on Bunker Road (including the Baker-Barry Tunnel), Field Road, Mitchell Road, and within the YMCA parking lot in the Marin Headlands


 The project requires specialized, highly technical work within the tunnel including polyurethane resin injection, coring/pressure grouting, shotcrete application, removal and replacement of the existing lighting system with an LED lighting system, and removal and replacement of the existing wall mounted waterline and sewer line.  The LED lighting system will include an addressable energy management system allowing for individual control and monitoring of each luminaire and dynamic dimming of daytime luminaires to correspond to ambient light levels on both the inside and outside of the tunnel within seven daytime zones for each travel direction.


 Principle work items include 35,000 pounds of polyurethane resin injection, 3,500 square yards of shotcrete, 400 linear feet of coring/pressure grouting, 200 ceiling mounted tunnel LED luminaires, 12,500 linear feet of conduit, 2,500 linear feet of 8-inch plastic sewer line, 2,500 linear feet of 10-inch PVS waterline, cleaning 20 culverts, and 900 tons of hot asphalt concrete pavement.


 All of the work is occurring in or adjacent to cultural and natural resource sensitive areas in Golden Gate National Recreation Area, and great attention to detail will be required in achieving customer satisfaction in areas of tunnel maintenance, lighting installation, waterline and sewer line installation, quality control, and timely completion of work.  Construction phasing and temporary traffic will be very important to minimize disruptions to park visitors throughout construction. 


 The estimated price range is between $4,000,000 and $7,000,000. The anticipated advertisement date is July 27, 2016.  Construction is anticipated from October 2016 through February 2017.


 PLEASE NOTE:   The Invitation for Bid will be available for download on or after July 27, 2016, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov.   PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY.  Other information regarding this solicitation will also be available at the above website. 


Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@dot.gov.  The Q&A for this project will be posted on the FBO website as they occur.

Update #1 ·

 

THIS IS NOT AN INVITATION FOR BID.  PLANS AND SPECIFICATIONS ARE NOT CURRENTLY AVAILABLE.  THE TENTATIVE ADVERSITEMENT DATE IS JULY 27, 2016.  THIS PROJECT WILL BE ADVERTSIED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION).


 TYPE OF CONSTRUCTION:  Tunnel Restoration, Resurfacing, Waterline, Sanitary Sewer, Culvert Cleaning and Lighting.


 PROJECT DETAILS:  CA FTNP GOGA PRES 1(15) Golden Gate N.R.A. Tunnel Preservation


 This project is located in the Marin Headlands area of Golden Gate National Recreation Area, Marin County, California.  The project will include preventative maintenance, lighting system replacement, and waterline and sewer line replacement in the one-way, 2,362 foot long Baker-Barry Tunnel, and pavement preservation on 0.12 miles of roadway, parking area resurfacing and rehabilitation, and culvert cleaning on the CA FTNP GOGA PRES 1(15).  Work is included on Bunker Road (including the Baker-Barry Tunnel), Field Road, Mitchell Road, and within the YMCA parking lot in the Marin Headlands


 The project requires specialized, highly technical work within the tunnel including polyurethane resin injection, coring/pressure grouting, shotcrete application, removal and replacement of the existing lighting system with an LED lighting system, and removal and replacement of the existing wall mounted waterline and sewer line.  The LED lighting system will include an addressable energy management system allowing for individual control and monitoring of each luminaire and dynamic dimming of daytime luminaires to correspond to ambient light levels on both the inside and outside of the tunnel within seven daytime zones for each travel direction.


 Principle work items include 35,000 pounds of polyurethane resin injection, 3,500 square yards of shotcrete, 400 linear feet of coring/pressure grouting, 200 ceiling mounted tunnel LED luminaires, 12,500 linear feet of conduit, 2,500 linear feet of 8-inch plastic sewer line, 2,500 linear feet of 10-inch PVS waterline, cleaning 20 culverts, and 900 tons of hot asphalt concrete pavement.


 All of the work is occurring in or adjacent to cultural and natural resource sensitive areas in Golden Gate National Recreation Area, and great attention to detail will be required in achieving customer satisfaction in areas of tunnel maintenance, lighting installation, waterline and sewer line installation, quality control, and timely completion of work.  Construction phasing and temporary traffic will be very important to minimize disruptions to park visitors throughout construction. 


 The estimated price range is between $4,000,000 and $7,000,000. The anticipated advertisement date is July 27, 2016.  Construction is anticipated from October 2016 through February 2017.


 PLEASE NOTE:   The Invitation for Bid will be available for download on or after July 27, 2016, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov.   PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY.  Other information regarding this solicitation will also be available at the above website. 


Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@dot.gov.  The Q&A for this project will be posted on the FBO website as they occur.

Files

File Type Posted
Option_X_Tabs.pdf PDF
Option_Y_Tabs.pdf PDF
Schedule_A_Tabs.pdf PDF
Bid_Opening_Summary_rev.pdf PDF
Bid_Opening_Summary.pdf PDF
Amend0005.pdf PDF
Amend0004.pdf PDF
Amend0003.pdf PDF
Amend0002.pdf PDF
QA3.pdf PDF
QA.pdf PDF
Prebid_8_16_16.pdf PDF
Amend0001.pdf PDF
CA_FTNP_GOGA_PRES_1(15)_-_Construction_Plans_-_Advertisement.pdf PDF
DTFH6816B00024.pdf PDF
Show all 15

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors